| AR Net Metering Standards | |
|---|---|
| Type of Incentive | Net Metering |
| Eligible States | AR |
| Eligible Technology | Backpressure Turbine, Boiler, Combustion Turbine, Condensing Turbine, Extracting Turbine, Fuel Cell, Microturbine, Other, Reciprocating Engine, Heat Recovery Generator, Stirling Engine |
| Eligible Fuel | Biogas, Biomass, Hydrogen, LFG, Natural Gas, Other |
| Eligible Project Size | 0.025 - 0.3 |
| Critical Information | Eligible Technologies: Solar Thermal Electric, Photovoltaics, Wind, Biomass, Hydroelectric, Geothermal Electric, Fuel Cells, Microturbines using renewable fuels. Size Limitations: Up to 25 kw for residential use, and 300 kW for non-residential use. Overall Enrollment Restrictions: None Net Excess: Granted to the utility at the end of every month. |
| Start Date | 7/26/2002 |
| End Date |
|
| Minimum Efficiency (%) |
|
| Additional Information | Net metering regulations were enacted by the Arkansas Public Service Commission (PSC) on July 26, 2002. These rules state that any excess net generation will be granted back to the utility each month. Subsequent legislation enacted in April 2007 (HB 2334) bolstered the existing statute by increasing the availability of net metering, improving the law's provision for the carryover of net excess generation (NEG), and clarifying the ownership of "renewable-energy credits" (RECs). Nevertheless, the PSC is going to review this condition since it discourages net metering. |
| Web Site | http://170.94.29.3/rules/net_metering_rules.pdf![]() |
| Additional Web Site | http://www.dsireusa.org/library/includes/ incentive2.cfm?Incentive_Code=AR03R&state=AR&CurrentPageID=1&RE=1&EE=1 ![]() |
| Primary Contact | Jenny Ahlen One Capitol Mall Suite 4B/215 Little Rock, AR 72201 U.S.A. Jenny Ahlen (jahlen@arkansasedc.com) (501) 682-2460 |