Coal Combustion Residuals Impoundment Assessment Reports
Related Links
- Coal Combustion Residuals
- Information Request Responses from Electric Utilities
- Impoundment Assessment Reports
- Surface Impoundments with High Hazard Potential Ratings
- Frequent Questions
- Proposed Rule
Additional Information
As part of the US Environmental Protection Agencys ongoing national effort to assess the management of coal combustion residuals (CCR), EPA is releasing the final contractor reports assessing the structural integrity of impoundments and similar management units containing coal combustion residuals, commonly referred to as coal ash, at coal fired power plants. Most of the impoundments have been given hazard potential ratings (e.g. less than low, low, significant, high) by the state, EPA contractor, or company which are not related to the stability of the impoundments but to the potential for harm should the impoundment fail. For example, a significant hazard potential rating means impoundment failure can cause economic loss, environmental damage, or damage to infrastructure.
EPA has assessed all of the known units with a dam hazard potential rating of high or significant as reported in the responses provided by electric utilities to EPAs information requests and additional units identified during the field assessments. EPA will release additional reports as they become available.
The reports being released now have been completed by contractors who are experts in the area of dam integrity, reflect the best professional judgment of the engineering firm, and are signed and stamped by a professional engineer. The reports are based on a visual assessment of the site, interviews with site personnel, and the review of geotechnical reports and studies related to the design, construction and operation of those impoundments, if available. The engineering firms also reviewed past state/federal inspections of the impoundments. EPA contractors were not authorized to conduct any physical drilling, coring or sampling while on site; however, they did review studies which may have included such information. These reports include complex engineering evaluations and use terms which may be unfamiliar to the general public. Also, the contractors were asked to rate the impoundments as satisfactory, fair, poor, or unsatisfactory, terms commonly used in the field of dam safety. Expert experience has shown that only impoundments rated as unsatisfactory pose immediate safety threats. None of the impoundments assessed so far have received an unsatisfactory rating. Impoundment ratings noted in the reports should be taken in the proper context, since a unit may be found to be structurally sound while it may receive a fair or poor rating based on other factors such as lack of information.
Draft copies of these reports have been reviewed by the facilities and the states for factual accuracy and their comments on the draft reports have also been posted. EPA continues to review the reports and the technical recommendations, and is working with the facilities to ensure that the recommendations are implemented.
EPA has provided a copy of the final report to each facility and has requested that the facility implement the recommendations in the reports and provide plans for taking action. These plans are being posted below as they become available. Should facilities fail to take sufficient measures, EPA will take additional action, if the circumstances warrant, and will be devoting special attention to those facilities receiving a poor rating.
Ratings summary for the assessments:
| First Round |
Second Round |
Third Round |
Fourth Round |
Fifth Round |
Sixth Round |
Seventh Round |
Eighth Round |
|
|---|---|---|---|---|---|---|---|---|
| Satisfactory | 22 | 31 | 15 | 23 | 15 | 3 | 33 | 9 |
| Fair | 15 | 9 | 12 | 17 | 14 | 27 | 10 | 16 |
| Poor | 6 | 0 | 10 | 30 | 9 | 14 | 13 | 21 |
| Unsatisfactory | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Total number of units | 43 | 40 | 37 | 70 | 38 | 44 | 56 | 46 |
The companies in the table below have at some point claimed some information they have provided to the EPA related to their coal ash impoundments is confidential business information (CBI). While EPA reviews these claims, the information that is claimed as CBI is redacted (removed) from the coal ash reports. If these claims are accepted by the EPA, the information will remain redacted. If EPA denies these claims, the information will be made publicly available and posted to this website.
The public should be aware that Southern Company subsidiaries (Georgia Power and Alabama Power) have informed the Agency that major portions of their draft and final EPA assessment reports contain CBI information; as a result, the Agency will review and make a determination on these CBI claims after requesting further substantiation. The Agency will release redacted (edited) versions of these reports.
| Company that Claims CBI | EPAs Determination on CBI Claim |
|---|---|
| Alabama Power Company Barry Power Station Gorgas Power Station Greene County Power Station Ernest C. Gaston Power Station |
In Process In Process In Process In Process |
| Ameren UE Coffeen Power Station Duck Creek Power Station E.D. Edwards Power Station Labadie Power Station Meramec Power Station Meredosia Power Station Newton Power Station Sioux Power Staion |
In Process In Process In Process In Process In Process In Process In Process In Process |
| Duke Energy Corporation | Denied |
| Eastern Kentucky Power Cooperative, Inc. Dale Power Station |
In process |
| First Energy Generation Corporation Little Blue Run Dam |
Denied |
| Georgia Power Company Bowen Power Station Plant Branch or Harlee Branch Power Station Plant Hammond Plant Mitchell Plant Yates Plant McDonough Plant Scherer Wansley Power Station |
In Process In Process In Process In Process In Process In Process In Process In Process |
| Gulf Power Company Lansing Smith Power Station |
In Process |
| Mississippi Power Company Plant Jack Watson |
In Process |
| Northern Indiana Public Service Company R.M. Schahfer Power Station |
In Process |
You will need Adobe Reader to view some of the files on this page. See EPAs PDF page to learn more.
Reports
Summary Table for Impoundment Reports (XLS) October 12, 2011 (2.2MB, Download the free Microsoft Excel Viewer) | PDF Version (6 pp, 61K, about PDF)
A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z
Reports Key
- Cover Letter: Letter from EPA to facility requesting that the facility develop an Action Plan to address the recommendations from the Final Report.
- Draft Report: Initial report from EPAs contractor.
- Comments: This document compiles comments from EPA, state, and company on the Draft Report.
- Final Report: Incorporates comments, as appropriate, from the EPA, state, and company as well as any information/data the company provided to EPA between when the report was initially drafted and finalized.
- Company Response/Action Plan: the responses from the facility to EPAs Cover Letter.
