Jump to main content or area navigation.

Contact Us

EPA's Region 6 Office

Serving: Arkansas, Louisiana, New Mexico, Oklahoma, Texas, and 66 Tribal Nations

NPDES STORM WATER PROGRAM
Hot Topics

NOTE: Several links take you to other sites, you may have to back up or close the new window to return to this page. Many of the guidance documents, permits, etc. available on-line are in PDF format and you will need the free Adobe Reader to view some of the files on this page. See EPA's PDF page to learn more.

One Year Extension for Construction General Permit Proposed

Construction and Development Effluent Limitation Guidelines Issued

EPA Starts Work on Regulations to Control Post Construction Stormwater

NEW: 16th Annual Region 6 Stormwater Conference will be in Fort Worth, TX July 27 - August 1, 2014

NEW:Call for papers, 16th Annual Stormwater Conference in Fort Worth, TX July 27 - August 1, 2014. (PDF)(262KB,1pp)

Region 6 Green Infrastructure

Center for Watershed Protection's Urban Stormwater Retrofit Practices Manual Available for Download

EPA's December 2007 Report on Reducing Stormwater Costs through Low Impact Development (LID) Strategies and Practices

Developing Your Stormwater Pollution Prevention Plan: A Guide for Construction Sites

Want to Know More about Green Infrastructure and its Benefits?

eNOI web-based Notice of Intent system now available for BOTH the Multi-Sector General Permit AND the Construction General Permit (also for Notices of Termination)


eNOI System Now Available for BOTH the MSGP and the CGP: You may now enter Multi-Sector General Permit (MSGP: industrial storm water) as well as Construction General Permit (CGP) Notice of Intents (NOIs) and Notice of Terminations (NOTs) online via the eNOI system. You may also search the NOI database online for both MSGP and

Jump to main content.