What's
New on the GE/Housatonic River Project Web Site
(updated May 2012)
What's New in the Repositories
Web Site Additions:
You will need Adobe Reader to view some of the files on this page. See EPA's PDF page to learn more about PDF, and for a link to the free Acrobat Reader.
| U.S. EPA Housatonic River Mini Workshops |
A series of workshops were held in April and May 2011 by the EPA in response to public requests for additional information and the opportunity to offer input to the "Rest of River" solution. The proceedings of the workshops including presentation materials, video of the sessions, and questions and answers relative to each session are now available at www.HousatonicWorkshops.org . |
May 22, 2012 - addition(s) to Rest of River - Reports
Community Updates / Housatonic River Status Report
Potential Remediation Approaches to the GE-PittsfieldHousatonic River Site "Rest of River" PCB Contamination (PDF) (10 pp, 2.5MB)
May 18, 2012 - addition(s) to General - Reports
Administrative Reports
Administrative Record File Draft RCRA Permit Index, September 2007 (PDF) (8 pp, 199K)
Administrative Record File NTCRA 1 1/2 Mile Reach Nov. 21, 2000 (PDF) (7 pp, 389K)
Administrative Record for the GE-Pittsfield/Housatonic River Consent Decree, 2000 (PDF) (3 pp, 146K)
Administrative Record Index for Reissued RCRA Permit, July 2000 (PDF) (2 pp, 73K)
Administrative Record Index for Allendale School Removal, 1999 (PDF) (9 pp, 373K)
Administrative Record for Removal Actions Outside the River Index, August 4, 1999 (PDF) (7 pp, 384K)
Administrative Record File Index Upper Reach Removal Action, May 1998 (PDF) (50 pp, 1.9MB)
Administrative Record File Removal Action Index, March 1997 (PDF) (8 pp, 393K)
May 17, 2012 - addition(s) to Meetings and Events
EPA, Massachusetts and Connecticut Host Public Meetings on Housatonic River Status
Connecticut meeting will be on Wednesday, May 23, 2012 from 6:30 to 9:00 p.m. at Housatonic Valley Regional High School, 246 Warren Turnpike Road, Falls Village, Conn.
Massachusetts meeting will be held on Thursday, May 24, 2012 from 6:30 – 9:00 p.m. at the Lenox Memorial Middle and High School, 197 East Street, Lenox, Mass.
New Release »
May 17, 2012 - addition(s) to Groundwater - Reports
GMA - 1, East Street Area 1, East Street Area 2, Lyman Street Area, Newell Street Area I, Newell Street Area II, Oxbow B, Silver Lake
Letter from Fisher (USEPA) to Gates (GE), May 14, 2012, Re: Conditional Approval of General Electric's January 5, 2012 submittal titled Revised LNAPL Volatilization Assessment Work Plan for Groundwater Management Area 1 – East Street Area 1 (PDF) (3 pp, 39K)
May 17, 2012 - addition(s) to General - Reports
CD Monthly Status Reports - 2011
April 2012 (PDF) (254 pp, 6.6MB)
May 15, 2012 - addition(s) to Groundwater - Reports
GMA - 4, Hill 78 Area
Letter from Fisher (USEPA) to Gates (GE), May 11, 2012, Re: Conditional Approval of General Electric's March 5, 2012 submittal titled Groundwater Management Area 4, Baseline Assessment Final Report and Long-Term Monitoring Program Proposal for Groundwater Management Area 4, GE-Pittsfield/Housatonic River Site (PDF) (2 pp, 27K)
May 15, 2012 - addition(s) to Housatonic River 1½ Mile - Reports / General - Reports
Final Completion Report and Associated Documentation
Letter (with enclosures) from Tagliaferro (USEPA) to Ruffer (Director, Department of Community Development) and Mitchell (Agent, Conservation Commission), May 11, 2012, Re: Registry of Properties Subject to the GE-Pittsfield Consent Decree-Updated May 2012 (PDF) (28 pp, 6.5MB)
May 10, 2012 - addition(s) to Floodplain Properties - Reports
Phase 4 Floodplain Properties
Memo from Nein (Stantec Consulting) to Czelusniak (Weston Solutions, Inc.), May 3, 2012, Re: 2012 4C Floodplain Vernal Pool Monitoring Summary (PDF) (4 pp, 367K)
May 10, 2012 - addition(s) to Silver Lake - Reports
Silver Lake Sediment and Soils Adjacent to Silver Lake
Letter (with enclosure) from Silfer (GE) to Dickerson (USEPA), May 3, 2012, Re: Silver Lake Area Revised Supplemental Information Package (PDF) (395 pp, 19.4MB)
May 3, 2012 - addition(s) to Groundwater - Reports
GMA - 1, East Street Area 1, East Street Area 2, Lyman Street Area, Newell Street Area I, Newell Street Area II, Oxbow B, Silver Lake
Letter from Fisher (USEPA) to Gates (GE), April 17, 2012, Re: Conditional Approval of General Electric's January 30, 2012 submittal titled Groundwater Management Area 1, Groundwater Quality Monitoring Interim Report for Fall 2011, GE-Pittsfield/Housatonic River Site (PDF) (2 pp, 33K)
GMA - 2, Oxbow Areas J and K
Letter from Fisher (USEPA) to Gates (GE), April 16, 2012, Re: Conditional Approval of General Electric's January 20, 2012 submittal titled Groundwater Management Area 2, Long-Term Monitoring Program Trend Evaluation Report for Fall 2011, GE-Pittsfield/Housatonic River Site (PDF) (3 pp, 38K)
GMA - 3, Unkamet Brook Area
Letter from Fisher (USEPA) to Gates (GE), April 10, 2012, Re: Conditional Approval of General Electric's February 27, 2012 submittal titled Groundwater Management Area 3, Groundwater Quality and NAPL Monitoring Interim Report for Fall 2011, GE-Pittsfield/Housatonic River Site (PDF) (2 pp, 31K)
May 3, 2012 - addition(s) to Cleanup Agreements
Prospective Purchaser Agreement
Letter (with enclosure) from Kilborn (USEPA) to Thurston (PEDA), April 23, 2012, Re; First Amendment of Agreement and Covenant Not to Sue: PEDA (PDF) (17 pp, 3.1MB)
May 3, 2012 - addition(s) to General - Reports
CD Monthly Status Reports - 2011
March 2012 (PDF) (314 pp, 8.2MB)
May 1, 2012 - addition(s) to Silver Lake - Reports
Silver Lake Sediment and Soils Adjacent to Silver Lake