A
Alabama Power Company William Crawford Gorgas Electric Generating Plant
- Cover Letter (PDF) (3 pp, 874K)
- Comments (PDF) (10 pp, 130K)
- Draft Report (PDF) (67 pp, 4MB)
- Final Report (PDF) (69 pp, 5MB)
- Company Response/Action Plan (PDF) (2 pp, 46K)
Alabama Power Company Barry Plant
- Cover Letter (PDF) (3 pp, 111K)
- Comments (PDF) (1 pg, 130K)
- Company Response/Action Plan (PDF) (2 pp, 247K)
Alabama Power Company EC Gaston Facility
- Cover Letter (PDF) (3 pp, 103K)
- Comments (PDF) (1 pg, 130K)
- Company Response/Action Plan (PDF) (2 pp, 309K)
Alabama Power Company Greene Facility
- Cover Letter (PDF) (3 pp, 69K)
- Comments (PDF) (1 pg, 130K)
- Company Response/Action Plan (PDF) (2 pp, 290K)
Allegheny Energy Pleasants Power Station
- Cover Letter (PDF) (4 pp, 25K)
- Comments (PDF) (16 pp, 3MB)
- Draft Report (PDF) (83 pp, 6MB)
- Final Report (PDF) (83 pp, 6MB)
- Company Response/Action Plan (PDF) ( 6 pp, 2408K)
Allegheny Energy R Paul Smith Station
- Cover Letter (PDF) (4 pp, 23K)
- Comments (PDF) (25 pp, 2MB)
- Draft Report (PDF) (91 pp, 13MB)
- Final Report (PDF) (91 pp, 7MB)
- Company Response/Action Plan (PDF) (5 pp, 2MB)
Allete Boswell Energy Center
- Cover Letter (PDF) (3 pp, 69K)
- Comments (PDF) (1 pg, 71K)
- Draft Report (PDF) (134 pp, 28.4MB)
- Final Report (PDF) (134 pp, 52.7MB)
- Company Response/Action Plan (PDF) (42 pp, 10.3M)
Allete Laskin Energy Center
- Cover Letter (PDF) (3 pp, 36K)
- Comments (PDF) (6 pp, 1.2MB)
- Draft Report (PDF) (101 pp, 18.9MB)
- Final Report (PDF) (110 pp, 18.7MB)
Alliant Energy Burlington Generating Station
Alliant Energy Columbia Power Station
- Cover Letter (PDF) (4 pp, 37K)
- Comments (PDF) (7 pp, 385K)
- Draft Report (PDF) (149 pp, 26.4MB)
- Final Report (PDF) (164 pp, 26.9MB)
Alliant Energy M.L. Kapp Power Station
- Cover Letter (PDF) (6 pp, 48K)
- Comments (PDF) (11 pp, 658K)
- Draft Report (PDF) (91 pp, 9.5MB)
- Final Report (PDF) (95 pp, 9.8MB)
- Supplemental Information to Final Report, Hydraulic and Hydrology Analysis (PDF) (45 pp, 1.2MB)
Alliant Energy Ottumwa Generating Station
- Cover Letter (PDF) (3 pp, 38K)
- Comments (PDF) (8 pp, 424K)
- Draft Report (PDF) (245 pp, 7.1MB)
- Final Report (PDF) (242 pp, 6.7MB)
Ameren Coffeen Facility
- Cover Letter (PDF) (4 pp, 39K)
- Comments (PDF) (1 pg, 30K)
Ameren Duck Creek Facility
- Cover Letter (PDF) (4 pp, 162K)
- Comments (PDF) (1 pg, 30K)
Ameren ED Edwards Facility
- Cover Letter (PDF) (3 pp, 34K)
- Comments (PDF) (1 pg, 30K)
Ameren Electric Energy, Inc. Joppa Plant
- Cover Letter (PDF) (3 pp, 181K)
- Comments (PDF) (5 pp, 761K)
- Draft Report (PDF) (85 pp, 4.4MB)
- Final Report (PDF) (47 pp, 2.5MB)
- Company Response/Action Plan (PDF) (42 pp, 10.3M)
Ameren Labadie Power Station
- Cover Letter (PDF) (3 pp, 36K)
- Comments (PDF) (1 pg, 30K)
Ameren Meramec Power Station
- Cover Letter (PDF) (3 pp, 36K)
- Comments (PDF) (1 pg, 30K)
Ameren Meredosia Facility
- Cover Letter (PDF) (4 pp, 164K)
- Comments (PDF) (1 pg, 30K)
Ameren Newton Facility
- Cover Letter (PDF) (4 pp, 38K)
- Comments (PDF) (1 pg, 30K)
Ameren Rush Island Power Station
- Cover Letter (PDF) (3 pp, 35K)
- Comments (PDF) (1 pg, 30K)
Ameren Sioux Power Station
- Cover Letter (PDF) (3 pp, 35K)
- Comments (PDF) (1 pg, 132K)
American Electric Power Big Sandy Power Plant
- Cover Letter (PDF) (4 pp, 23K)
- Comments (PDF) (10 pp, 67K)
- Draft Report (PDF) (125 pp, 11MB)
- Final Report (PDF) (125 pp, 10MB)
- Company Response/Action Plan (PDF) (4 pp, 60K)
American Electric Power Cardinal Power Plant
- Cover Letter (PDF) (4 pp, 25K)
- Comments (PDF) (6 pp, 54K)
- Draft Report (PDF) (149 pp, 56MB)
- Final Report (PDF) (149 pp, 55MB)
- Company Response/Action Plan (PDF) (6 pp, 52K)
American Electric Power Conesville Generating Station
- Cover Letter (PDF) (5 pp, 26K)
- Comments (PDF) (11 pp, 255K)
- Draft Report (PDF) (85 pp, 6MB)
- Final Report (PDF) (86 pp, 6MB)
- Company Response/Action Plan (PDF) (6 pp, 210K)
American Electric Power General James Gavin Power Plant
- Cover Letter (PDF) (4 pp, 1.5MB)
- Comments (PDF) (19 pp, 195K)
- Draft Report (PDF) (109 pp, 18MB)
- Final Report (PDF) (111 pp, 19MB)
- Company Response/Action Plan (PDF) (8 pp, 266K)
American Electric Power John E Amos Power Plant
- Cover Letter (PDF) (4 pp, 31K)
- Comments (PDF) (2 pp, 22K)
- Draft Report Bottom Ash (PDF) (43 pp, 3MB)
- Final Report Bottom Ash (PDF) (37 pp, 22MB)
- Draft Report Fly Ash (PDF) (35 pp, 2MB)
- Final Report Fly Ash (PDF) (45 pp, 3MB)
- Company Response/Action Plan (PDF) (978 pp, 65MB)
American Electric Power Mitchell Power Plant
