#1 - ASHTABULA RIVER REMEDIATION PROJECT
(FY1996 - IAG - DW96947775-01-0)
U.S. Army Corps of Engineers
Contact: Brian Troyer, Project Manager
U.S. Army Corps of Engineers, CENB-PP-PM
Buffalo District
1776 Niagara Street
Buffalo, NY 14207-3199
Tel: (716) 879-4316
Fax: (716) 879-4355
Technical Contact: Steve Golyski, Technical Manager
U.S. Army Corps of Engineers, CENCB-PE-PT
Buffalo District
1776 Niagara Street
Buffalo, NY 14207-3199
Tel: (716) 879-4228
Fax: (716) 879-4355
Award Amount: FY1996 - $500,000 ($250,000 each from GLNPO
and Region 5 Water Division)
Dollars Leveraged: $500,000 through Ashtabula River
Partnership
Project Timetable: October 1, 1996 - September 30, 1999
GLNPO Project Officer:
Callie Bolattino (312)
353-3490
Project Location: Ashtabula, Ohio
Partners: Ashtabula River Partnership, Ohio EPA
Narrative: The Ashtabula River and Fields Brook have been
contaminated with PCBs, PAHs, VOCs and heavy metals. The Ashtabula
River Partnership (ARP), comprised of private citizens and groups,
government officials, and business and industry leaders, was formed
to explore the effective remediation of the contaminated sediments
in the Ashtabula River and Harbor. The goal of the ARP is to look
beyond traditional approaches in order to determine a comprehensive
solution for remediation of the contaminated sediments not suitable
for open lake disposal.
This project will involve the development of a detailed design
for an upland disposal facility for dredged contaminated sediments
classified as TSCA and non-TSCA in conformance with the
Comprehensive Management Plan and Environmental Impact Statement in
order to obtain the Ashtabula River Partnership goal for complete
sediment remediation.
Status: ongoing
Environmental Results/Products: Successful remediation of
the Ashtabula River and Harbor will ultimately enhance ecological
restoration and economic development opportunities in Ashtabula
County.
#2 - CLINTON RIVER, MICHIGAN SEDIMENT
ASSESSMENT
(FY1994 - IAG - DW96947710-01-0)
U.S. Army Corps of Engineers
Contact: Jim Galloway
U.S. Army Corps of Engineers
ATTN: CENCE-EP-E
P.O. Box 1027
Detroit, MI 48231
Tel: (313) 226-6760
Fax: (313) 226-7095
Award Amount: FY1994 - $159, 304 (IAG total $221, 000 for
Clinton River and Muskegon/White Lakes (projects #16/#33) combined)
Project Timetable: September 1, 1994 - September 30, 1995
GLNPO Project Officer:
Marc Tuchman (312) 353-1369
Project Location: Clinton River watershed, Oakland and Macomb
Counties, southeast Michigan
Partners: Michigan Department of Environmental Quality
Narrative: The Clinton River drainage encompasses 1968 km2
in southeast Michigan, primarily in Oakland and Macomb Counties.
Contaminated sediments in the Clinton River have contributed to its
designation as both a Great Lakes Area of Concern and a Michigan Act
307 site. Sedimentation has been documented as a serious problem
throughout the watershed as a result of both agriculture and
urban/suburban development, but little is known about contaminants
associated with these sediments.
The project has two objectives:
- to determine which contaminants present a problem; and,
- to identify areas of contamination.
This study will be used to determine potential "hot spots", and
will provide data to prioritize these zones and aid in designing
benthic community and further sediment characterization studies over
the next three to five years.
Status: closed out
Data Results: The lower river, from Mt. Clemens to the
river mouth at Lake St. Clair, was the most contaminated area of the
study. The highest observed concentrations of several heavy metals,
including Cr (340 mg/kg), Ni (162 mg/kg), and Zn (761 mg/kg), and an
elevated concentration of Pb (233 mg/kg), occurred in this area. PCB
concentrations were also highest in this area, with recorded levels
of 8.52 mg/kg and 3.4 mg/kg. Three sites in the area had PAH
concentrations above 195 mg/kg, the highest level being almost 280
mg/kg. Concentrations throughout the upper watershed were generally
not elevated, although Big Beaver Creek had an elevated PAH
concentration (248 mg/kg) and a site in Pontiac had the highest
observed Pb concentration, 320 mg/kg.
Environmental Results/Products: This study provided
information being used in a fiscal year 1995 study (project #3)
designed to better delineate contaminant areas and determine any
sites which require immediate or future remediation.
#3 - CLINTON RIVER, MICHIGAN SEDIMENT
SUPPORT
(FY1995 - IAG - DW96947740-01-0)
U.S. Army Corps of Engineers
Contact: Jim Galloway
U.S. Army Corps of Engineers
ATTN: CENCE-EP-E
P.O. Box 1027
Detroit, MI 48231
Tel: (313) 226-6760
Fax: (313) 226-7095
Award Amount: FY1995 - $150,000 (IAG total $225,000, for
Clinton River and Trenton Channel (project #27) combined)
Project Timetable: July 31, 1995 - December 31, 1996
GLNPO Project Officer:
Callie Bolattino
312-353-3490
Project Location: Clinton River, Michigan
Partners: Michigan Department of Environmental Quality,
Clinton River PAC
Narrative: Contaminated sediments in the Clinton River
have contributed to its designation as both a Great Lakes Area of
Concern and a Michigan Act 307 site. A FY 1994 IAG (project #2)
served as a preliminary assessment of sediments throughout the
Clinton River watershed.
The goal of this FY 1995 IAG is to conduct comprehensive
assessments of sediments within specific areas of the river in order
to further define locations of extensive contamination.
There are three main objectives:
- to better define the areas of contamination in the 4 zones
previously determined to be notably contaminated (Zone 1, Pontiac;
Zone 2, Mainstem Clinton River from Rochester to confluence Red
Run Drain; Zone 3, Red Run Drain; and Zone 4, Lower River);
- to determine on a site specific basis if contamination is
attributable to historic or ongoing sources and to identify
ongoing sources; and,
- to determine sites which require immediate or future
remediation.