Letter from Dickerson (USEPA) to Silfer (USEPA), April 10, 2012, Re: Request for Extension of Time for Submission of SIP, Silver Lake (PDF) (2 pp, 462K)
Letter from Silfer (GE) to Dickerson (USEPA), April 4, 2012, Re: Silver Lake Area Extension of Time for Submission of Revised Supplemental Information Package and Initiation of On-Site Work/Potential Force Majeure (PDF) (2 pp, 514K)
April 13, 2012 - addition(s) to Cleanup Agreements
Cost Recovery
Letter from Silfer (GE) and McLaren (GE) to Tagliaferro (EPA) and Conway (EPA), April 5, 2012, Re: GE-Pittsfield/Housatonic River Site, Notice of Dispute of Cost Bill under Decree (PDF) (79 pp, 6MB)
April 10, 2012 - addition(s) to Meetings and Events
GE-Housatonic River Citizens Coordinating Council (CCC)
April 4, 2012 Meeting Presentation (PDF) (4 pp, 1.3MB)
April 5, 2012 - addition(s) to Housatonic River ½ Mile - Reports
General Reports
Letter (with attachment) from Mooney (GE) to Tagliaferro (USEPA), March 23, 2012, Re: Upper 1/2-Mile Reach of the Housatonic River Deposited Sediment and Isolation Layer Sampling Plan (PDF) (5 pp, 543K)
April 5, 2012 - addition(s) to Housatonic River 1½ Mile - Reports
Annual Monitoring Reports
Letter from Tagliaferro (USEPA) to Mooney (GE), March 28, 2012, Re: 2011 Annual Monitoring Report 1½ Mile Reach Removal Action GE-Pittsfield/Housatonic River Site, Pittsfield, Massachusetts (PDF) (3 pp, 44K)
March 30, 2012 - addition(s) to Housatonic River 1½ Mile - Reports
Post-Removal Sampling/Work Plans and Reports
Letter (with enclosures) from Mooney (GE) to Tagliaferro (USEPA), March 23, 2012, Re: General Electric Company Pittsfield, Massachusetts 2012 Aquatic Macroinvertebrate Sampling Plan, 1½-Mile Reach of the Housatonic River, March 2012 (PDF) (142 pp, 3MB)
Letter (with enclosures) from Mooney (USEPA) to Tagliaferro (USEPA), March 23, 2012, Re: General Electric Company, Pittsfield, MA., 2012 Sediment Sampling Plan 1½-Mile Reach of the Housatonic River. March 2012 (PDF) (12 pp, 2.2MB)
March 20, 2012 - addition(s) to Housatonic River ½ Mile - Reports
Annual Monitoring Reports
Letter from Tagliaferro (USEPA) to Mooney (GE), March 14, 2012, Re: Conditional Approval of GE's 2011 Annual Monitoring Report Upper ½-Mile Reach of the Housatonic River GE-Pittsfield/Housatonic River Site (PDF) (2 pp, 23K)
March 20, 2012 - addition(s) to Silver Lake - Reports
Silver Lake Sediment and Soils Adjacent to Silver Lake
Letter from Dickerson (USEPA) to Silfer (GE), March 15, 2012, Re: Conditional Approval of GE's January 2012 Supplemental Information Package for Silver Lake Area Removal Action (PDF) (12 pp, 3.8MB)
March 19, 2012 - addition(s) to Current Public Comment Periods
Until April 16, 2012, the public may comment on a proposed amendment to an existing Prospective Purchaser Agreement with the Pittsfield Economic Development Authority (PEDA). This amendment would allow PEDA to acquire certain shoreline parcels at Silver Lake so that a walking path and associated plantings can be constructed on non-private property. In exchange for certain liability protection, PEDA would have to impose institutional controls and protect the natural resource plantings around the walkway. Comments should be sent to John Kilborn, Senior Enforcement Counsel, EPA, at Kilborn.John@epa.gov or John W. Kilborn, Senior Enforcement Counsel, U.S. Environmental Protection Agency, Region I, 5 Post Office Square (Mail Code OES4–3), Boston, MA 02109. See the Federal Register notice for further instructions on how to provide comments.
Notice of Proposed Prospective Purchaser Agreement Amendment Pursuant to the Comprehensive Environmental Response, Compensation and Liability Act of 1980, as Amended by the Superfund Amendments and Reauthorization Act of 1986 (PDF) (2 pp, 206K)
March 16, 2012 - addition(s) to Groundwater - Reports
GMA - 1, East Street Area 1, East Street Area 2, Lyman Street Area, Newell Street Area I, Newell Street Area II, Oxbow B, Silver Lake
Letter (with enclosure) from Gates (GE) to Steenstrup (MADEP) September 1, 2005, Re: East Street Area 1-South Pittsfield, Massachusetts Supplemental Phase II Report (PDF) (83 pp, 20.1MB)
March 16, 2012 - addition(s) to OPCA - Reports
OPCA Reports
Letter from Fisher (USEPA) to Gates (GE), March 8, 2012, Re: Approval of General Electric's February 2, 2012 submittal, Post-Closure Groundwater Monitoring Event Evaluation Report for Hill 78 and Building 71 On-Plant Consolidation Areas for Fall 2011, GE-Pittsfield/Housatonic River Site (PDF) (2 pp, 24K)
March 15, 2012 - addition(s) to Current Public Comment Periods
First Amendment of Agreement and Covenant Not to Sue: Pittsfield Economic Development Authority (PDF) (16 pp, 2.4MB)
March 15, 2012 - addition(s) to General - Reports
CD Monthly Status Reports - 2011
February 2012 (PDF) (232 pp, 4.4MB)
March 12, 2012 - addition(s) to Groundwater - Reports
GMA - 4, Hill 78 Area
Letter (with enclosure) from Gates (GE) to Fisher (USEPA), March 5, 2012, Re: Groundwater Management Area 4 Baseline Assessment Final Report and Long-Term Monitroring Proposal (PDF) (191 pp, 4MB)
March 8, 2012 - addition(s) to GE Plant Area - Reports
NPDES Permit and Support Documents
Letter (with enclosure) from Carroll (GE) to Dart (USEPA) and et al., March 1, 2012, Re: NPDES Permit No. MA0003891 Attachment C - Best Management Practices Plan BMP C.1.a - 2011 Baseline Monitoring Plan Final Summary Report (PDF) (47 pp, 1.5MB)
Letter (with enclosure) from Carroll (GE) to Dart (USEPA) and et al., March 1, 2012, Re: NPDES Permit No. MA0003891 Part I.C.4 and Attachment C - Best Management Practices Plan BMP B.1 - 2011 Annual BMP and SWPPP Related Activities Summary Report (PDF) (45 pp, 1.9MB)
