AR Net Metering Standards
Type of IncentiveNet Metering
Eligible StatesAR
Eligible TechnologyBackpressure Turbine, Boiler, Combustion Turbine, Condensing Turbine, Extracting Turbine, Fuel Cell, Microturbine, Other, Reciprocating Engine, Heat Recovery Generator, Stirling Engine
Eligible FuelBiogas, Biomass, Hydrogen, LFG, Natural Gas, Other
Eligible Project Size0.025 - 0.3
Number of Awards

 

Size of AwardEligible Technologies: Solar Thermal Electric, Photovoltaics, Wind, Biomass, Hydroelectric, Geothermal Electric, Fuel Cells, Microturbines using renewable fuels.

Size Limitations: Up to 25 kw for residential use, and 300 kW for non-residential use.

Overall Enrollment Restrictions: None

Net Excess: Granted to the utility at the end of every month.
Start Date7/26/2002
End Date

 

Minimum Efficiency(%)

 

Additional InformationNet metering regulations were enacted by the Arkansas Public Service Commission (PSC) on July 26, 2002. These rules state that any excess net generation will be granted back to the utility each month. Subsequent legislation enacted in April 2007 (HB 2334) bolstered the existing statute by increasing the availability of net metering, improving the law's provision for the carryover of net excess generation (NEG), and clarifying the ownership of "renewable-energy credits" (RECs). Nevertheless, the PSC is going to review this condition since it discourages net metering.
Web Sitehttp://170.94.29.3/rules/net_metering_rules.pdf Exit EPA
Additional Web Sitehttp://www.dsireusa.org/library/includes/
incentive2.cfm?Incentive_Code=AR03R&state=AR&CurrentPageID=1&RE=1&EE=1
Exit EPA
Primary ContactJenny Ahlen