Status: ongoing
Data Results: Several sites along the lower river, below
Mt. Clemens, had elevated heavy metal concentrations. The highest
concentrations, all in mg/kg, included the following: cadmium, 28;
chromium, 400; lead, 400; nickel, 190; and zinc, 940. The highest
PAH concentrations occurred in the upper river watershed, including
levels of 342 mg/kg at a site near Auburn Heights and a
concentration of 113 mg/kg near Moravian Road.
Environmental Results/Products: The project will provide
detailed site information which will enable the formulation of
remediation decisions.
#4 - COSTS AND BENEFITS OF CLEANING UP
GREAT LAKES SEDIMENT IN AREAS OF CONCERN
(FY1995 - GL985062-01-0)
University of Wisconsin
Contact: Phil Keillor
U.W. Sea Grant College Program
University of Wisconsin-Madison
1800 University Avenue
Madison, WI 53705-4094
Tel: (608) 263-5133
Fax: (608) 263-2063
Award Amount: FY1995 - $61,463
Dollars Leveraged: $296,000 ($232,000 from Great Lakes
Protection Fund and $64,000 from U.W. Sea Grant)
Project Timetable: May 1, 1995 - December 31, 1997
GLNPO Project Officer: Marc Tuchman 312-353-1369
Project Location: Great Lakes Basin
Partners: Great Lakes Protection Fund, University of
Wisconsin Sea Grant, University of Wisconsin Dept. of Civil and
Environmental Engineering
Narrative: In order to build upon USEPA-ARCS and
Environment Canada's demonstration program results, more information
and tools are needed to estimate the benefits and costs of cleaning
up contaminated sediments.
The goal of this project is the presentation of a decision
framework with tools and training that can be used by Remedial
Action Plan (RAP) developers for making sediment remediation choices
in Great Lakes Areas of Concern (AOCs).
Specific project objectives include:
- to develop an economic analysis approach to benefits and costs
of sediment remediation;
- to investigate significant cost factors and uncertainties in
selected remediation technologies;
- to investigate cost-saving, cooperative remediation
strategies; and,
- to develop supporting computer software.
Status: ongoing
Environmental Results/Products: A framework of
methodologies for estimating benefits and costs of remediation
options will be introduced to decision-makers and those who
influence decisions regarding sediment remediation.
#5 - SURVEY OF SEDIMENT QUALITY IN THE
DULUTH/SUPERIOR HARBOR (DULUTH PHASE I)
(FY1993 - GL995383-01-0)
Minnesota Pollution Control Agency
Contact: Judy Crane
Minnesota Pollution Control Agency
Water Quality Division
520 Lafayette Rd. N.
St. Paul, MN 55155-4194
Tel: (612) 297-4068
Fax: (612) 297-8683
Award Amount: FY1993 - $217,500
Project Timetable: October 1, 1993 - September 30, 1995
GLNPO Project Officer:
Callie Bolattino
312-353-3490
Project Location: St. Louis River Area of Concern,
Duluth/Superior Harbor (Duluth, MN/Superior, WI)
Partners: Wisconsin Department of Natural Resources, Sediment
Contamination Workgroup of the St. Louis River RAP
Narrative: The project was designed to fulfill the
critical need for a sediment survey of the St. Louis River estuary,
including the Duluth/Superior Harbor. Certain sediments within the
AOC were known to contain elevated concentrations of PCBs, PAHs, and
heavy metals. However, the distribution and historical record of
contaminants and potential toxicity of the contaminated sediments
was poorly understood. Most historic data were collected near
shipping channels to support dredging operations. In addition, most
data were outdated due to higher detection limits and less stringent
quality assurance/quality control.
The project goal was to define general areas within the
AOC where sediment contamination and toxicity appeared to be
elevated. The estuary contains several known or suspected areas of
high sediment contamination. The project, by simultaneously
analyzing areas known to be contaminated, as well as unknown sites,
was intended to provide a consistent framework for prioritizing
remedial sediment activities within the AOC. At each of 40 sites,
sediment cores were collected for chemical analyses, and sediment
toxicity tests were conducted on surficial Ponar samples.
Status: closed out
Data Results: The highest concentrations of PAHs, heavy
metals, and 2,3,7,8-TCDD were found in sediments near the USX
Superfund site. Elevated levels of PAHs and metals were also located
near the discharge from the Western Lake Superior Sanitary District
(WLSSD). The highest levels of PCBs occurred near the WLSSD
discharge; elevated levels were also found at USX and at two slips
in the outer harbor. Most contaminant concentrations followed an
approximately chi-square distribution (i.e., there were many samples
with low-end concentrations and relatively few samples with elevated
levels). This was especially true for lead and zinc. Seven sites
were toxic in the Microtox test, whereas 21 sites were mutagenic to
the bacterium, Photobacterium phosphorum. Three sites were acutely
toxic to the midge, Chironomus tentans, including the Unnamed Creek
outfall at USX.
Environmental Results/Products: This project was an
integral part of a continuing effort to assess sediment
contamination and toxicity in the St. Louis River AOC. Information
collected was essential in planning for Phase II (project #6) of the
study. This survey highlighted areas within the Duluth/Superior
Harbor that had elevated levels of sediment contamination and/or
toxicity (hot spots) and suggested contaminants and endpoints of
concern for each site. A final report, "Survey of Sediment Quality
in the Duluth/Superior Harbor: 1993 Sampling Results", will be made
available to the public in early 1997.
#6 - SEDIMENT ASSESSMENT OF HOTSPOT AREAS
IN THE DULUTH/SUPERIOR HARBOR (DULUTH PHASE II)
(FY1994 - GL995636-01-0)
Minnesota Pollution Control Agency
Contact: Judy Crane
Minnesota Pollution Control Agency
Water Quality Division
520 Lafayette Rd. N.
St. Paul, MN 55155-4194
Tel: (612) 297-4068
Fax: (612) 297-8683 FAX
Award Amount: FY1994 - $310,500 (St. Louis River sediment
portion of MPCA cluster grant)
Project Timetable: August 26, 1994 - September 30, 1997
GLNPO Project Officer:
Callie Bolattino
312-353-3490
Project Location: St. Louis River Area of Concern, Duluth/Superior
Harbor (Duluth, MN/Superior, WI)
Partners: Wisconsin Department of Natural Resources, Sediment
Contamination Workgroup of the St. Louis River RAP
Narrative: This study is Phase II of the St. Louis River
Sediment Assessment. The 40 sites surveyed during Phase I in 1993
(project #5) were evaluated according to the degree of contamination
and toxicity observed. Eight locales were selected as hotspots, and
Kimball's Bay was selected as a clean reference site. The USX and
Interlake/Duluth Tar Superfund sites, as well as Hog Island Inlet,
were excluded from the survey due to separate investigations at
these sites.