- Cover Letter (PDF) (3 pp, 20K)
- Comments (PDF) (2 pp, 22K)
- Draft Report (PDF) (160 pp, 35MB)
- Final Report (PDF) (159 pp, 27MB)
- Company Response/Action Plan (PDF) (2 pp, 30K)
American Electric Power Mountaineer Power Plant
- Cover Letter (PDF) (3 pp, 21K)
- Comments (PDF) (2 pp, 19K)
- Draft Report (PDF) (39 pp, 7MB)
- Final Report (PDF) (39 pp, 4MB)
- Company Response/Action Plan (PDF) (3 pp, 36K)
American Electric Power Muskingum Power Plant
- Cover Letter (PDF) (6 pp, 30K)
- Comments (PDF) (18 pp, 485K)
- Draft Report (PDF) (182 pp, 10MB)
- Final Report (PDF) (181 pp, 12MB)
- Company Response/Action Plan (PDF) (8 pp, 79K)
American Electric Power Philip Sporn Generating Plant
- Additional Information Regarding AEPs Philip Sporn Power Plant in New Haven, West Virginia
- Cover Letter (PDF) (1 pg, 16K)
- Comments (PDF) (7 pp, 91K)
- Draft Report (PDF) (88 pp, 8M)
- Final Report (PDF) (97 pp, 7M)
- AEP Response to Recommendations (PDF) (173 pp, 10M)
- AEP Supplemental Information (PDF) (10 pp, 760K)
- Evaluation of AEP Response (PDF) (6 pp, 75K)
- Information Request Letter (PDF) (10 pp, 456K)
- Information Request Letter Modification (PDF) (1 pg, 39K)
American Electric Power Rockport Power Plant
- Cover Letter (PDF) (3 pp, 32K)
- Comments (PDF) (1 pg, 9K)
- Draft Report (PDF) (32 pp, 3.7MB)
- Final Report (PDF) (31 pp, 3.7MB)
American Electric Power Southwestern Electric Power Co Pirkey Power Station
- Cover Letter (PDF) (6 pp, 49K)
- Comments (PDF) (8 pp, 295K)
- Draft Report (PDF) (124 pp, 16.4MB)
- Final Report (PDF) (131 pp, 9.5MB)
American Electric Power Tanner Creek Facility
- Cover Letter (PDF) (3 pp, 914K)
- Comments - Bottom Ash and Fly Ash (PDF) (3 pp, 28K)
- Draft Report Bottom Ash (PDF) (40 pp, 27MB)
- Final Report Bottom Ash (PDF) (40 pp, 6MB)
- Draft Report Fly Ash (PDF) (54 pp, 31MB)
- Final Report Fly Ash (PDF) (44 pp, 7MB)
- Company Response/Action Plan (PDF) (2 pp, 290K)
American Electric Power Welsh Plant
- Cover Letter (PDF) (4 pp, 56K)
- Comments (PDF) (8 pp, 203K)
- Draft Report (PDF) (581 pp, 25MB)
- Final Report (PDF) (579 pp, 25MB)
- Company Response/Action Plan (PDF) (2 pp, 26K)
Arizona Electric Power Coop Inc. Apache Power Station
- Comments (PDF) (22 pp, 4.5MB)
- Draft Report (PDF) (157 pp, 24MB)
- Final Report (PDF) (159 pp, 24MB)'
- Supplemental Information (PDF) (14 pp, 4MB)
- Company Response/Action Plan (PDF) (6 pp, 852K)
Arizona Public Service Co. Cholla Power Station
- Cover Letter (PDF) (4 pp, 23K)
- Comments (PDF) (7 pp, 468K)
- Draft Report (PDF) (167 pp, 29MB)
- Final Report (PDF) (150pp, 28MB)
- Company Response/Action Plan (PDF) (5 pp, 3.5MB)
Arizona Public Service Co. Four Corners Power Station
- Cover Letter (PDF) (3 pp, 948K)
- Comments (PDF) (13 pp, 754K)
- Draft Report (PDF) (43 pp, 434K)
- Final Report (PDF) (125 pp, 13MB)
- Company Response/Action Plan (PDF) (4 pp, 119K)
Associated Electric Cooperative New Madrid Power Plant
- Cover Letter (PDF) (4 pp, 38K)
- Comments (PDF) (3 pp, 515K)
- Draft Report (PDF) (138 pp, 36.8MB)
- Final Report (PDF) (154 pp, 36.6MB)
Associated Electric Cooperative Thomas Hill Energy Center
- Cover Letter (PDF) (3 pp, 39K)
- Comments (PDF) (3 pp, 415K)
- Draft Report (PDF) (63 pp, 5.4MB)
- Final Report (PDF) (64 pp, 5.7MB)
Top of Page | Top of Report Results
B
Basin Electric Power Cooperative Antelope Valley Station
- Cover Letter (PDF) (4 pp, 43K)
- Comments (PDF) (12 pp, 950K)
- Draft Report (PDF) (72 pp, 10.5MB)
- Final Report (PDF) (72 pp, 9.1MB)
Basin Electric Power Cooperative Leland Olds Power Station
- Cover Letter (PDF) (4 pp, 43K)
- Comments (PDF) (10 pp, 1.8MB)
- Draft Report (PDF) (74 pp, 13.3MB)
- Final Report (PDF) (73 pp, 13.5MB)
Big Rivers Coleman Generating Station
- Cover Letter (PDF) (4 pp, 24K)
- Comments (PDF) (9 pp, 264K)
- Draft Report (PDF) (77 pp, 6MB)
- Final Report (PDF) (77 pp, 6MB)
- Company Response/Action Plan (PDF) (2 pp, 1032K)
Big Rivers Reid/Green/HMPL
- Cover Letter (PDF) (4 pp, 24K)
- Comments (PDF) (7 pp, 110K)
- Draft Report (PDF) (55 pp, 5MB)
- Final Report (PDF) (55 pp, 5MB)
- Company Response/Action Plan (PDF) (4 pp, 119K)
Top of Page | Top of Report Results
C
City of Independence (MO) Blue Valley Power Station
- Cover Letter (PDF) (3 pp, 45K)
- Comments (PDF) (3 pp, 246K)
- Draft Report (PDF) (71 pp, 6.8MB)
- Final Report (PDF) (71 pp, 7.3MB)
City of Sikeston (MO) Sikeston Power
- Cover Letter (PDF) (6 pp, 183K)
- Comments (PDF) (2 pp, 52K)
- Draft Report (PDF) (85 pp, 7.6MB)
- Final Report (PDF) (86 pp, 6.5MB)
- Company Response/Action Plan (PDF) (2 pp, 57K)