Letter (with enclosure) from Carroll (GE) to Dart (USEPA) and et al., March 1, 2012, Re: NPDES Permit No. MA0003891 64G Quantification Limit Study Report (PDF) (65 pp, 822K)
March 6, 2012 - addition(s) to GE Plant Area - Reports
NPDES Permit and Support Documents
Letter (with enclosure) from Carroll (GE) to Dart (USEPA) and et al, February 27, 2012, Re: NPDES Permit No. MA0003891 Part I.C.2 - Stormwater Pollution Prevention Plan (PDF) (273 pp, 12.1MB)
March 5, 2012 - addition(s) to Groundwater - Reports
GMA - 1, East Street Area 1, East Street Area 2, Lyman Street Area, Newell Street Area I, Newell Street Area II, Oxbow B, Silver Lake
Letter (with enclosure) from Gates (GE) to Fisher (USEPA), February 27, 2012, Re: Groundwater Management Area 1 NAPL Monitoring Report for Fall 2011 (PDF) (332 pp, 21.2MB)
GMA - 3, Unkamet Brook Area
Letter (with enclosure) from Gates (GE) to Fisher (USEPA), February 27, 2012, Re: Groundwater Management Area 3 Groundwater Quality and NAPL Monitoring Interim Report for Fall 2011 (PDF) (277 pp, 8.8MB)
GMA - 5, Oxbow Areas A and C
Letter (with enclosure) from Gates (GE) to Fisher (USEPA), February 27, 2012, Re: Groundwater Management Area 5 Annual Summary Report for 2011 (PDF) (65 pp, 4.7MB)
February 24, 2012 - addition(s) to GE Plant Area - Reports
East Street Area 2 - North
Letter from Tagliaferro (GE) to Attached List, February 8, 2012, Re: Pollution Report (POLREP) 2 and Final East Street Area 2-North Removal Action Area (PDF) (6 pp, 35K)
East Street Area 2 - South
Letter (with attachments) from Gates (GE) to Pelto (MDEP), February 6, 2012, Re: East Street Area 2-South Completion of Installation of Restoration Work Report (PDF) (9 pp, 534K)
February 24, 2012 - addition(s) to General - Reports
CD Monthly Status Reports - 2011
January 2012 (PDF) (231 pp, 6MB)
February 23, 2012 - addition(s) to OPCA - Reports
OPCA Reports
Letter (with enclosure) from Gates (GE) to Fisher (USEPA), February 2, 2012, Re: On Plant Consolidation Areas Monitoring Event Evaluation Report for Fall 2011 (PDF) (221 pp, 22MB)
February 7, 2012 - addition(s) to Housatonic River 1½ Mile - Reports
Annual Monitoring Reports
Letter (with enclosure) from Mooney (GE) to Tagliaferro (USEPA), January 30, 2012, Re: 1 1/2 Mile Reach 2011 Annual Monitoring Report (PDF) (144 pp, 10.6MB)
February 7, 2012 - addition(s) to Housatonic River ½ Mile - Reports
Annual Monitoring Reports
Letter (with enclosure) from Mooney (GE) to Tagliaferro (USEPA), January 30, 2012, Re: Upper 1/2-Mile Reach of the Housatonic River 2011 Annual Monitoring Report (PDF) (46 pp, 4MB)
February 6, 2012 - addition(s) to GE Plant Area - Reports
General
Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA) and Fisher (USEPA), January 23, 2012, Re: GE-Pittsfield/Housatonic River Site; Newell Street Area II, Lyman Street Area, Former Oxbow Areas J and K, and Building 71 and Hill 78 On-Plant Consolidation Areas; Summary of October and November 2011 Tree/Shrub Installation Activities (PDF) (7 pp, 986K)
February 3, 2012 - addition(s) to Groundwater - Reports
GMA - 1, East Street Area 1, East Street Area 2, Lyman Street Area, Newell Street Area I, Newell Street Area II, Oxbow B, Silver Lake
Letter (with enclosure) from Gates (GE) to Fisher (USEPA), January 30, 2012, Re: Groundwater Management Area 1 Groundwater Quality Monitoring Interim Report for Fall 2011 (PDF) (265 pp, 15.2MB)
January 27, 2012 - addition(s) to Groundwater - Reports
GMA - 2, Oxbow Areas J and K
Letter (with enclosure) from Gates (GE) to Fisher (USEPA), January 20, 2012, Re: Groundwater Management Area 2 Long-Term Monitoring Program Trend Evaluation Report for Fall 2011 (PDF) (109 pp, 3.2MB)
January 26, 2012 - addition(s) to OPCA - Reports
OPCA Reports
Letter from Fisher (USEPA) to Gates (GE), January 19, 2012, Re: Approval of General Electric's December 20, 2011 submittal titled On-Plant Consolidation Areas, Final Cover Slope Repair Summary (PDF) (2 pp, 29K)
January 26, 2012 - addition(s) to GE Plant Area - Reports
East Street Area 2 - North
Letter from Eva Tor (MDEP), to Tagliaferro (USEPA), January 18, 2012, Re: East Street Area 2-North Approval of Final Completion Report for East Street Area 2-North Removal Action (PDF) (1 pg, 221K)
Letter (with attachments) from Carroll (GE) to Tagliaferro (USEPA) and Milette (USEPA), January 16, 2012, Re: East Street Area 2-North TSCA CAO No. 01-2002-0049 Building 9 Sub-Vault - Cleanup Plan (PDF) (10 pp, 1.2MB)
January 24, 2012 - addition(s) to GE Plant Area - Reports
East Street Area 2 - North
Letter (with enclosure) from Tagliaferro (USEPA) to Gates (GE), January 19, 2012, Re: EPA Approval of, and Certificate of Completion for, General Electric's submittal entitled Final Completion Report for East Street Area 2-North Removal Action, dated January 2012, GE-Pittsfield/Housatonic River Site (PDF) (3 pp, 27K)
January 24, 2012 - addition(s) to Housatonic River 1½ Mile - Reports
Final Completion Report and Associated Documentation
Letter (with enclosures) from Tagliaferro (USEPA) to Mitchell (City of Pittsfield Conservation Commission), December 16, 2010, Re: Registry of Properties Located within the 100-year Floodplain adjacent to the East Branch of Housatonic River Subject to the GE-Pittsfield Consent Decree—Updated, December 2010 GE-Pittsfield/Housatonic River Site (PDF) (20 pp, 3.4MB)
January 23, 2012 - addition(s) to GE Plant Area - Reports
General
Letter (with attachments) from Carroll (GE) to Tagliaferro (USEPA), August 3, 2010, Re: Former 10c Oil Pipelines at GE Plant Area Investigation, Oil Removal, and Capping Plan (PDF) (57 pp, 14.9MB)
January 18, 2012 - addition(s) to Silver Lake - Reports
Silver Lake Sediment and Soils Adjacent to Silver Lake