The goal is to perform a detailed sediment assessment at
sites identified as toxic and/or contaminated in the 1993 survey in
the Duluth/Superior Harbor and St. Louis River and, as a result of
the assessment, to develop a sediment management plan for these
sites. Contaminants of concern and their measurement were tailored
to each site.
The objectives are to:
- determine pollutant distribution within hotspots identified in
the 1993 survey;
- perform toxicity tests at each of the sites, at a frequency of
at least 50% of the sites where contaminants were measured;
- perform a benthic community assessment at each site; and,
integrate chemistry, toxicity, and benthic community assessment
data to
- determine a sediment management plan for impacted areas.
Status: ongoing
Data Results: The highest normalized PAH profile
concentrations were found at Minnesota Slip, followed by Slip C, and
the vicinity of the Western Lake Superior Sanitary District (WLSSD).
The highest mercury concentration (3.9 mg/kg) was observed at a
WLSSD site, and overall, the area surrounding WLSSD had the most
widespread mercury contamination. The highest levels of
simultaneously extractable metals (SEM), when normalized for Acid
Volatile Sulfides (AVS), were found at Howard's Bay; lead was
particularly high at this site.
Four samples from three different sites were acutely toxic to the
amphipod, Hyalella azteca. Two samples from different sites
were acutely toxic to the midge, Chironomus tentans. For 42%
of the samples tested, the C. tentans results were
inconclusive due to poor control survival.
The benthological community structure was dominated by tubificid
oligochaetes, chironomids, and the polychaete Manayunkia speciosa
(at selected sites). The highest mean abundance recorded for
oligochaetes was at Minnesota Slip. Mean values of total abundance
and taxa richness were low at Kimball's Bay, indicating that this
site was not a suitable control site. Mouthpart deformities in
chironomid larvae were recorded at six sites, four of whichwere in
the vicinity of WLSSD.
Integration of the sediment chemistry, toxicity data, and
benthological community structure data are pending.
Environmental Results/Products: This survey will provide
the detailed assessments required to make decisions about
contaminated sediment management. Results will be used to target
sites for sediment management activities, such as site remediation
or point/nonpoint source contaminant controls. A report, Sediment
Assessment of Hotspot Areas in the Duluth/Superior Harbor, will be
available to the public in 1997.
#7 - EASTERN LAKE ONTARIO DRAINAGE BASIN
SEDIMENT STUDY
(FY1995 - GL985137-01-0)
New York State Department of Environmental Conservation
Contact: Bruce Garabedian
New York State Department of Environmental Conservation
50 Wolf Road, Room 305
Albany, NY 12233-3502
Tel: (518) 457-0729
Fax: (518) 485-7786
Award Amount: FY1995 - $314,004
Project Timetable: September 25, 1995 - September 24, 1997
GLNPO Project Officer: Debbie Siebers
Project Location: Eastern Lake Ontario drainage basin,
including Black River
Narrative: Previous studies have indicated that the Black
River is the top contributor of PCBs to Lake Ontario. Elevated
levels of total PCB's and heavy metals, including mercury, cadmium,
and lead, have been reported in water column and sediment samples
from the Black River and its tributaries. However, comprehensive
sediment data for the study area is not currently available.
The goal of the study is to evaluate sediments in the
Eastern Lake Ontario drainage basin. Emphasis will be placed on
validation of suspect data included on the National Sediment
Inventory and the study of contaminated sediment deposits identified
as impacting water quality by the NYSDEC Priority Water Problem (PWP)
list.
Study objectives are:
- to provide information on levels of contamination and toxicity
of bottom sediments in the tributaries to the Eastern Lake Ontario
drainage basin; and,
- to conduct bioaccumulation studies on the sediments of the
Black River and Eastern Lake Ontario tributaries.
Status: ongoing
Data Results: Should be available in 1997 (sampling
started in late 1996; will be completed in late spring or early
summer, 1997)
Environmental Results/Products: The study will provide
information on levels of contamination and toxicity of bottom
sediments in selected Eastern Lake Ontario tributaries.
#8 - DESIGN OF A SEDIMENT TREATMENT PLANT
AT ERIE PIER CONFINED DISPOSAL
FACILITY (CDF) (FY1995 - GL985132-01-0)
University of Minnesota - Duluth
Contact: R.L. Bleifuss
Assistant Director - Minerals
University of Minnesota - Duluth Campus
Natural Resources Research Institute
P.O. Box 188
1 Gayley Avenue
Coleraine, MN 55722
Tel: (218) 245-4201
Fax: (218) 245-4219
Technical Contact: Chuying Wu
Research Fellow
University of Minnesota - Duluth Campus
Natural Resources Research Institute
P.O. Box 188
1 Gayley Avenue
Coleraine, MN 55722
Tel: (218) 245-4201
Fax: (218) 245-4219
Award Amount: FY1995 - $92,000
Project Timetable: October 1, 1995 - December 31, 1996
GLNPO Project Officer:
Callie Bolattino (312)
353-3490
Project Location: St. Louis River Area of Concern,
Duluth/Superior Harbor (Duluth, MN/Superior, WI)
Partners: U.S. Army Corps of Engineers, Detroit District
Narrative: The project will provide the necessary information for
the design of a facility to treat dredge material produced and
prolong the life of the Erie Pier Confined Disposal Facility (CDF).
The CDF is nearing its capacity and additional space is required for
storage of dredge materials either by construction of a new facility
or by extending the life of the one currently in use.
Project objectives include:
- conduct a sampling program to determine the size consist and
chemical composition of the sediment stored in the CDF, especially
the northeastern section which contains the finest-grained
material from the washing operation. The information will be used
to design and to make a more accurate cost estimate for the
treatment facility;
- investigate the possibility of creating a secure area within
the CDF for the storage of highly polluted dredge material which
may be removed from the harbor in the future; and,
- develop a cost estimate for the construction of a secured
lined compartment within the CDF for the storage of more highly
contaminated sediment which could be generated in the area from
Superfund sites, etc.