City of Springfield (IL) Dallman Power Station
- Cover Letter (PDF) (4 pp, 163K)
- Comments (PDF) (4 pp, 371K)
- Draft Report (PDF) (76 pp, 18.1MB)
- Final Report (PDF) (77 pp, 19.6MB)
Cleco Power LLC Brame Energy Center (formerly Rodemacher Power Station)
- Cover Letter (PDF) (6 pp, 804K)
- Comments (PDF) (5 pp, 166K)
- Draft Report (PDF) (100 pp, 46MB)
- Final Report (PDF) (109 pp, 47MB)
- Company Response/Action Plan (PDF) (6 pp, 269K)
Cleco Power LLC Dolet Hills Power Station
- Cover Letter (PDF) (4 pp, 39K)
- Comments (PDF) (3 pp, 419K)
- Draft Report (PDF) (132 pp, 16.3MB)
- Final Report (PDF) (135 pp, 16.4MB)
Coleto Creek Power
- Cover Letter (PDF) (6 pp, 70K)
- Comments (PDF) (4 pp, 986K)
- Draft Report (PDF) (119 pp, 7MB)
- Final Report (PDF) (124 pp, 5.2MB)
- Company Response/Action Plan (PDF) (3 pp, 477K)
Consumers Energy D.E. Karn Plant
- Cover Letter (PDF) (3 pp, 35K)
- Comments (PDF) (7 pp, 402K)
- Draft Report (PDF) (93 pp, 14.6MB)
- Final Report (PDF) (107 pp, 14.6MB)
Consumers Energy J.C. Weadock Plant
- Cover Letter (PDF) (3 pp, 32K)
- Comments (PDF) (10 pp, 818K)
- Draft Report (PDF) (238 pp, 20.9MB)
- Final Report (PDF) (497 pp, 35MB)
Consumers Energy J.R. Whiting Plant
- Cover Letter (PDF) (4 pp, 45K)
- Comments (PDF) (10 pp, 731K)
- Draft Report (PDF) (89 pp, 4.1MB)
- Final Report (PDF) (90 pp, 5MB)
Top of Page | Top of Report Results
D
Dayton Power and Light JM Stuart
- Cover Letter (PDF) (2 pp, 17K)
- Comments (PDF) (24 pp, 354K)
- Draft Report (PDF) (139 pp, 10MB)
- Final Report (PDF) (168 pp, 8MB)
- Company Response/Action Plan (PDF) (7 pp, 84K)
Dayton Power and Light OH Hutchings
- Cover Letter (PDF) (4 pp, 39K)
- Comments (PDF) (4 pp, 142K)
- Draft Report (PDF) (95 pp, 12.8MB)
- Final Report (PDF) (95 pp, 12.8MB)
Detroit Edison Company Monroe Power Plant
- Cover Letter (PDF) (3 pp, 42K)
- Comments (PDF) (5 pp, 670K)
- Draft Report (PDF) (98 pp, 20.9MB)
- Final Report (PDF) (120 pp, 20.8MB)
Dominion Bremo Power Station
- Cover Letter (PDF) (4 pp, 195K)
- Comments (PDF) (19 pp, 720K)
- Draft Report (PDF) (71 pp, 13.5MB)
- Final Report (PDF) (72 pp, 14.2MB)
- Company Response/Action Plan (PDF) (9 pp, 310K)
Dominion Chesapeake Energy Center
- Cover Letter (PDF) (3 pp, 192K)
- Comments (PDF) (19 pp, 721K)
- Draft Report (PDF) (38 pp, 3.71MB)
- Final Report (PDF) (38 pp, 1.82MB)
- Company Response/Action Plan (PDF) (9 pp, 310K)
Dominion Chesterfield Power Station
- Cover Letter (PDF) (3 pp, 173K)
- Comments (PDF) (19 pp, 728K)
- Draft Report (PDF) (53 pp, 2.8MB)
- Final Report (PDF) (55 pp, 3.1MB)
- Company Response/Action Plan (PDF) (9 pp, 310K)
Dominion Kincaid Generation
- Cover Letter (PDF) (4 pp, 181K)
- Comments (PDF) (3 pp, 683K)
- Draft Report (PDF) (41 pp, 3.2MB)
- Final Report (PDF) (42 pp, 6.7MB)
Dominion Possum Point Power Station
- Cover Letter (PDF) (3 pp, 207K)
- Comments (PDF) (19 pp, 720K)
- Draft Report (PDF) (53 pp, 7.2MB)
- Final Report (PDF) (55 pp, 7.8MB)
- Company Response/Action Plan (PDF) (9 pp, 310K)
Duke Energy Carolinas Allen Steam Station
- Cover Letter (PDF) (3 pp, 856K)
- Comments (PDF) (5 pp, 93K)
- Draft Report (PDF) (68 pp, 16MB)
- Final Report (PDF) (71 pp, 22MB)
- Company Response/Action Plan (PDF) (35 pp, 157K)
Duke Energy Carolinas Belews Creek Steam Station
- Cover Letter (PDF) (4pp, 24K)
- Comments (PDF) (6 pp, 283K)
- Draft Report (PDF) (70 pp, 6MB)
- Final Report (PDF) (70 pp, 7MB)
- Company Response/Action Plan (PDF) (5 pp, 1.4MB)
Duke Energy Carolinas Buck Steam Station
- Cover Letter (PDF) (7pp, 2MB)
- Comments (PDF) (12 pp, 171K)
- Draft Report (PDF) (156 pp, 36MB)
- Final Report (PDF) (158 pp, 36MB)
- Company Response/Action Plan (PDF) (7 pp, 82K)
Duke Energy Carolinas Dan River Steam Station
- Cover Letter (PDF) (4 pp, 1MB)
- Comments (PDF) (4 pp, 27K)
- Draft Report (PDF) (111 pp, 20MB)
- Final Report (PDF) (133pp, 22MB)
- Company Response/Action Plan (PDF) (4 pp, 663K)
Duke Energy Carolinas Lee Steam Station
- Cover Letter (PDF) (4 pp, 56K)
- Comments (PDF) (4 pp, 498K)
- Draft Report (PDF) (88 pp, 14MB)
- Final Report (PDF) (88 pp, 7MB)
- Company Response/Action Plan (PDF) (4 pp, 1.1MB)
Duke Energy Carolinas Marshall Steam Station
- Cover Letter (PDF) (4 pp, 976K)
- Comments (PDF) (6 pp, 160K)
- Draft Report (PDF) (67 pp, 27MB)
- Final Report (PDF) (68 pp, 29MB)
- Company Response/Action Plan (PDF) (4 pp, 170K)
Duke Energy Carolinas Riverbend Power Station
- Cover Letter (PDF) (4 pp, 1MB)
- Comments (PDF) (13 pp, 60K)
- Draft Report (PDF) (91 pp, 10MB)
- Final Report Annotation Memo (1 pg, 7K)
- Final Report (PDF) (92 pp, 5MB)
