KS Interconnection Standards
Type of Incentive Interconnection
Eligible States KS
Eligible Technology Backpressure Turbine, Boiler, Combustion Turbine, Condensing Turbine, Extracting Turbine, Fuel Cell, Microturbine, Other, Reciprocating Engine, Heat Recovery Generator, Stirling Engine
Eligible Fuel Biogas, Biomass, Hydrogen, LFG, Municipal Solid Waste, Other, Tire-Derived Fuel
Eligible Project Size 0-5
Number of Awards  
Size of Award Eligible Technologies: Distributed renewable energy systems Size Limitations: 5 MW
Start Date 2/16/2006
End Date

 

Minimum Efficiency(%)

 

Additional Information On August 7, 2007, the Kansas Corporation Commission (KCC) issued an order in docket 07-GIME-104-GIV (based on EPAct 2005 requirements) that no changes to the state's interconnection standards were necessary. On February 16, 2006, KCC docket 04-GIME-080-GIE (opened July 23, 2003) established statewide interconnection standards for distributed renewable energy systems up to 5 MW. The docket was the result of the legislature passing a bill in April 2003 establishing standard interconnection.
Web Site http://www.kcc.state.ks.us/scan/200708/20070807082551.pdf Exit EPA
Additional Web Site http://www.kcc.state.ks.us/scan/200607/20060728114301.pdf Exit EPA
Primary Contact Ray Hammarlund
Director, State Energy Office
1300 SW Arrowhead Road, Suite 100
Topeka, KS 66604
U.S.A.
Ray Hammarlund (r.hammarlund@kcc.ks.gov)
(785) 271-3179
(785) 271-3268

Top of Page


Local Navigation


Jump to main content.