Status: Ongoing
Data Results: Incoming
Environmental Results/Products: Economic savings from
increased capacity of existing confined disposal facility.
#9 - SURVEY OF Hg IN SEDIMENT
CONTAMINATION - LOWER ST. LOUIS RIVER RESERVOIRS: FOND du LAC PHASE
I (FY1993 - GL995478-01-0)
Fond du Lac Tribe
Contacts: Larry Schwarzkopf, Principal Investigator
Fred Vande Venter, Aquatic Scientist
Fond du Lac Natural Resources Program
105 University Road
Cloquet, MN 55720
Tel: (218) 879-1759
Fax: (218) 879-4146
Award Amount: FY1993 - $70,000
Project Timetable: October 1, 1993 - September 30, 1995
GLNPO Project Officer:
Callie Bolattino (312)
353-3490
Project Location: St. Louis River system reservoirs, Duluth
region, Minnesota
Partners: University of Minnesota-Duluth, University of
Wisconsin-Superior
Narrative: The St. Louis River, the largest U.S. tributary
to Lake Superior, has been identified by the IJC as an Area of
Concern, in part due to the presence of toxic contaminants in fish
tissue and negative impacts on the benthic community. Mercury (Hg)
levels in walleye are elevated at various locations along the lower
St. Louis River, with the highest values occuring near and within
six small reservoirs. As a result of past industrial practices and
discharges, the sediments have accumulated contaminants, including
Hg, behind the reservoir dams. A preliminary survey of Hg
concentrations as a function of depth in cores from three reservoirs
showed a significant peak in Hg levels in some strata. Results of a
study on mercury in fish along the lower St. Louis River have
demonstrated the likelihood that sediments in the lower river
reservoirs may influence mercury residues in fish.
This project was a follow up to a preliminary sediment survey of
the lower St. Louis River reservoirs. The goal was to conduct
a more detailed study to assess sediment mercury contamination and
its importance in bioaccumulation, resuspension, and transport.
Investigations consisted of two components: 1) a mercury-in-sediment
cores survey; and 2) a mercury-in-benthos survey that included
measuring mercury in the corresponding surface sediments.
Status: closed out
Data Results: Thirty samples had mercury concentrations
above 1.3 ug/g (ppm). Two of the three highest concentrations were
from Scanlon Reservoir (2.5 and 3.4 ug/g). Elevated concentrations
were also observed in Knife Falls Reservoir (2.2 ug/g) and in 2
samples from Forbay Reservoir (1.9 ug/g). The most widespread
contamination appears to be in Thompson Reservoir, where 5 of the 10
highest concentrations, including 2.6 ug/g and 2.2 ug/g, were found.
Also, 21 of the 30 samples with concentrations above 1.3 ug/g were
from 14 cores taken from Thompson Reservoir.
Environmental Results/Products: The information on mercury
contamination in these reservoirs has been very useful in showing
the need for mitigating those areas where high levels of this
contaminant are at or near the surface. Current research to develop
practical mercury mitigation technology is using some of the
knowledge gained in this study. A project report, Assessment of
Mercury Contamination in the Sediments of Six Reservoirs on the
Lower St. Louis River, Minnesota, has been published and is
available.
#10 - MITIGATION OF SEDIMENT CONTAMINATION
IN RESERVOIRS ON THE LOWER ST. LOUIS RIVER : FOND du LAC PHASE II
(FY1995 - GL985025-01-0)
Fond du Lac Tribe
Contacts: Larry Schwarzkopf, Principal Investigator
Fred Vande Venter, Aquatic Scientist
Fond du Lac Natural Resources Program
105 University Road
Cloquet, MN 55720
Tel: (218) 879-1759
Fax: (218) 879-4146
Award Amount: FY1995 - $200,000
Project Timetable: October 1, 1995 - September 30, 1997
GLNPO Project Officer:
Callie Bolattino (312)
353-3490
Project Location: St. Louis River system reservoirs, Duluth
region, Minnesota
Partners: University of Minnesota-Duluth, University of
Wisconsin-Superior
Narrative: This project is Phase II of the study of mercury
sediment contamination in reservoirs along the lower St. Louis
River. Phase I (project #9) was a detailed sediment assessment of
the reservoirs.
The objectives of Phase II of the study include:
- to physically characterize sediment cores collected during
Phase I in terms of carbon content and particle size;
- measure mercury concentrations in three taxa of benthos to
determine biological uptake;
- measure water current velocity and direction to help assess
mercury transport;
- collect baseline physical, chemical, and biological data from
Fond du Lac Reservation lakes for a future mercury mitigation
study; and,
- field test specific methods and technologies targeted to the
uptake and bioaccumulation of mercury.
Status: Ongoing
Data Results: data collection began in the fall of 1996
and will continue in 1997
Environmental Results/Products: Information collected will
be used to determine the need and locations for sediment
remediation.
#11 - DESIGN AND ENGINEERING OF A REMEDIAL
OPTION IN THE FOX RIVER
(FY1995 - GL985130-01-0)
Wisconsin Department of Natural Resources
Contact: Bob Paulson
Wisconsin Department of Natural Resources WT/2
Bureau of Watershed Management
101 S. Webster Street
P.O. Box 7921
Madison, WI 53707-7921
Tel: (608) 266-7790
Fax: (608) 267-2800
Award Amount: FY1995 - $100,000
Dollars Leveraged: $150,000 from Fox River Coalition
(including WDNR)
Project Timetable: September 25, 1995 - September 24, 1997
GLNPO Project Officer:
Marc Tuchman (312) 353-1369
Project Location: Lower Fox River, Wisconsin
Partners: Fox River Coalition
Narrative: The Green Bay Mass Balance and Fox River PCB
Transport Studies, conducted between 1989 and 1992, indicated that
contaminated sediment in the Fox River is the major source of PCBs,
approximately 95% of the total load, to Green Bay. At least 85% of
the estimated total PCB mass in the river is located downstream of
De Pere and will serve as a major long term source of PCBs to Green
Bay and Lake Michigan. The Green Bay Mass Balance Study identified
34 contaminated sediment deposits in 32 miles of the Lower Fox River
upstream of De Pere.