- Company Response/Action Plan (PDF) (5 pp, 125K)
Duke Energy Corporation East Bend Station
- Cover Letter (PDF) (3 pp, 34K)
- Comments (PDF) (6 pp, 915K)
- Draft Report (PDF) (174 pp, 10.9MB)
- Final Report (PDF) (163 pp, 10.4MB)
Duke Energy Corporation Edwardsport Plant
- Cover Letter (PDF) (3 pp, 33K)
- Comments (PDF) (3 pp, 105K)
- Draft Report (PDF) (39 pp, 3.4MB)
- Final Report (PDF) (38 pp, 3.3MB)
Duke Energy Corporation Gallagher Generating Station
- Cover Letter (PDF) (4 pp, 1.2MB)
- Comments (PDF) (4 pp, 121K)
- Draft Report (PDF) (50 pp, 7.4MB)
- Final Report (PDF) (48 pp, 2.9MB)
Duke Energy Corporation Miami Fort Generating Station
- Cover Letter (PDF) (4 pp, 24K)
- Comments (PDF) (8 pp, 288K)
- Draft Report (PDF) (91 pp, 6MB)
- Final Report (PDF) (91 pp, 6MB)
- Company Response/Action Plan (PDF) (5 pp, 238K)
Duke Energy Corporation Wabash River Generating Station
- Cover Letter (PDF) (4 pp, 194K)
- Comments (PDF) (33 pp, 1.74MB)
- Draft Report (PDF) (61 pp, 9MB)
- Final Report (PDF) (59 pp, 8.97MB)
- Company Response/Action Plan (PDF) (5 pp, 130K)
Duke Energy Corporation W.C. Beckjord Generating Station
- Cover Letter (PDF) (4 pp, 24K)
- Comments (PDF) (14 pp, 400K)
- Draft Report (PDF) (170 pp, 9MB)
- Final Report (PDF) (200 pp, 12MB)
- Company Response/Action Plan (PDF) (5 pp, 174K)
Duke Energy Corporation W.H. Zimmer Station
- Cover Letter (PDF) (3 pp, 188K)
- Comments (PDF) (3 pp, 74K)
- Draft Report (PDF) (44 pp, 10.6MB)
- Final Report (PDF) (45 pp, 10.6MB)
- Company Response/Action Plan (PDF) (4 pp, 129K)
Duke Energy Indiana Cayuga Generating Station
- Cover Letter (PDF) (4 pp, 39K)
- Comments (PDF) (6 pp, 830K)
- Draft Report (PDF) (109 pp, 6.8MB)
- Final Report (PDF) (110 pp, 6.7MB)
Duke Energy Indiana Gibson Generating Station
- Cover Letter (PDF) (4 pp, 65K)
- Comments (PDF) (6 pp, 247K)
- Draft Report (PDF) (117 pp, 20.2MB)
- Final Report (PDF) (118 pp, 8.97MB)
- Company Response/Action Plan (PDF) (5 pp, 130K)
Dynegy Midwest Generation, Inc. Havana Power Station
- Cover Letter (PDF) (2 pp, 436K)
- Comments (PDF) (15 pp, 2MB)
- Draft Report (PDF) (26 pp, 2MB)
- Final Report (PDF) (32 pp, 4MB)
- Final Report Appendices (PDF) (414 pp, 38MB)
- Company Response/Action Plan (PDF) (2 pp, 27K)
Dynegy Midwest Generation, Inc. Vermilion Power Station
- Cover Letter (PDF) (3 pp, 33K)
- Comments (PDF) (15 pp, 3.7MB)
- Draft Report (PDF) (81 pp, 8.4MB)
- Final Report (PDF) (68 pp, 6.3MB)
Dynegy Midwest Generation, Inc. Wood River Power Station
- Cover Letter (PDF) (2 pp, 433K)
- Comments (PDF) (27 pp, 804K)
- Draft Report (PDF) (25 pp, 464K)
- Final Report (PDF) (31 pp, 617K)
- Final Report Appendices (PDF) (666 pp, 66MB)
- Company Response/Action Plan (PDF) (1 pg, 7K)
Top of Page | Top of Report Results
E
Eastern Kentucky Power Cooperative Dale Power Station
- Cover Letter (PDF) (7 pp, 60K)
- Comments (PDF) (1 pg, 31K)
Empire District Electric Company Asbury Power Station
- Cover Letter (PDF) (4 pp, 43K)
- Comments (PDF) (3 pp, 180K)
- Draft Report (PDF) (86 pp, 4.9MB)
- Final Report (PDF) (82 pp, 4.3MB)
Empire District Electric Company Riverton Generating Station
- Cover Letter (PDF) (4 pp, 43K)
- Comments (PDF) (3 pp, 116K)
- Draft Report (PDF) (55 pp, 2.6MB)
- Final Report (PDF) (55 pp, 2.8MB)
E.ON Kentucky Utilities E.W. Brown Plant
- Cover Letter (PDF) (4 pp, 20K)
- Comments (PDF) (23 pp, 328K)
- Ash Draft Report (PDF) (37 pp, 2MB)
- Ash Final Report (PDF) (386 pp, 50MB)
- Auxillary Draft Report (PDF) (32 pp, 3MB)
- Auxillary Final Report (PDF) (360 pp, 58MB)
- Company Response/Action Plan (PDF) (2 pp, 379K)
E.ON Kentucky Utilities Ghent Generating Station
- Cover Letter (PDF) (4 pp, 24K)
- Comments (PDF) (9 pp, 261K)
- Draft Report (PDF) (141 pp, 19MB)
- Final Report (PDF) (141 pp, 19MB)
- Company Response/Action Plan (PDF) (2 pp, 289K)
E.ON Louisville Gas & Electric Co. Mill Creek Station
- Cover Letter (PDF) (4 pp, 23K)
- Comments (PDF) (6 pp, 104K)
- Draft Report (PDF) (44 pp, 4MB)
- Final Report (PDF) (44 pp, 4MB)
- Company Response/Action Plan (PDF) (2 pp, 600K)
E.ON Louisville Gas & Electric Co. Cane Run Station
- Cover Letter (PDF) (4 pp, 23K)
- Comments (PDF) (229 pp, 29MB)
- Draft Report (PDF) (82 pp, 5MB)
- Final Report (PDF) (84 pp, 5MB)
- Company Response/Action Plan (PDF) (3 pp, 821K)
Top of Page | Top of Report Results
F
First Energy Generation Corporation Bruce Mansfield Power Plant<
- Cover Letter (PDF) (3 pp, 20K)
- Comments (PDF) (1 pg, 14K)
- Draft Report (PDF) (78 pp, 8MB)
- Final Report (PDF) (79 pp, 5MB)
- Supplemental Checklists (PDF) (28 pp, 265K)