Letter (with enclosure) from Silfer (GE) to Dickerson (USEPA), January 12, 2012, Re: Silver Lake Area Supplemental Information Package for Silver Lake Area Removal Action (PDF) (367 pp, 18.2MB)
January 18, 2012 - addition(s) to Floodplain Properties - Reports
Phase 4 Floodplain Properties
Memo from Michael Argue, Weston Solutions, Inc. to Tagliaferro and Svirsky (USEPA), January 11, 2012, Re: GE/Pittsfield/Housatonic River Project 2011 Phase 4C Floodplain Property Vernal Pool Monitoring Summary (PDF) (42 pp, 6.5MB)
January 18, 2012 - addition(s) to General - Reports
CD Monthly Status Reports - 2011
December 2011 (PDF) (265 pp, 5.2MB)
January 17, 2012 - addition(s) to GE Plant Area - Reports
East Street Area 1 - North
Letter from Gates (GE) to Tagliaferro (USEPA), January 4, 2012, Re: East Street Area 1-North Notice of Anticipated Building 69 Demolition Activities (PDF) (2 pp, 96K)
East Street Area 2 - North
Letter (with enclosure) from Gates (GE) to Tagliaferro (USEPA), January 6, 2012, Re: East Street Area 2-North Final Completion Report for East Street Area 2-North Removal Action (PDF) (2,148 pp, 152.5MB)
January 17, 2012 - addition(s) to Groundwater - Reports
GMA - 1, East Street Area 1, East Street Area 2, Lyman Street Area, Newell Street Area I, Newell Street Area II, Oxbow B, Silver Lake
Letter (with enclosure) from Gates (GE) to Fisher (USEPA), January 5, 2012, Re: Groundwater Management Area 1 Revised LNAPL Volatilization Assessment Work Plan for Groundwater Management Area 1 - East Street Area 1 (PDF) (95 pp, 1.6MB)
January 17, 2012 - addition(s) to Housatonic River 1½ Mile - Reports
Post-Removal Inspection Reports
Letter from Mooney (GE) to Mitchell (Pittsfield Conservation Commission), December 28, 2011, Re: Notice Relating to the Registry of Properties Adjacent to East Branch of Housatonic River and Subject to Consent Decree for GE-Pittsfield/Housatonic River Site (PDF) (3 pp, 576K)
January 13, 2012 - addition(s) to Rest of River - Reports
General
Letter (with enclosure) from Silfer (GE) to Svirsky (USEPA), January 9, 2012, Re: Rest of River Report on Fall 2011 Adult Fish Sampling (PDF) (25 pp, 3.3MB)
January 9, 2012 - addition(s) to GE Plant Area - Reports
East Street Area 2 - South
Letter (with attachments) from Gates (GE) to Fisher (USEPA), January 3, 2012, Re: East Street Area 2-South Summary of Initial Post-Remediation Inspection Activities (PDF) (9 pp, 887K)
January 9, 2012 - addition(s) to OPCA - Reports
OPCA Reports
Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), December 20, 2011, Re: On-Plant Consolidation Areas Final Cover Slope Repair Summary (PDF) (12 pp, 1.2MB)
December 29, 2011 - addition(s) to GE Plant Area - Reports
East Street Area 1 - North
Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA) and Gorski (MDEP), December 15, 2011, Re: East Street Area 1-North Summary of 2011 Conditional Solution Inspection Activities (PDF) (6 pp, 163K)
December 29, 2011 - addition(s) to Former Filled Oxbows - Reports
Lyman Street Area and Former Filled Oxbow B
Letter (with attachments) from Gate (GE) to Tagliaferro (USEPA) and Gorski (MDEP), December 16, 2011, Re: Lyman Street Area Summary of Annual ERE Inspection of Portion of the Lyman Street Sidewalk (PDF) (4 pp, 163K)
Letter (with attachments) from Gate (GE) to Tagliaferro (USEPA) and Gorski (MDEP), December 16, 2011, Re: Lyman Street Area Summary of 2011 Conditional Solution Inspection Activities (PDF) (16 pp, 352K)
Former Filled Oxbows A and C
Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Gorski (MDEP), December 16, 2011, Re: Former Oxbow Areas A and C Summary of 2011 Conditional Solution Inspection Activities (PDF) (10 pp, 182K)
Former Filled Oxbows J and K
Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Gorski (MDEP), December 15, 2011, Re: Former Oxbow Areas J and K Summary of 2011 Conditional Solution Inspection Activities (PDF) (10 pp, 177K)
December 27, 2011 - addition(s) to Housatonic River 1½ Mile - Reports
Post-Removal Sampling/Work Plans and Reports
Letter (with attachments) from Mooney (GE) to Tagliaferro (GE) and Gorski (MDEP), December 14, 2011, Re: 1 1/2-Mile Reach of Housatonic River Summary of 2011 Conditional Solution Inspection Activities (PDF) (15 pp, 231K)
Letter (with attachments) from Mooney (GE) to Tagliaferro (GE) and Gorski (MDEP), December 14, 2011, Re: 1 1/2-Mile Reach of Housatonic River Summary of 2011 Annual ERE Inspection Activities (PDF) (12 pp, 215K)
December 27, 2011 - addition(s) to Floodplain Properties - Reports
Residential and Non-Residential Floodplain Properties Adjacent to the 1 1/2 Mile Reach -- General
Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA) and Gorski (MDEP), December 14, 2011, Re: Floodplain Non-Residential Properties Adjacent to 11/2 Mile Reach of Housatonic River Summary of Annual ERE Inspection for Parcels I8-4-7 and I7-1-101 (PDF) (6 pp, 192K)
Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA) and Gorski (MDEP), December 14, 2011, Re: Floodplain Non-Residential Properties Adjacent to 11/2 Mile Reach of Housatonic River Summary of 2011 Conditional Solution Inspection at Parcel I7-1-5 (PDF) (4 pp, 155K)
December 22, 2011 - addition(s) to Former Filled Oxbows - Reports
Newell Street Area I
Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Gorski (MDEP), December 13, 2011, Re: Newell Street Area I Summary of Annual ERE Inspection for Parcels J9-23-24 and J9-23-26 (PDF) (7 pp, 205K)
Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Gorski (MDEP), December 13, 2011, Re: Newell Street Area I Summary of 2011 Conditional Solution Inspection Activities (PDF) (14 pp, 191K)
December 21, 2011 - addition(s) to Former Filled Oxbows - Reports
Newell Street Area II