Two deposits are the focus of remedial investigation and
feasibility studies currently underway. Upon completion of these
studies, a remediation site and remediation technique will be
selected that is consistent with an overall Lower Fox River cleanup
strategy. The two deposits under consideration are Deposit POG
located in Little Lake Butte des Morts and Deposit N located near
Kimberly, WI. Deposit POG is approximately 77 acres containing an
estimated 300,000 yd3 of sediment in excess of 50 ppb PCB, and an
estimated 720 Kgs of PCB and 81 Kgs of Hg. Deposit N is
approximately 3 acres containing an estimated 8,500 yd3 of sediment
in excess of 50 ppb PCB, and an estimated 120 Kgs of PCB and 6 Kgs
of Hg.
The project objective is to accomplish the final
pre-remedial activity including engineering design, plans and
specifications and development of bidding documents necessary to
remove, treat, and/or isolate a mass of PCB in the Lower Fox River.
Status: Ongoing
Environmental Results/Products: The project will result in
a document which the Fox River Coalition and Wisconsin Department of
Natural Resources can use to obtain bids for contracting a sediment
remediation project.
#12 - ASSESSMENT OF PCBs IN SEDIMENT IN
THE LOWER FOX RIVER
(FY1995 - GL985143-01-0)
Wisconsin Department of Natural Resources
Contact: Kim Walz
Wisconsin Department of Natural Resources - WT/2
Bureau of Water Resources Management
101 S. Webster Street
P.O. Box 7921
Madison, WI 53707-7921
Tel: (608) 264-9220
Fax: (608) 267-2800
Award Amount: FY1995 - $135,000
Project Timetable: September 1, 1995 - September 30, 1997
GLNPO Project Officer:
Marc Tuchman (312) 353-1369
Project Location: Lower Fox River, Wisconsin
Partners: Fox River Coalition
Narrative: The Green Bay Mass Balance and Fox River PCB
Transport Studies, conducted between 1989 and 1992, indicated that
contaminated sediment in the Fox River is the major source of PCBs,
approximately 95% of the total load, to Green Bay. At least 85% of
the estimated total PCB mass in the river is located downstream of
De Pere and will serve as a major long term source of PCBs to Green
Bay and Lake Michigan. Although the above studies provided some
information on the PCB distribution in the sediment, more accurate
estimates of contaminated sediment volume and PCB mass are required
to make sound remediation decisions.
This project has the following objectives:
- Further define and quantify PCB sediment distribution
downstream of De Pere Dam to Green Bay.
- Estimate the mass and volume of PCB contaminated sediments and
develop maps of PCB distribution in the Lower Fox River.
- Provide data to enable further refinement of PCB transport
models for the Lower Fox River.
- Provide further basis for making sound management decisions
throughout the Fox River to Green Bay.
- Support the Fox River Coalition's effort to prioritize and
remediate contaminated sediment hotspots in the Fox River.
- Implement a Green Bay Remedial Action Plan recommendation for
developing a clean up strategy for the Lower Fox River
contaminated sediments.
Status: Ongoing
Data Results: 25 samples had PCB concentrations at or
above 30 mg/kg. Two of the three highest concentrations (91 and 400
mg/kg) occurred in a core taken just upstream of the Fort Howard
Turning Basin, within three feet of the surface. Other hot spots
included dowstream of the Fort Howard Paper Co. intake gate (130
mg/kg), in the Leicht Transfer and Storage boat slip area (90
mg/kg), and sites approximately 0.3 miles upstream of the WI Central
RR bridge (57 mg/kg), and approximately 0.4 miles downstream of
Ashwaubenon Creek (63 mg/kg). While most contamination occurred in
core segments from depths greater than 3 feet, elevated
concentrations were observed in surficial samples (10-30 cm depth)
from sites just upstream of the Fort Howard Turning Basin (91
mg/kg), offshore of the Brown County Fairgrounds driveway loop (47
mg/kg), and about 0.25 miles downstream of the DePere Dam, near the
Voyager Park lock entrance (43 mg/kg). A concentration of 31 mg/kg
was found in both the 10-30 and 0-10 cm core segments from a site
approximately 0.5 miles upstream of the WI Central RR bridge.
Environmental Results/Products: The information generated
will assist in prioritizing sediment sites for remediation.
#13 - ASSESSMENT OF CONTAMINATED SEDIMENTS
IN LAKE MICHIGAN AOCs - HAYTON AREA REMEDIATION PROJECT/MANITOWOC
(FY1994 - GL995681-01-0)
Wisconsin Department of Natural Resources
Contact: Mark Velluex
Wisconsin Department of Natural Resources - WT/2
Bureau of Watershed Management
101 S. Webster Street
Madison, WI 53703
Tel: (608) 267-5262
Fax: (608) 267-2800
Award Amount: FY1994 - $126,000
Project Timetable: August 1, 1994 - September 30, 1996
GLNPO Project Officer: Debbie Siebers
Project Location: Hayton Area Remediation Project (HARP),
Calumet County, Wisconsin
Narrative: Past studies by the USEPA and WDNR identified
the presence of PCB contamination in fish, surface waters, and
sediments of the Hayton Millpond area in Calumet County, Wisconsin.
The project study area, referred to as the Hayton Area Remediation
Project (HARP), has been selected by the WDNR as a priority sediment
remediation demonstration site.
The project objectives were as follows:
- to determine the extent of contamination at the study area;
- to determine if PCBs are entering the study area from ongoing
external sources;
- to investigate historical sources of PCBs to the study area;
- to interview local residents and evaluate anecdotal evidence
of PCB discharges; and,
- to assemble sufficient information to identify potentially
responsible parties.
For the remedial investigation the project area, nearly eight
stream miles, was divided into four study units, that include one
soil area and three sediment units: 1) Upper Pine Creek, Jordan
Creek, and Drainage Ditches; 2)Lower Pine Creek and South Branch
Manitowoc River; and 3) Hayton Millpond.
Status: Completed; will not be closed out until other 2
projects (#15 and #25) under same grant are also completed.
