Funding Resources
Funding Resources
| CT DG Backup Rates | |
|---|---|
| Type of Incentive | Utility Rates |
| Eligible States | CT |
| Eligible Technology | Backpressure Turbine, Boiler, Combustion Turbine, Condensing Turbine, Extracting Turbine, Fuel Cell, Microturbine, Other, Reciprocating Engine, Heat Recovery Generator, Stirling Engine |
| Eligible Fuel | # 2 Fuel Oil, # 6 Fuel Oil, Biogas, Biomass, Coal, Hydrogen, LFG, Municipal Solid Waste, Natural Gas, Other, Tire-Derived Fuel, Waste Heat Recovery |
| Eligible Project Size | All (MW) |
| Number of Awards |
|
| Size of Award | Under the capital grant program, the electric cost associated with power used when base load customer-side generation is out of service can be reduced. This is done by eliminating backup rates and demand ratchets for customers who install these projects. |
| Start Date | 3/27/2006 |
| End Date |
|
| Minimum Efficiency(%) |
|
| Additional Information | Generation that will be interconnected to the distribution system must comply with certain standards. Further, some projects are required to participate in the ISO-NE's Demand Response Programs. |
| Web Site | http://www.state.ct.us/dpuc/dg.htm ![]() |
| Primary Contact | Bryan Barbera P.O. Box 270 Hartford, CT 6141 U.S.A. Bryan Barbera (barbebc@nu.com) (860) 665-6249 |
| Additional Contact Name | Rita King 157 Church Street New Haven, CT 6510 U.S.A. Rita King (rita.king@uinet.com) (203) 499-2285 |
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)