Former Filled Oxbows J and K
Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Gorski (MDEP), December 13, 2011, Re: Newell Street Area II Summary of Annual ERE Inspection for the City of Pittsfield Property (PDF) (4 pp, 159K)
Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Gorski (MDEP), December 13, 2011, Re: Newell Street Area II Summary of 2011 Conditional Solution Inspection Activities (PDF) (8 pp, 179K)
December 15, 2011 - addition(s) to General - Reports
CD Monthly Status Reports - 2011
November 2011 (PDF) (270 pp, 5.8MB)
December 2, 2011 - addition(s) to Rest of River - Reports
General
Letter (with enclosure) from Mooney (GE) to Peterson (CTDEEP) and Tagliaferro (USEPA), November 9, 2011, Re: Housatonic River, Connecticut Report on 2010 Fish Sampling and Benthic Insect Sampling (PDF) (84 pp, 3.9MB)
December 1, 2011 - addition(s) to GE Plant Area - Reports
East Street Area 1 - North
Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA) and Gorski (MDEP), December 14, 2010, Re: East Street Area 1-North Summary of 2010 Conditional Solution Inspection Activities (PDF) (6 pp, 394K)
November 28, 2011 - addition(s) to Groundwater - Reports
GMA - 1, East Street Area 1, East Street Area 2, Lyman Street Area, Newell Street Area I, Newell Street Area II, Oxbow B, Silver Lake
Letter from Fisher (USEPA), to Gates (GE), November 21, 2011, Re: Conditional Approval of General Electric's August 30, 2011 submittal titled Groundwater Management Area 1, NAPL Monitoring Report for Spring 2011, GEPittsfield/Housatonic River Site (PDF) (3 pp, 42K)
Letter from Fisher (USEPA) to Gates (GE), November 21, 2011, Re: Conditional Approval of General Electric's July 29, 2011 submittal titled Plant Site 1 Groundwater Management Area, Groundwater Quality Monitoring Interim Report for Spring 2011, GE-Pittsfield/Housatonic River Site (PDF) (2 pp, 29K)
GMA - 3, Unkamet Brook Area
Letter from Fisher (USEPA) to Gates (GE), November 21, 2011, Re: Conditional Approval of General Electric's August 30, 2011 submittal titled Groundwater Management Area 3, Groundwater Quality and NAPL Monitoring Interim Report for Spring 2011, GE-Pittsfield/Housatonic River Site (PDF) (3 pp, 49K)
November 23, 2011 - addition(s) to General - Reports
CD Monthly Status Reports - 2011
October 2011 (PDF) (330 pp, 8.2MB)
November 23, 2011 - addition(s) to GE Plant Area - Reports
20s, 30s, and 40s Complexes
Semi-Annual Inspection, Building Demolition Barrier Areas, November 2011, 20s and 30s Complexes, William Stanley Business Park, report prepared for the Pittsfield Economic Development Authority by O'Reilly, Talbot & Okun Associates, Inc (PDF) (22 pp, 2.2MB)
40s Complex
Letter (with report) from Gagnon (O'Reilly, Talbot & Okun), to Ziegler (MDEP) and Tagliaferro (USEPA), November 11, 2011, Re: 40s Other Ground Covering Feature Area and Slab Area Inspection (PDF) (8 pp, 1.1MB)
November 22, 2011 - addition(s) to Groundwater - Reports
GMA - 1, East Street Area 1, East Street Area 2, Lyman Street Area, Newell Street Area I, Newell Street Area II, Oxbow B, Silver Lake
Letter from Fisher (USEPA) to Gates (GE), November 7, 2011, Re: Conditional Approval of General Electric's March 11, 2011 submittal titled Groundwater Management Area 1, NAPL Monitoring Report for Fall 2010, GE-Pittsfield/Housatonic River Site (PDF) (7 pp, 48K)
GMA - 2, Oxbow Areas J and K
Letter from Fisher (USEPA) to Gates (GE), November 7, 2011, Re: Conditional Approval of General Electric's August 5, 2011 submittal titled Groundwater Management Area 2, Long-Term Monitoring Program Monitoring Event Evaluation Report for Spring 2011, GE-Pittsfield/Housatonic River Site (PDF) (2 pp, 23K)
November 22, 2011 - addition(s) to Housatonic River 1½ Mile - Reports
Post-Removal Inspection Reports
Letter from Tagliaferro (USEPA) to Mooney (GE), November 8, 2011, Re: September 13, 2011 Post-Storm Inspection of Riverbank Soil Restoration, Riprap, and Aquatic Habitat Enhancement Structures Report; 1½ Mile Reach Removal Action, GE-Pittsfield/Housatonic River Site, Pittsfield, Massachusetts (PDF) (2 pp, 19K)
November 7, 2011 - addition(s) to GE Plant Area - Reports
NPDES Permit and Support Documents
Letter (with enclosure) from Carroll (GE) to Dart (USEPA), November 1, 2011, Re: NPDES Permit No. MA0003891 Part I. E. - Dry Weather Ambient Monitoring Plan (PDF) (30 pp, 3.4MB)
November 7, 2011 - addition(s) to Meetings and Events
GE-Housatonic River Citizens Coordinating Council (CCC) - September 14, 2011 Meeting
Draft Meeting Summary (PDF) (14 pp, 151K)
Housatonic River/Silver Lake Water Sampling June to August 2011 (PDF) (4 pp, 1.7MB)
November 4, 2011 - addition(s) to OPCA - Reports
OPCA Reports
Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), October 26, 2011, Re: On-Plant Consolidation Areas Slope Repair Proposal (PDF) (5 pp, 940K)
November 3, 2011 - addition(s) to Floodplain Properties - Reports
Phase 4 Floodplain Properties
Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), October 21, 2011, Re: Floodplain Residential and Non-Residential Properties Adjacent to 1 1/2 Mile Reach of Housatonic River Summary of September 2011 Inspection Activities for the Group 4C Floodplain Properties (PDF) (33 pp, 2.3MB)
November 3, 2011 - addition(s) to OPCA - Reports
OPCA Reports
Letter (with attachments) from Gates (GE) to Fisher (USEPA), October 26, 2011, Re: Building 71 and Hill 78 On-Plant Consolidation Areas Summary of September 2011 Post-Closure Inspection Activities (PDF) (23 pp, 4.9MB)
November 3, 2011 - addition(s) to GE Plant Area - Reports
East Street Area 2 - North
Letter (with attachments) from Gates (GE) to Fisher (USEPA), October 20, 2011, Re: East Street Area 2-North Summary of September 2011 Post-Storm Inspection Activities (PDF) (11 pp, 1.2MB)
Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), October 20, 2011, Re: East Street Area 2-North 19s Complex Demolition and Site Restoration Program Summary of September 2011 Post-Storm Inspection of Restored Areas Where Usable Crushed Building Materials Were Placed (PDF) (6 pp, 816K)
Hill 78 Area - Remainder
Letter (with attachments) from Gates (GE) to Fisher (USEPA), October 26, 2011, Re: Hill 78 Area-Remainder Summary of September 2011 Inspection Activities (PDF) (5 pp, 1MB)
November 3, 2011 - addition(s) to Former Filled Oxbows - Reports
Lyman Street Area and Former Filled Oxbow B
Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), October 19, 2011, Re: Lyman Street Area Summary of September 2011 Inspection Activities (PDF) (25 pp, 1.3MB)
Former Filled Oxbows J and K
Letter (with attachments) from Gates (GE) to Fisher (USEPA), October 21, 2011, Re: Former Oxbow Areas J and K Summary of September 2011 Inspection Activities (PDF) (27 pp, 2.6MB)
November 1, 2011 - addition(s) to OPCA - Reports
OPCA Reports
Letter from Fisher (USEPA) to Gates (GE), October 28, 2011, Re: Conditional Approval of General Electric's October 26, 2011 submittal titled On-Plant Consolidation Areas, Slope Repair Proposal (PDF) (2 pp, 28K)
October 31, 2011 - addition(s) to GE Plant Area - Reports
NPDES Permit and Support Documents
Letter (with attachment) from Carroll (GE) to Dart (USEPA), September 22, 2011, Re: NPDES Permit No. MA0003891 Part I.E. - Dry Weather Ambient Monitoring Plan (PDF) (5 pp, 811K)
October 31, 2011 - addition(s) to Rest of River - Maps/Figures/Schedules
Total PCB Results for Reaches 7, 8, & 9
Columbia Mill Dam Sediment and Soil Total PCB Results (PDF) (12 pp, 1.7MB)
October 27, 2011 - addition(s) to Housatonic River 1½ Mile - Reports
Post-Removal Inspection Reports
Letter from Tagliaferro (USEPA) to Mooney (GE), October 21, 2011, Re: Summer 2011 Re-Vegetation Monitoring Report 1 1/2 Mile Reach Removal Action (PDF) (3 pp, 38K)
October 24, 2011 - addition(s) to Floodplain Properties - Reports
Phase 2 Floodplain Properties
Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), October 12, 2011, Re: Floodplain Residential and Non-Residential Properties Adjacent to 1 1/2 Mile Reach of Housatonic River Summary of September 2011 Inspection Activities at the Remediated Phase 2 Residential Floodplain Properties (PDF) (11 pp, 4.4MB)
Phase 3 Floodplain Properties
Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), October 12, 2011, Re: Floodplain Residential Properties Adjacent to 1 1/2 Mile Reach of Housatonic River Summary of September 2011 Inspection Activities for the Phase 3 Floodplain Properties (PDF) (26 pp, 2.8MB)
October 24, 2011 - addition(s) to GE Plant Area - Reports
40s Complex
Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), October 14, 2011, Re: 40s Complex Summary of Annual Inspection Activities at the Former 40s Complex (PDF) (9 pp, 638K)
East Street Area 2 - North
Letter from Owens (USEPA) to Carroll (GE) and Thurston (PEDA), October 13, 2011, Re: Potential Transfer of Woodlawn Avenue from GE to PEDA Prior to Certification of Completion of East Street 2-North Removal Action (PDF) (2 pp, 292K)
East Street Area 2 - South & City Recreational Area
Letter (with attachments) from Gates (GE) to Fisher (USEPA), October 14, 2011, Re: East Street Area 2-South Summary of September 2011 Inspection Activities-City Recreational Area (PDF) (5 pp, 259K)
October 24, 2011 - addition(s) to Former Filled Oxbows - Reports
Former Filled Oxbows A and C
Letter (with attachments) from Gates (GE) to Fisher (USEPA), October 14, 2011, Re: Former Oxbow Areas A and C Summary of September 2011 Inspection Activities (PDF) (15 pp, 1.2MB)
Newell Street Area I
Letter (with attachments) from Gates (GE) to Fisher (USEPA), October 14, 2011, Re: Newell Street Area I Summary of September 2011 Post-Storm Inspection Activities (PDF) (24 pp, 2MB)
Newell Street Area II
Letter (with attachments) from Gates (GE) to Fisher (USEPA), October 14, 2011, Re: Newell Street Area II Summary of September 2011 Post-Storm Inspection Activities (PDF) (27 pp, 644K)
October 20, 2011 - addition(s) to Housatonic River 1½ Mile - Reports
Letter (with attachments) from Mooney (GE) to Tagliaferro (USEPA), October 13, 2011, Re: 1 1/2 Mile Reach September 13, 2011 Post-Storm Inspection of Riverbank Soil Restoration, Riprap, and Aquatic Habitat Enhancement Structures (PDF) (20 pp, 3.1MB)
Letter from Tagliaferro (USEPA) to Mooney (GE), October 12, 2011, Re: 2011 Inspection of Riverbank Soil Restoration, Riprap, Aquatic Habitat Enhancement Structures, and Critical Ancillary Items Report & Supplemental Inspection of Critical Ancillary Items and Certain Associated Items Report; 1½ Mile Reach Removal Action GE-Pittsfield/Housatonic River Site, Pittsfield, Massachusetts (PDF) (3 pp, 26K)
October 18, 2011 - addition(s) to Groundwater - Reports
GMA - 4, Hill 78 Area
Letter form Fisher (USEPA) to Gates (GE), October 12, 2011, Re: Approval of General Electric's August 30, 2011 submittal titled Groundwater Management Area 4, Groundwater Quality Monitoring Interim Report for Spring 2011 (PDF) (2 pp, 33K)
October 13, 2011 - addition(s) to General - Reports
CD Monthly Status Reports - 2011
September 2011 (PDF) (192 pp, 3MB)
October 5, 2011 - addition(s) to OPCA - Reports
OPCA Reports
Letter (with attachments) from Gates (GE) to Fisher (USEPA), September 23, 2011, Re: Building 71 and Hill 78 On-Plant Consolidation Areas Summary of Unscheduled Inspection Activities in Late August and Early September 2011 (PDF) (23 pp, 4.4MB)
October 4, 2011 - addition(s) to OPCA - Reports
OPCA Reports