- Supplemental Inspections (PDF) (101 pp, 16MB)
- Company Response/Action Plan (PDF) (3 pp, 31K)
First Energy Generation Corporation - Bruce Mansfield Power Plant Little Blue Run Dam
- Cover Letter (PDF) (4 pp, 25K)
- Comments (PDF) (194 pp, 27K)
- Draft Report (PDF) (90 pp, 17MB)
- Final Report (PDF) (93 pp, 7MB)
- Company Response/Action Plan (PDF) (9 pp, 285K)
Top of Page | Top of Report Results
G
Georgia Power Plant Bowen
- Cover Letter (PDF) (3 pp, 834K)
- Comments (PDF) (21 pp, 688K)
- Draft Report (PDF) (93 pp, 21MB)
- Final Report (PDF) (59 pp, 3MB)
- Company Response/Action Plan (PDF) (3 pp, 139K)
Georgia Power Plant Branch
- Cover Letter (PDF) (5 pp, 27K)
- Redacted Final Report (PDF) (188 pp, 3MB)
- Company Response/Action Plan (PDF) (13 pp, 1983K)
Georgia Power Plant Hammond
- Comments (PDF) (1 pg, 131K)
- Company Response/Action Plan (PDF) (3 pp, 121K)
Georgia Power Plant McDonough
- Comments (PDF) (1 pg, 131K)
- Company Response/Action Plan (PDF) (3 pp, 122K)
Georgia Power Plant Mitchell
- Comments (PDF) (1 pg, 133K)
- Company Response/Action Plan (PDF) (6 pp, 241K)
Georgia Power Plant Scherer
- Comments (PDF) (1 pg, 133K)
- Company Response/Action Plan (PDF) (4 pp, 125K)
Georgia Power Plant Wansley
- Cover Letter (PDF) (3 pp, 53K)
- Comments (PDF) (1 pg, 130K)
- Company Response/Action Plan (PDF) (3 pp, 67K)
Georgia Power Plant Yates
- Comments (PDF) (1 pg, 133K)
- Company Response/Action Plan (PDF) (10 pp, 394K)
Gulf Power Company Lansing Smith Power Station
- Cover Letter (PDF) (10 pp, 394K)
- Comments (PDF) (1 pg, 133K)
- Company Response/Action Plan (PDF) (4 pp, 498K)
Top of Page | Top of Report Results
H
Hoosier Energy Frank E. Ratts Generating Station
- Cover Letter (PDF) (4 pp, 37K)
- Comments (PDF) (24 pp, 3.4MB)
- Draft Report (PDF) (110 pp, 14.6MB)
- Final Report (PDF) (112 pp, 14.6MB)
Top of Page | Top of Report Results
I
Indiana-Kentucky Electric Corp. Clifty Creek Power Station
- Cover Letter (PDF) (5 pp, 2MB)
- Comments Bottom Ash Pond (PDF) (9 pp, 138K)
- Comments Fly Ash Pond (PDF) (10 pp, 138K)
- Draft Report Bottom Ash Pond (PDF) (60 pp, 8MB)
- Final Report Bottom Ash Pond (PDF) (62 pp, 9MB)
- Draft Report Fly Ash Pond (PDF) (65 pp, 8MB)
- Final Report Fly Ash Pond (PDF) (66 pp, 9MB)
- Company Response/Action Plan (PDF) (5 pp, 80K)
Indianapolis Power & Light Eagle Valley Generating Station
- Cover Letter (PDF) (4 pp, 69K)
- Comments (PDF) (24 pp, 4.1MB)
- Draft Report (PDF) (160 pp, 21.7MB)
- Final Report (PDF) (158 pp, 19.2MB)
- Company Response/Action Plan (PDF) (10 pp, 644K)
Indianapolis Power & Light Harding Street Generating Station
- Cover Letter (PDF) (4 pp, 95K)
- Comments (PDF) (33 pp, 6.1MB)
- Draft Report (PDF) (211 pp, 25.3MB)
- Final Report (PDF) (210 pp, 23.7MB)
- Company Response/Action Plan (PDF) (8 pp, 645K)
Indianapolis Power & Light Petersburg Generating Station
- Cover Letter (PDF) (4 pp, 68K)
- Comments (PDF) (8 pp, 1.8MB)
- Draft Report (PDF) (148 pp, 15.5MB)
- Final Report (PDF) (149 pp, 15.6MB)
- Company Response/Action Plan (PDF) (8 pp, 674K)
Intermountain Power Project Intermountain Generating Station
- Cover Letter (PDF) (3 pp, 40K)
- Comments (PDF) (10 pp, 494K)
- Draft Report (PDF) (99 pp, 5.9MB)
- Final Report (PDF) (100 pp, 5.6MB)
Top of Page | Top of Report Results
J no entries
Top of Page | Top of Report Results
K
Kansas City Board of Public Utilities Nearman Creek Power Station
- Cover Letter (PDF) (3 pp, 98K)
- Comments (PDF) (37 pp, 2.9MB)
- Draft Report (PDF) (280 pp, 8.9MB)
- Final Report (PDF) (259 pp, 7MB)
Kansas City Power & Light La Cygne Generating Station
- Cover Letter (PDF) (3 pp, 58K)
- Comments (PDF) (3 pp, 136K)
- Draft Report (PDF) (287 pp, 37.3MB)
- Final Report (PDF) (402 pp, 41.1MB)
Kansas City Power & Light Sibley Generating Station
- Cover Letter (PDF) (3 pp, 38K)
- Comments (PDF) (4 pp, 1.3MB)
- Draft Report (PDF) (183 pp, 9MB)
- Final Report (PDF) (195 pp, 7.7MB)
Kentucky Utilities Green River Station
- Cover Letter (PDF) (13 pp, 116K)
- Comments (PDF) (356 pp, 48.3MB)
- Draft Report (PDF) (143 pp, 19.8MB)
- Final Report (PDF) (164 pp, 19.8MB)
Kentucky Utilities Pineville Generating Station
- Cover Letter (PDF) (5 pp, 64K)
- Comments (PDF) (139 pp, 11.6MB)
- Draft Report (PDF) (57 pp, 7.9MB)
- Final Report (PDF) (61 pp, 8.4MB)
Kentucky Utilities Tyrone Generating Station
- Cover Letter (PDF) (5 pp, 64K)
- Comments (PDF) (211 pp, 11.9MB)
- Draft Report (PDF) (73 pp, 7.1MB)
- Final Report (PDF) (82 pp, 7.2MB)
Top of Page | Top of Report Results
L
Louisiana Generating Big Cajun
- Cover Letter (PDF) (4 pp, 248K)
