Funding Resources
Funding Resources
| Portland General Electric Standby Rate | |
|---|---|
| Type of Incentive | Utility Rates |
| Eligible States | OR |
| Eligible Technology | Backpressure Turbine, Boiler, Combustion Turbine, Condensing Turbine, Extracting Turbine, Fuel Cell, Microturbine, Other, Reciprocating Engine, Heat Recovery Generator, Stirling Engine |
| Eligible Fuel | # 2 Fuel Oil, # 6 Fuel Oil, Biogas, Biomass, Coal, Hydrogen, LFG, Municipal Solid Waste, Natural Gas, Other, Tire-Derived Fuel, Waste heat Recovery |
| Eligible Project Size | All (MW) |
| Number of Awards | |
| Size of Award | PGE has no standard standby rate. Customers seeking standby service need to contract with the utility to be charged under a regular tariff. Typical rates have moderate demand and energy charges. Demand charges are based on the maximum demand of the month. |
| Start Date | 7/7/2008 |
| End Date |
|
| Minimum Efficiency(%) |
|
| Additional Information |
|
| Web Site |
http://www.portlandgeneral.com/default.aspx ![]() |
| Primary Contact |
Customer Service 121 SW Salmon Street Portland, OR 97204 U.S.A. (800) 542-8818 |
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)
