Significant
Issues - (APRIL-JUNE 2003):
- Congressional: None at this time.
- High profile items:None at this time.
- Delays in Environmental Restoration Activities: None
at this time.
Issues
Impacting Reuse/Transfer:
EPA and MDEQ have provided their comments on the Consolidated
Remedial Action Plan (C-RAP). EPA did not raise any issues that
would impact reuse/transfer. MDEQ's issues may potentially impact
reuse/transfer since they continue to assert many sites are inadequately
characterized.
|
FOST |
FOLSL |
FOSET-CDR |
OPS |
Completed to Date in FY |
#
(Source: CERCLIS) |
#
(Source: CERCLIS) |
#
(Source: CERCLIS) |
#
(Source: CERCLIS) |
Major
BCT achievements or successes:
- Technology Optimization, Partnering, Property Transfer:
- Achievements: Achievement. On May 13, a representative
of the US Forest Service (USFS) joined the BCT in conducting
a field reconnaissance of Site LF-27, which is intended
to be transferred to the USFS after remedial action is complete.
- Issues: None at this time
- Community Activities (e.g., RAB and statutory community involvement
activities)::
- Achievements: None at this time.
- Issues: None at this time
- Any relevant installation issue not covered elsewhere.
- Document Review: During this reporting period,
EPA provided comments on the Consolidated Remedial Action
Plan (C-RAP). EPA also provided comments on a Supplemental
Remedial Investigation, the Land Use Control/Institutional
Control Worksheet, and several technical plans and letters.
- Fieldwork/Construction. During this reporting period,
the Site TW-44 and "Gap Area" groundwater investigation
was conducted. The oil water separator (OWS)/ soil removal
project at Site ST-68 was conducted. Lastly, long-term groundwater
and surface water monitoring was conducted at several sites.
- Treatment Systems. The Arrow Street groundwater
pump and treat system, the Benzene Plant air stripping system,
the Mission Street air stripping system, the SS-06 bioventing
system and the soil vapor extraction/air sparge system,
the FT-02 soil vapor extraction system, and the LF-30/31
air sparge/pump and treat system continue to be operated
and maintained.
- BCT Meeting. Two BCT meetings were held during
the reporting period. Results of recent sampling events
and sites requiring further investigation were included
as topics at the meetings.
Staffing/Funding Issues: None
at this time.
|