Letter (with enclosure) from Fisher (USEPA) to Gates (GE), September 26, 2011, Re: EPA Approval of, and Certificates of Completion for, General Electric's submittal entitled Final Completion Report - On-Plant Consolidation Areas, dated September 2011 (PDF) (4 pp, 715K)
October 3, 2011 - addition(s) to OPCA - Reports
OPCA Reports
Letter from Fisher (USEPA) to POLREP DISTRIBUTION LIST, September 29, 2011, Re: Pollution Report (POLREP) 2 and Final Site: Building 71 Consolidation Area Removal Action Area, GE-Pittsfield/Housatonic River Site, Pittsfield, Massachusetts (PDF) (5 pp, 76K)
Letter from Fisher (USEPA) to POLREP DISTRIBUTION LIST, September 29, 2011, Re: Pollution Report (POLREP) 2 and Final Site: Hill 78 Consolidation Area Removal Action Area (RAA), GE-Pittsfield/Housatonic (PDF) (5 pp, 77K)
September 30, 2011 - addition(s) to Housatonic River 1½ Mile - Reports
Post-Removal Inspection Reports
Letter (with enclosure) from Mooney (GE) to Tagliaferro (USEPA), August 31, 2011, Re: 1 1/2 Mile Reach Supplemental Inspections of Critical Ancillary Items and Certain Associated Items (PDF) (21 pp, 2MB)
Letter (with enclosure) from Mooney (GE) to Tagliaferro (GE), August 24, 2011, Re: 1 1/2 Mile Reach Summer 2011 Re-Vegetation Monitoring Report (PDF) (95 pp, 5.7MB)
September 29, 2011 - addition(s) to Rest of River - Reports
General
Letter from Silfer (GE) to Svirsky (USEPA), September 22, 2011, Re: Rest of River EPA Request for Additional Rest of River Data (PDF) (3 pp, 1.5MB)
September 29, 2011 - addition(s) to OPCA - Reports
OPCA Reports
Letter from Eva V. Tor (MDEP) to Tagliaferro (USEPA), September 22, 2011, Re:Approval of Final Completion Report for the On-Plant Consolidation Areas (PDF) (1 pg, 230K)
September 27, 2011 - addition(s) to Silver Lake - Reports
Soils Adjacent to the Silver Lake
Letter from Dickerson (USEPA) to Silfer (GE), August 25, 2011, Re: Conditional Approval of GE's August 2011 Revised Final Removal Design/Removal Action Work Plan for Silver lake Area (PDF) (4 pp, 978K)
September 27, 2011 - addition(s) to Housatonic River ½ Mile - Reports
Inspection Reports
Letter (with enclosure) from Mooney (GE) to Tagliaferro (USEPA), September 22, 2011, Re: Upper 1/2-Mile Reach of Housatonic River 2011 Inspection of Aquatic Habitat Enhancement Structures and Armor Stone (PDF) (13 pp, 861K)
September 27, 2011 - addition(s) to GE Plant Area - Reports
Hill 78 Area - Remainder
Letter from Fisher (USEPA) to polrep distribution list, September 8, 2011, Re: Pollution Report (POLREP) 2 and Final Hill 78 Area-Remainder Removal Area (PDF) (6 pp, 78K)
Letter from Eva V. Tor (MDEP) to Tagliaferro (USEPA), September 1, 2011, Re: Approval of Final Completion Report for the Hill 78 Area-Remainder Removal Action (PDF) (1 pg, 230K)
September 23, 2011 - addition(s) to GE Plant Area - Reports
20s Complex
Letter (with attachments) from Gates (GE) to Gorski (MDEP) and Tagliaferro (USEPA), September 13, 2011, Re: 20s Complex Summary of Annual ERE Inspection for 2011 (PDF) (6 pp, 1.8MB)
30s Complex
Letter (with attachments) from Gates (GE) to Gorski (MDEP) and Tagliaferro (USEPA), September 13, 2011, Re: 30s Complex Summary of Annual ERE Inspection for 2011 (PDF) (8 pp, 1.9MB)
40s Complex
Letter (with attachments) from Gates (GE) to Gorski (MDEP) and Tagliaferro (USEPA), September 13, 2011, Re: 40s Complex Summary of Annual ERE Inspection for 2011 (PDF) (7 pp, 1.7MB)
East Street Area 2 - North
Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), September 9, 2011, Re: East Street Area 2-North 19s Complex Demolition and Site Restoration Program Summary of Third Semi-Annual Inspection of the Vegetation over the Placed Useable Crushed Building Material (PDF) (11 pp, 4.3MB)
September 23, 2011 - addition(s) to Former Filled Oxbows - Reports
Newell Street Area I
Letter (with attachment) from Gates (GE) to Fisher (USEPA), September 14, 2011, Re: Newell Street Area I Summary of August 2011 Inspection Activities (PDF) (25 pp, 2.3MB)
Newell Street Area II
Letter (with attachments) from Gates (GE) to Fisher (USEPA), September 16, 2011, Re: Newell Street Area II Summary of August 2011 Inspection Activities (PDF) (66 pp, 1.4MB)
September 22, 2011 - addition(s) to Rest of River - Reports
Letter (with enclosure) from Silfer (GE) to Svirsky (USEPA), September 16, 2011, Re: Rest of River Evaluation of Young-of-the-Year Fish PCB Data (PDF) (27 pp, 3.7MB)
September 20, 2011 - addition(s) to OPCA - Reports
OPCA Reports
Letter (with enclosure) from Gates (GE) to Tagliaferro (USEPA), September 15, 2011, Re: On-Plant Consolidation Areas Final Completion Report - On-Plant Consolidation Areas (PDF) (5,920 pp, 245.6MB)
September 16, 2011 - addition(s) to General - Reports
CD Monthly Status Reports - 2011
August 2011 (PDF) (188 pp, 2.6MB)
September 15, 2011 - addition(s) to Rest of River - Reports
General
Letter from Svirsky (USEPA) to Silfer (GE), September 9, 2011, Re: Data for Rest of River (PDF) (3 pp, 27K)
September 12, 2011 - addition(s) to GE Plant Area - Reports
Hill 78 Area - Remainder
Letter (with enclosure) from Fisher (USEPA) to Gates (GE), September 6, 2011, Re: EPA Approval of, and Certificate of Completion for, General Electric's submittal entitled Final Completion Report for the Hill 78 Area-Remainder Removal Action, dated August 2011, GE-Pittsfield/Housatonic River Site, Pittsfield, Massachusetts (PDF) (32 pp, 378K)
September 7, 2011 - addition(s) to Groundwater - Reports
GMA - 1, East Street Area 1, East Street Area 2, Lyman Street Area, Newell Street Area I, Newell Street Area II, Oxbow B, Silver Lake
Letter (with enclosure) from Gates (GE) to Fisher (USEPA), August 30, 2011, Re: Groundwater Management Area 1 NAPL Monitoring Report for Spring 2011 (PDF) (192 pp, 8.7MB)
