Jump to main content.


Funding Resources

Funding Resources
PEPCO Standby Rate
Type of Incentive Utility Rates
Eligible States DC
Eligible Utility Potomac Electric Power Company
Eligible Technology Backpressure Turbine, Boiler, Combustion Turbine, Condensing Turbine, Extracting Turbine, Fuel Cell, Microturbine, Other, Reciprocating Engine, Heat Recovery Generator, Stirling Engine
Eligible Fuel # 2 Fuel Oil, # 6 Fuel Oil, Biogas, Biomass, Coal, Hydrogen, LFG, Municipal Solid Waste, Natural Gas, Other, Tire-Derived Fuel, Waste heat Recovery
Eligible Project Size All (MW)
Critical Information Schedule S - A minor reservation fee is charged per kilowatt to secure standby capacity while actual energy service is charged under the appropriate rate schedule for the facility size. Billing demand is based on the maximum 30 minute demand of the month with no ratchet.
Start Date 7/7/2008
End Date

 

Minimum Efficiency (%)

 

Additional Information

 

Web Site http://www.pepco.com/home/choice/dc/tariffs/Exit EPA
Primary Contact Customer Service
701 Ninth Street, N.W.
Washington, DC 20068
U.S.A.
Customer Service (correspondence@pepco.com)
(202) 833-7500

Top of Page


Local Navigation


Jump to main content.