Data Results: The highest sediment PCB concentrations
(804-2300 mg/kg) occurred in the Upper Pine Creek, Jordan Creek, and
Drainage Ditches study unit in an area known as the "old ditch".
These elevated concentrations indicate that this area is an active
source of PCBs to the Millpond. The distribution of contaminants
throughout the study area also suggest that contaminants may have
initially entered the system through the storm sewer drainage system
in the northeast section of the City of New Holstein.
Environmental Results/Products: The results of this
project delineate the areal and volumetric extent of sediment
contamination in the HARP study area. These results also provided
the basic information needed to evaluate human health risks
attributable to the contamination as well as information needed to
establish site remediation priorities. The Final Remediation
Investigation Report for the Hayton Area Remediation Project,
Volumes I-III, is available to the public.
#14 - MAUMEE RIVER AOC CONTAMINATED
SEDIMENT SURVEY
(FY1994 - GL995648-01-0)
Ohio Environmental Protection Agency
Contact: Tom Balduf
Ohio EPA
Northwest District Office
347 North Dunbridge Road
Bowling Green, OH 43402
Tel: (419) 373-3023
Fax: (419) 352-8468
Technical Contact: Brent Kuenzli
Ohio EPA
Northwest District Office
347 North Dunbridge Road
Bowling Green, OH 43402
Tel: (419) 373-3005
Fax: (419) 352-8468
Award Amount: FY1994 - $250,000
Project Timetable: October 1, 1994 - September 30, 1997
GLNPO Project Officer:
Callie Bolattino (312)
353-3490
Project Location: Maumee River, Ohio
Partners: Maumee RAP Group
Narrative: The Maumee River Area of Concern (MAOC)
includes that portion of the lower Maumee River which flows through
Lucas County to its confluence with, and including, Maumee Bay and
the nearshore waters of Lake Erie from the Ohio-Michigan state line
to Crane Creek State Park in Ohio. This study will address the
general extent of sediment contamination in depositional areas of
the lower reaches of Swan, Duck, and Otter Creeks and the Ottawa
River, as well as in the lower Maumee River and selected sites in
Maumee Bay.
While other studies have concentrated on surficial sediments from
the more upstream reaches of the tributaries of the Maumee River,
this study will focus on areas where the most concentrated and
widespread deposits of contaminants in the AOC are likely to occur.
The primary goal will be to add a significant amount of information
to the RAP database.
Objectives to be met include:
- helping the RAP community in evaluating levels of
contamination in the sampled waterways; assisting the RAP
community in preliminary prioritization of pre-remedial actions,
such as dredging of contaminated sediments;
- determining pollutant types and concentrations in the study
area to relate effects to known sources of contamination in
upstream areas of the AOC; and,
- providing screening data needed as evidence of historical
contamination patterns in the AOC.
Status: Ongoing
Data Results: The highest recorded concentrations, in
mg/kg, of several heavy metals were found in Swan Creek: chromium,
829; copper, 508; lead, 841; and zinc, 1150; the highest recorded
cadmium concentration (9.6 mg/kg), was found at sites in both Swan
Creek and the Maumee River. Elevated levels of heavy metals and PCBs
were found at several sites in the Maumee River, where the highest
nickel concentration (292 mg/kg) and the highest PCB concentration
(348 mg/kg) were found.
Environmental Results/Products: Analysis of the data from
this work should help to delineate contamination hot spots and allow
for a sediment quality triad evaluation approach. The project
activities, which represent a continuation and extension of the
effort already begun in the MAOC, will give a much more complete
picture of the nature, extent, and severity of sediment
contamination in the MAOC. Project data will be published in a
report due out in early 1997.
#15 - ASSESSMENT OF CONTAMINATED SEDIMENTS
IN LAKE MICHIGAN AOCs - MILWAUKEE ESTUARY SEDIMENT STRATEGY
IMPLEMENTATION
(FY1994 - GL995681-01-0)
Wisconsin Department of Natural Resources
Contact: Greg Hill
Water Resources Management
Wisconsin Department of Natural Resources
101 South Webster Street
Madison, WI 53702
Tel: (608) 267-9352
Fax: (608) 267-2800
Award Amount: FY1994 - $156,000
Project Timetable: August 1, 1994 - September 30, 1997
GLNPO Project Officer:
Marc Tuchman (312) 353-1369
Project Location: Milwaukee River system/estuary
Narrative: Nonpoint sources of toxics to the Milwaukee
Estuary are proving to be important. Plans for contaminated sediment
cleanup must be integrated with strategies to identify and reduce
nonpoint sources of toxic substances. This project is designed to
provide additional information on the impact of upstream and urban
nonpoint sources on sediment contamination and project the mass
balance movement of sediments and contaminants throught the
Milwaukee River system. If such sources can be minimized or
eliminated, then work can begin on remediating the contaminated
sediments themselves.
The project objectives are to:
- assess continued transport of PCB into Milwaukee Harbor from
the Milwaukee River;
- assess continued mass transport of RAP bioaccumulating
pollutants of concern in tributaries to the Kinnickinnic,
Menomonee and Milwaukee Rivers, Lincoln Creek and Crestwood Creek;
and,
- recommend and prioritize actions to eliminate continuing
sources and remediate contaminated sediments.
Status: Ongoing
Data Results: Incoming
Environmental Results/Products: The project will
ultimately lead to increased emphasis on stormwater control as well
as remediation of certain sediment deposits. Reports will be
produced on PCB transport in the Milwaukee River and bioaccumulative
substances in urban tributaries to the Milwaukee, Menomonee, and
Kinnickinnic Rivers. Sediment core data and semi-permeable membrane
device data will be incorporated into the Milwaukee sediment GIS
database.