GMA - 3, Unkamet Brook Area
Letter (with enclosure) from Gates (GE) to Fisher (USEPA), August 30, 2011, Re: Groundwater Management Area 3 Groundwater Quality and NAPL Monitoring Interim Report for Spring 2011 (PDF) (299 pp, 9.8MB)
GMA - 4, Hill 78 Area
Letter (with enclosure) from Gates (GE) to Fisher (USEPA), August 30, 2011, Re: Groundwater Management Area 4 Groundwater Quality Monitoring Interim Report for Spring 2011 (PDF) (243 pp, 6.4MB)
September 7, 2011 - addition(s) to GE Plant Area - Reports
Hill 78 Area - Remainder
Letter (with enclosure) from Gates (GE) to Fisher (USEPA), August 30, 2011, Re: Hill 78 Area-Remainder Final Completion Report (PDF) (907 pp, 57.7MB)
September 1, 2011 - addition(s) to Allendale - Reports
EPA Allendale School PCB Air Sampling Results for 2011 (PDF) (1 pg, 14K)
September 1, 2011 - addition(s) to OPCA - Reports
OPCA PCB Ambient Air Sampling Results
Comparison of EPA and GE OPCA Replicate PCB Air Sampling Results for 2011 (PDF) (1 pg, 15K)
GE's PCB Air Sampling Results for 2011(PDF) (1 pg, 17K)
August 26, 2011 - addition(s) to GE Plant Area - Reports
NPDES Permit and Support Documents
Letter from Denny Dart (USEPA) to Carroll (GE), August 19, 2011, Re: General Electric Company's April 21, 2011 Response to EPA's Comments on General Electric Company's October 17, 2010 submittal titled Dry Weather Ambient Monitoring Plan, GE - Pittsfield/Housatonic River Site NPDES Permit No. MA0003891 (PDF) (2 pp, 629K)
August 22, 2011 - addition(s) to Former Filled Oxbows - Reports
Lyman Street Area and Former Filled Oxbow B
Letter (with attachments) from Gates (GE) to Pelto (MADEP), August 12, 2011, Re: Lyman Street Area Summary of July 2011 Inspection of Natural Resource Restoration/Enhancement Measures (PDF) (20 pp, 1.4MB)
Newell Street Area II
Letter (with attachments) from Gates (GE) to Pelto (MADEP), August 12, 2011, Re: Newell Street Area II Summary of July 2011 Inspection of Natural Resource Restoration/Enhancement Measures (PDF) (11 pp, 1.9MB)
August 22, 2011 - addition(s) to OPCA - Reports
OPCA Reports
Letter (with attachments) from Gates (GE) to Pelto (MADEP), August 12, 2011, Re: Hill 78 On-Plant Consolidation Area Summary of July 2011 Inspection of Natural Resource Restoration/Enhancement Measures (PDF) (12 pp, 2.2MB)
August 15, 2011 - addition(s) to General - Reports
CD Monthly Status Reports - 2011
July 2011 (PDF) (191 pp, 2.8MB)
August 12, 2011 - addition(s) to OPCA - Reports
OPCA Reports
Letter from Karen I. Pelto (MDEP) to Gates (GE), August 4, 2011, Re: May and July 2011 NRR/E Inspections, Hill 78 On-Plant Consolidation Area (PDF) (2 pp, 148K)
August 12, 2011 - addition(s) to Housatonic River 1½ Mile - Reports
Post-Removal Inspection Reports
Letter from Tagliaferro (USEPA) to Mooney (GE), August 8, 2011, Re: Spring 2011 Re-Vegetation Monitoring Report 1 1/2 Mile Reach Removal Action (PDF) (2 pp, 24K)
August 12, 2011 - addition(s) to Groundwater - Reports
GMA - 2, Oxbow Areas J and K
Letter (with enclosure) from Gates (GE) to Fisher (USEPA), August 5, 2011, Re: Goundwater Management Area 2 Long-Term Monitoring Program Monitoring Event Evaluation Report for Spring 2011 (PDF) (82 pp, 1.7MB)
August 11, 2011 - addition(s) to Silver Lake - Reports
Silver Lake Sediment and Soils Adjacent to Silver Lake
Letter (with enclosure) from Silfer (GE) to Dickerson (USEPA), August 3, 2011, Re: Silver Lake Area Revised Final Removal Design/Removal Action Work Plan for Silver Lake Area (PDF) (580 pp, 43.4MB)
August 9, 2011 - addition(s) to GE Plant Area - Reports
NPDES Permit and Support Documents
Letter (with list of enclosures) from Carroll (GE) to Pitt (USEPA), July 29, 2011, Re: NPDES Permit No. MA0003891 Attachment C - Best Management Practices Plan BMP C.1.a - 2011 Baseline Monitoring Plan Semi-Annual Interim Status Report (PDF) (47 pp, 2.6MB)
August 4, 2011 - addition(s) to Groundwater - Reports
GMA - 1, East Street Area 1, East Street Area 2, Lyman Street Area, Newell Street Area I, Newell Street Area II, Oxbow B, Silver Lake
Letter (with enclosure) from Gates (GE) to Fisher (USEPA), July 29, 2011, Re: Groundwater Management Area 1 Groundwater Quality Monitoring Interim Report for Spring 2011 (PDF) (172 pp, 5.2MB)
August 1, 2011 - addition(s) to Rest of River - Reports
Corrective Measures Study - Reports and Documents
Combined Stakeholder Comments to National Remedy Review Board, Revised Corrective Measures Study (CMS) Report, Rest of River, July 2011(PDF) (250 pp, 14MB)
What's New at the Repositories
(the following PDFs are posted for 6
months)
Documents submitted to the Repositories
between
- March 25, 2012 to April 21, 2012 (PDF) (1 pg, 14K)
- March 11, 2012 to March 24, 2012 (PDF) (1 pg, 11K)
- February 12, 2012 to March 10, 2012 (PDF) (2 pp, 17K)
- January 29, 2012 to February 11, 2012 (PDF) (1 pg, 15K)
- January 15, 2012 to January 28, 2012 (PDF) (1 pg, 11K)
- January 1, 2012 to January 14, 2012 (PDF) (1 pg, 15K)
- December 11, 2011 to December 31, 2011 (PDF) (1 pg, 10K)
- November 20, 2011 to December10, 2011 (PDF) (1 pg, 10K)
- November 6, 2011 to November 19, 2011 (PDF) (1 pg, 15K)
- October 23, 2011 to November 5, 2011 (PDF) (1 pg, 10K)
- October 9, 2011 to October 22, 2011 (PDF) (3 pp, 20K)
- September 25, 2011 to October 8, 2011 (PDF) (1 pg, 10K)
- September 10, 2011 to September 24, 2011 (PDF) (2 pp, 16K)
- August 28, 2011 to September 10, 2011 (PDF) (1 pg, 16K)
- August 14, 2011 to August 27, 2011 (PDF) (1 pg, 10K)
- July 17, 2011 to August 13, 2011 (PDF) (1 pg, 15K)
- July 3, 2011 to July 16, 2011 (PDF) (1 pg, 9K)
- June 19, 2011 to July 2, 2011 (PDF) (2 pp, 17K)
Resources
Press Releases
Public Events & Meetings