Funding Resources
Funding Resources
| PEPCO Standby Rate | |
|---|---|
| Type of Incentive | Utility Rates |
| Eligible States | DC |
| Eligible Utility | Potomac Electric Power Company |
| Eligible Technology | Backpressure Turbine, Boiler, Combustion Turbine, Condensing Turbine, Extracting Turbine, Fuel Cell, Microturbine, Other, Reciprocating Engine, Heat Recovery Generator, Stirling Engine |
| Eligible Fuel | # 2 Fuel Oil, # 6 Fuel Oil, Biogas, Biomass, Coal, Hydrogen, LFG, Municipal Solid Waste, Natural Gas, Other, Tire-Derived Fuel, Waste heat Recovery |
| Eligible Project Size | All (MW) |
| Critical Information | Schedule S - A minor reservation fee is charged per kilowatt to secure standby capacity while actual energy service is charged under the appropriate rate schedule for the facility size. Billing demand is based on the maximum 30 minute demand of the month with no ratchet. |
| Start Date | 7/7/2008 |
| End Date |
|
| Minimum Efficiency (%) |
|
| Additional Information |
|
| Web Site |
http://www.pepco.com/home/choice/dc/tariffs/![]() |
| Primary Contact |
Customer Service 701 Ninth Street, N.W. Washington, DC 20068 U.S.A. Customer Service (correspondence@pepco.com) (202) 833-7500 |
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)