#16 - MUSKEGON LAKE SEDIMENT ASSESSMENT
(FY1994 - IAG - DW96947710-01-0)
U.S. Army Corps of Engineers
Contact: Jim Galloway
U.S. Army Corps of Engineers
ATTN: CENCE-EP-E
P.O. Box 1027
Detroit, MI 48231
Tel: (313) 226-6760
Fax: (313) 226-7095
Award Amount: FY1994 - $61,696 (Muskegon Lake and White
Lake (project #33) combined; IAG total $221, 000 for Muskegon/White
Lakes and Clinton River (project #2) combined)
Project Timetable: September 1, 1994 - September 30, 1995
GLNPO Project Officer: Marc Tuchman 312-353-1369
Project Location: Muskegon Lake, Michigan
Partners: Michigan Department of Environmental Quality
Narrative: Muskegon Lake, located on the east shore of
Lake Michigan, has been designated as an AOC due to a number of
water quality problems including contaminated sediments and nutrient
enrichment. Previous studies have shown that historical municipal
and industrial discharges to the lake have resulted in elevated
concentrations of many heavy metals. In response to the need for
more current data and confirmation of a suspected sediment "hot
spot" in Muskegon Lake, a sediment sampling survey was conducted in
the vicinity of the Division Street stormsewer discharge.
Project objectives were as follows:
- collect sediment cores to determine contaminant concentration
and vertical profiles;
- characterize the areal extent of contaminants of concern;
- determine the necessary levels of remedial action and agency
involvement, and develop an implementation time table
Status: Closed out
Data Results: Elevated heavy metal concentrations were
found at many sites, especially near the Hartshorn Marina. This area
had the highest recorded concentrations (all in mg/kg) for Cd
(52.4), Cu (2660), Pb (741), and Zn (1690). The highest
concentrations of As, 86 mg/kg, and Cr, 258 mg/kg, were found north
of the stormsewer outfall; for Hg, 13.2 mg/kg, in front of the
stormsewer outfall; and Ni, 103 mg/kg, at a site west of the Marina.
It is worth noting that in front of the stormsewer outfall the Hg
concentration of 13.2 mg/kg exceeded the Effects Range Median (ER-M)
value by more than a factor of 10, and the Cd, Cu, Pb, and Zn
concentrations referred to above exceeded their respective ER-M
values by more than a factor of 5.
Environmental Results/Products: This study, by determining
the location and extent of contaminant hotspots, provided
information which can be used to plan and implement remediation
actions.
#17 - NEWTON CREEK SYSTEM SEDIMENT
CONTAMINATION SITE CHARACTERIZATION
(FY1993 - GL995443-01-0)
Wisconsin Department of Natural Resources
Contact: Kim Walz
Wisconsin Department of Natural Resources - WT/2
Bureau of Water Resources Management
101 S. Webster Street, P.O. Box 7921
Madison, WI 53707-7921
Tel: (608) 264-9220
Fax: (608) 267-2800
Award Amount: FY1993 - $218,300
Project Timetable: October 1, 1993 - September 30, 1995
GLNPO Project Officer:
Marc Tuchman (312) 353-1369
Project Location: Newton Creek system, Superior, Wisconsin
Narrative: The Newton Creek system has been identified as
one of five sites in the St. Louis River System Area of Concern that
is known to have particularly elevated concentrations of
contaminants in sediment. The Newton Creek system includes the
surface water environment encompassing Newton Creek Impoundment,
Newton Creek, Hog Island Inlet, Superior Bay at the inlet mouth, and
all floodplain, overflow areas, and wetlands associated with these
water bodies. The focus of this study was on the sediment and
floodplain soil of the Newton Creek system.
The primary objective of this study was to characterize the
contamination of sediments in the Newton Creek system to support the
evaluation of and, if necessary, the preliminary design of sediment
remediation in the system.
The 1993 portion of the study concluded that sediments of the
Newton Creek system are:
- significantly contaminated with a variety of pollutants;
- toxic to aquatic organisms; and
- unsupportive of a healthy benthic macroinvertebrate community.
The 1994 portion of the study was designed specifically to:
- better define areas and depths of sediments and floodplain
soils that may require remediation;
- indicate if solid wastes generated by remediation would be
subject to hazardous waste management requirements; and
- acquire additional information on biological impacts in the
Newton Creek system.
Status: Closed out
Data Results: Diesel range organic (DRO) concentrations
are highest in Newton Creek Impoundment, where they exceed 10,000
µg/g at four of five open water sampling locations. The highest
concentrations of metals, including lead, chromium, and mercury, are
found in Newton Creek Impoundment, some areas of Newton Creek, and
in Hog Island Inlet, near either the western portion or near the
mouth of Newton Creek.
Environmental Results/Products: The study led to the Site
Characterization Report which described prioritization and
preliminary design of remedial options. A Feasibility Study Report
was completed which included five remedial alternatives. The
potential effectiveness of land application, one of the five
alternatives, was evaluated in the report Results of Aerobic
Biodegradation Screening Treatability Study for the Newton Creek
System. Based on the findings of this study, WDNR recommends that
areas of Newton Creek Impoundment, Newton Creek, and Hog Island
Inlet be considered for remediation. These areas recommended for
remediation include a volume of "soft sediment" estimated as 19,900
cubic yards in place.
#18 - NEW YORK ERIE CANAL
(FY1996 - GL985364-01-0)
New York State Canal Corporation
Contact: John Dergosits
New York State Canal Corporation
200 Southern Boulevard
P.O. Box 189
Albany, NY 12201-0189
Tel: (518) 471-5020
Fax: (518) 471-5023
Award Amount: FY1996 - $120,000
Project Timetable: October 15, 1996 - June 30, 1998
GLNPO Project Officer: Debbie Siebers
Project Location: Erie Canal, New York State
Partners: Rensselaer Polytechnic Institute
Narrative: Data collected by both the New York State Canal
Corporation (NYSCC) and the New York State Department of
Environmental Conservation (NYSDEC) have shown that sediments within
the Erie Canal contain variable levels of contaminants. Additional
sediment collection and evaluation is required to define the exact
upstream and downstream contaminant boundaries, the likely sources
of dioxin/furan, PCB, and heavy metal contamination and the general
time horizons of the contaminant discharge.
The project goal is to identify and quantify the character
of sediments in the Erie Canal between its confluence with the
Niagara River in North Tonawanda, New York and its junction with the
Genesee River near Spencerport, New York.
Status: Ongoing
Data Results: Incoming
Environmental Results/Products: Characterization of
sediment contamination will allow for future activity to be focused
on areas most in need and will provide preliminary information
concerning the need for remediation.