- Comments (PDF) (5 pp, 112K)
- Draft Report (PDF) (963 pp, 40MB)
- Final Report (PDF) (832 pp, 43MB)
- Letter Granting EPA Permission to Release the Company Action Plan (PDF) (1 pg, 348K)
- Company Response/Action Plan (PDF) (4 pp, 245K)
Louisville Gas and Electric Power Trimble County Generating Station
- Cover Letter (PDF) (4 pp, 1MB)
- Comments (PDF) (19 pp, 100K)
- Draft Report (PDF) (63 pp, 40MB)
- Final Report (PDF) (63 pp, 9MB)
- Company Response/Action Plan (PDF) (2 pp, 521K)
Lower Colorado River Authority Fayette Power Project
- Cover Letter(PDF) (5 pp, 64K)
- Comments (PDF) (133 pp, 13MB)
- Draft Report (PDF) (117 pp, 11MB)
- Final Report (PDF) (117 pp, 8MB)
- Company Response/Action Plan (PDF) (5 pp, 342K)
Top of Page | Top of Report Results
M
Mid American Energy Company George Neal North Energy Center
- Cover Letter (PDF) (4 pp, 66K)
- Comments (PDF) (260 pp, 30.5MB)
- Draft Report (PDF) (280 pp, 37MB)
- Final Report (PDF) (303 pp, 55.8MB)
Mid American Energy Company Louisa Generating Station
- Cover Letter (PDF) (3 pp, 59K)
- Comments (PDF) (259 pp, 30.5MB)
- Draft Report (PDF) (193 pp, 11.3MB)
- Final Report (PDF) (161 pp, 9.3MB)
Mid American Energy Company Riverside Generating Station
- Cover Letter (PDF) (3 pp, 60K)
- Comments (PDF) (21 pp, 3.5MB)
- Draft Report (PDF) (247 pp, 31.8MB)
- Final Report (PDF) (402 pp, 20MB)
- Supplemental Information to Final Report, Interim Geotechnical Findings (PDF) (3 pp, 332K)
- Supplemental Information to Final Report, Final Geotechnical Findings (PDF) (13 pp, 415K)
Mid American Energy Company Walter Scott Junior Energy Center
- Cover Letter (PDF) (4 pp, 68K)
- Comments (PDF) (17 pp, 3.2MB)
- Draft Report (PDF) (348 pp, 37.2MB)
- Final Report (PDF) (381 pp, 29.3MB)
Minnkota Power Cooperative Milton R. Young Power Station
- Cover Letter (PDF) (4 pp, 44K)
- Comments (PDF) (106 pp, 6MB)
- Draft Report (PDF) (87 pp, 4.2MB)
- Final Report (PDF) (90 pp, 8.4MB)
Mississippi Power Plant Jack Watson
- Cover Letter (PDF) (3 pp, 67K)
- Comments (PDF) (1 pg, 130K)
- Company Response/Action Plan (PDF) (2 pp, 406K)
Top of Page | Top of Report Results
N
Northern States Sherburne County Power Station
- Cover Letter (PDF) (4 pp, 23K)
- Comments (PDF) (10 pp, 839K)
- Draft Report (PDF) (151 pp, 16MB)
- Final Report (PDF) (149 pp, 9MB)
- Company Response/Action Plan (PDF) (7 pp, 2MB)
Northern Indiana Public Service Company R.M. Schahfer Power Plant
- Cover Letter (PDF) (5 pp, 78K)
- Comments (PDF) (67 pp, 2.5MB)
- Draft Report (PDF) (240 pp, 31MB)
- Final Report (PDF) (238 pp, 27.1MB)
- Company Response/Action Plan (PDF) (5 pp, 219K)
Top of Page | Top of Report Results
O
Ohio Valley Electric Kyger Creek Power Station
- Cover Letter (PDF) (3 pp, 21K)
- Comments (PDF) (8 pp, 248K)
- Draft Report (PDF) (93 pp, 12MB)
- Final Report (PDF) (93 pp, 19MB)
- Company Response/Action Plan (PDF) (3 pp, 796K)
Top of Page | Top of Report Results
P
PacifiCorp Energy Dave Johnston Power Station
- Cover Letter (PDF) (4 pp, 42K)
- Comments (PDF) (5 pp, 680K)
- Draft Report (PDF) (124 pp, 5.7MB)
- Final Report (PDF) (154 pp, 6.7MB)
PacifiCorp Energy Jim Bridger Power Station
- Cover Letter (PDF) (4 pp, 1MB)
- Comments (PDF) (9 pp, 418K)
- Draft Report (PDF) (42 pp, 400K)
- Final Report (PDF) (121 pp, 18MB)
- Company Response/Action Plan (PDF) (5 pp, 68K)
PacifiCorp Energy Naughton Power Station
- Cover Letter (PDF) (4 pp, 23K)
- Comments (PDF) (9 pp, 116K)
- Draft Report (PDF) (152 pp, 31MB)
- Final Report (PDF) (152 pp, 31MB)
- Company Response/Action Plan (PDF) (3 pp, 1MB)
PacifiCorp Energy Wyodak Power Station
- Cover Letter (PDF) (3 pp, 40K)
- Comments (PDF) (4 pp, 1.1MB)
- Draft Report (PDF) (73 pp, 7.7MB)
- Final Report (PDF) (73 pp, 8.7MB)
PowerSouth Energy Cooperative Lowman Power Station
- Cover Letter (PDF) (6 pp, 110K)
- Comments (PDF) (113 pp, 17MB)
- Draft Report (PDF) (200 pp, 80MB)
- Final Report (PDF) (201 pp, 51MB)
- Company Response/Action Plan (PDF) (5 pp, 1.1MB)
PPL Generation, LLC Martins Creek Electric Station
- Cover Letter (PDF) (5 pp, 25K)
- Comments (PDF) (4 pp, 25K)
- Draft Report (PDF) (109 pp, 14MB)
- Final Report (PDF) (109 pp, 28MB)
- Supplemental Information (PDF) (941 pp, 70MB)
- Company Response/Action Plan (PDF) (3 pp, 17K)
PPL Montana, LLC - Colstrip Power Plant
- Cover Letter (PDF) (5 pp, 2MB)
- Comments (PDF) (21 pp, 4MB)
- Draft Report (PDF) (57 pp, 502K)
- Final Report (PDF) (171 pp, 14MB)
- Company Response/Action Plan (PDF) (35 pp, 157K)
Progress Energy Carolinas Asheville Power Station
- Cover Letter (PDF) (4 pp, 1MB)
- Comments (PDF) (1 pg, 11K)
- Draft Report (PDF) (30 pp, 380K)
- Draft Report Appendices (142 pp, 47MB)
- Final Report (PDF) (36 pp, 565K)
- Final Report Appendices (142 pp, 47MB)
- Company Response/Action Plan (PDF) (4 pp, 104K)
Progress Energy Carolinas Cape Fear Power Station
- Cover Letter (PDF) (5 pp, 2MB)
- Comments (PDF) (16 pp, 1MB)
- Draft Report (PDF) (150 pp, 32MB)
- Final Report (PDF) (152 pp, 33MB)
- Company Response/Action Plan (PDF) (8 pp, 390K)
Progress Energy Carolinas Mayo Power Station
- Cover Letter (PDF) (3 pp, 736K)
- Comments (PDF) (2 pp, 911K)
- Draft Report (PDF) (23 pp, 138K)
- Draft Report Appendices (PDF) (121 pp, 18MB)
- Final Report (PDF) (29 pp, 312K)
- Final Report Appendices (PDF) (127 pp, 18MB)
- Company Response/Action Plan (PDF) (3 pp, 74K)
Progress Energy Carolinas Roxboro Power Station
- Cover Letter (PDF) (3 pp, 21K)
- Comments (PDF) (17 pp, 2MB)
- Draft Report (PDF) (89 pp, 8MB)
- Final Report (PDF) (88 pp, 7MB)
- Supplemental Information (PDF) (29 pp, 316K)
- Company Response/Action Plan (PDF) (2 pp, 119K)
Top of Page | Top of Report Results
Q no entries
Top of Page | Top of Report Results
R no entries
Top of Page | Top of Report Results
S
Salt River Project Coronado Power Station
- Cover Letter (PDF) (4 pp, 25K)
- Comments (PDF) (5 pp, 166K)
- Draft Report (PDF) (100 pp, 46MB)
- Final Report (PDF) (109 pp, 47MB)
- Company Response/Action Plan (PDF) (6 pp, 804K)
Santee Cooper Grainger Generating Station
- Cover Letter (PDF) (3 pp, 53K)
- Comments (PDF) (5 pp, 970K)
- Draft Report (PDF) (89 pp, 12MB)
- Final Report (PDF) (87 pp, 7MB)
- Company Response/Action Plan (PDF) (2 pp, 349K)
Santee Cooper Jefferies Generating Station
- Cover Letter (PDF) (4 pp, 57K)
- Comments (PDF) (7 pp, 2MB)
- Draft Report (PDF) (125 pp, 19MB)
- Final Report (PDF) (127 pp, 18MB)
- Company Response/Action Plan (PDF) (4 pp, 569K)
Santee Cooper Winyah Generating Station
- Cover Letter (PDF) (5 pp, 61K)
- Comments (PDF) (12 pp, 4MB)
- Draft Report (PDF) (355 pp, 51MB)
- Final Report (PDF) (409 pp, 66MB)
- Company Response/Action Plan (PDF) (5 pp, 885K)
South Carolina Electric and Gas Wateree Generating Station
- Cover Letter (PDF) (4 pp, 55K)
- Comments (PDF) (3 pp, 105K)
- Draft Report (PDF) (315 pp, 50MB)
- Final Report (PDF) (304 pp, 48MB)
- Company Response/Action Plan (PDF) (3 pp, 385K)
Sunbury Generation LP
- Cover Letter (PDF) (3 pp, 192K)
- Comments (PDF) (4 pp, 133K)
- Draft Report (PDF) (35 pp, 2.3MB)
- Final Report (PDF) (35 pp, 2.5MB)
- Company Response/Action Plan (PDF) (3 pp, 679K)
Top of Page | Top of Report Results
T
Tri-State Generation and Transmission Association Inc. Escalante Power Station
- Cover Letter (PDF) (2 pp, 494K)
- Comments (PDF) (52 pp, 14MB)
- Draft Report (PDF) (52 pp, 14MB)
- Final Report (PDF) (53 pp, 14MB)
- Company Response/Action Plan (PDF) (1 pg, 7K)
Top of Page | Top of Report Results
U no entries
Top of Page | Top of Report Results
V
Vectren AB Brown Power Station
- Cover Letter (PDF) (4 pp, 1.3MB)
- Comments (PDF) (5pp, 606K)
- Draft Report (PDF) (37 pp, 7.8MB)
- Final Report (PDF) (38 pp, 13MB)
- Draft Report Upper Ash (PDF) (35 pp, 16MB)
- Final Report Upper Ash (PDF) (36 pp, 6MB)
- Company Response/Action Plan (PDF) (3 pp, 541K)
Vectren FB Culley Power Generating Station
- Cover Letter (PDF) (4 pp, 40K)
- Comments (PDF) (4 pp, 40K)
- Draft Report (PDF) (72 pp, 6.4MB)
- Final Report (PDF) (72 pp, 6.2MB)
Top of Page | Top of Report Results
W
Westar Energy Jeffrey Energy Center
- Cover Letter (PDF) (5 pp, 1MB)
- Comments (PDF) (49 pp, 992K)
- State Comments (PDF) (2pp, 82K)
- Draft Report (PDF) (47 pp, 452K)
- Final Report (PDF) (116 pp, 10MB)
- Company Response/Action Plan (PDF) (2 pp, 489K)
Westar Energy Lawrence Energy Center
- Cover Letter (PDF) (3 pp, 60K)
- Comments (PDF) (4 pp, 130K)
- Draft Report (PDF) (181 pp, 42.3MB)
- Final Report (PDF) (168 pp, 21.3MB)
Westar Energy Tecumseh Energy Center
- Cover Letter (PDF) (4 pp, 60K)
- Comments (PDF) (4 pp, 893K)
- Draft Report (PDF) (82 pp, 13.5MB)
- Final Report (PDF) (81 pp, 12.8MB)
Western Farmers Electric Cooperative Hugo Power Station
- Cover Letter (PDF) (4 pp, 50K)
- Comments (PDF) (4 pp, 431K)
- Draft Report (PDF) (91 pp, 4.8MB)
- Final Report (PDF) (91 pp, 5.1MB)
Top of Page | Top of Report Results
X
Xcel Energy Black Dog Power Station
- Cover Letter (PDF) (3 pp, 61K)
- Comments (PDF) (4 pp, 2.1MB)
- Draft Report (PDF) (167 pp, 21/1MB)
- Final Report (PDF) (104 pp, 15.3MB)
Top of Page | Top of Report Results
Y no entries
Top of Page | Top of Report Results
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)