#19 - OHIO REFERENCE SITE SEDIMENT
CHARACTERIZATION
(FY1995 - GL985203-01-0)
Ohio Environmental Protection Agency
Contact: John F. Estenik
Ohio Environmental Protection Agency
Division of Surface Water, Wetlands Program
1800 WaterMark Drive
Columbus, OH 43215-1099
Tel: (614) 644-2866
Fax: (614) 644-2329
Award Amount: FY 1995 - $110,000
Project Timetable: October 1, 1995 - September 30, 1997
GLNPO Project Officer:
Callie Bolattino (312)
353-3490
Project Location: Ohio's Lake Erie Basin
Partners: Heidelberg College, USEPA Region 5
Narrative: The Ohio Environmental Protection Agency (OEPA)
has developed numeric biocriteria (i.e., biological) State Water
Quality Standards for five Ohio Ecoregions. Ecoregional reference
sites within Ohio's four Lake Erie Areas of Concern (AOCs) drainage
basins have not been adequately assessed physically and chemically
for sediment contamination.
Sediment samples will be collected for physical and chemical
assessment from three site categories:
- upstream from Ohio's four Lake Erie AOCs (lower Maumee River,
lower Black River, lower Cuyahoga River, and lower Ashtabula
River);
- ecoregional (biocriteria sites) reference samples within the
four Lake Erie AOCs from three ecoregions: Huron Erie Lake Plain,
Erie/Ontario Lake Plain, and Eastern Corn Belt Plains. These
sample locations are unimpacted and should have low contaminant
concentrations present;
- EMAP reference samples selected by randomizing sampling site
location selection as a basis for evaluating all sediment site
data and for a comparison to OEPA historical and future sediment
data; these sites should also have low contaminant concentrations.
Project objectives include:
- to determine if sources exists outside the AOC for pollutants
of concern identified in the AOC;
- to update and provide a significant expansion of parameters
possibly affecting beneficial use impairment;
- to refine a list of critical pollutants of concern; and,
- to evaluate the impact of nonpoint source pollutant
contribution.
This project is part of a larger effort which includes more
extensive collection of ecoregional (biocriteria sites) samples.
Support for the larger effort includes funding from one other grant
and state funding (total funding for the study, including GLNPO:
~$300,000).
Status: Ongoing
Data Results: Incoming
Environmental Results/Products: The project will enable
OEPA to determine how much contamination in the Lake Erie AOCs may
be originating from discrete upstream sources or from diffuse
"background" sources.
#20 - OLCOTT HARBOR SEDIMENT STUDY
(FY1993 - GL995405-01-0)
New York State Department of Environmental Conservation
Contact: Bruce Garabedian
New York State Department of Environmental Conservation
50 Wolf Road, Room 305
Albany, NY 12233-3502
Tel: (518) 457-0729
Fax: (518) 485-7786
Award Amount: FY1993 - $92,000
Project Timetable: October 1, 1993 - December 31, 1995
GLNPO Project Officer: Diane Dennis-Flagler
Project Location: Olcott Harbor, New York
Narrative: Olcott Harbor is at the mouth of Eighteenmile
Creek which is an Area of Concern (AOC). Elevated dioxin levels have
been found in sediments behind the Newfane Dam and elevated levels
of heavy metals have been detected in sediments of Eighteenmile
Creek. There is, however, a significant lack of ambient data to
fully characterize the extent of the problem in Olcott Harbor.
The project goal is to provide a screening
characterization of contaminant levels in the sediments of Olcott
Harbor. Both surficial samples and sediment cores will be collected,
and some cores will be radioisotope dated in order to identify
recent deposition.
Status: Ongoing
Data Results: Incoming
Environmental Results/Products: Data will be used to assess
depositional rates and evaluate the toxicity of sediments on the
benthic community. The study results will also be used in the
development of a Remedial Action Plan for the Eighteenmile Creek
Area of Concern.
#21 - OSWEGO RIVER SEDIMENT STUDY
(FY1994 - GL95660-01-0)
New York State Department of Environmental Conservation
Contact: Bruce Garabedian
New York State Department of Environmental Conservation
50 Wolf Road, Room 305
Albany, NY 12233-3502
Tel: (518) 457-0729
Fax: (518) 485-7786
Award Amount: FY1994 - $115,721
Project Timetable: September 6, 1994 - December 31, 1995
GLNPO Project Officer: Diane Dennis-Flagler
Project Location: Oswego River, New York
Narrative: The Oswego River and Harbor have been designated as an
Area of Concern due to past industrial and municipal discharges
which have contaminated the water column and bottom sediments. Data
generated from the sediment study will be used to characterize the
nature and extent of all potential contaminants in the Oswego AOC.
Sediment toxicity and biological impairment, if any, will also be
characterized. Sediment cores will be collected for chemical analysis and
surficial samples will be collected for toxicity testing.
The sampling plan includes coverage of the Oswego River upstream
of the AOC, a region for which very little information currently
exists documenting benthos conditions. Information from these upstream
sites will be necessary to adequately evaluate remediation measures,
if necessary, in the AOC as natural transport mechanisms move
contaminated sediments from upstream sites into the AOC.
Status: Closed out
Data Results: The highest levels of contamination were detected
in two cores collected at Battle Island. Extremely high levels of
total PAHs (> 27,000 ug/kg) were detected, as well as high concentrations of
lead (764 mg/kg), mercury (1.5 mg/kg), silver (1.6 mg/kg), and zinc
(277 mg/kg), and relatively high concentrations of dioxin (266 ug/kg),
furan (29 ug/kg), and mirex (135 ug/kg). Battle Island is just
downstream from Armstrong World Inc., which had already been suspected to be
the source of high mirex concentrations.
Environmental Results/Products: Results will allow for the
assessment of depositional rates and evaluation of sediment toxicity
on the benthic community, as well as the prioritization of necessary
remediation measures in the AOC.
#22 - OTTAWA RIVER REMEDIATION PROJECT
(FY1996 - GL985333-01-0)
Ohio Environmental Protection Agency
Contact: Ralph McGinnis
Ohio Environmental Protection Agency
Division of Emergency and Remedial Response
1800 WaterMark Drive
Columbus, OH 43215-1099
Tel: (614) 644-3065
Fax: (614) 644-3250
Award Amount: FY1996 - $500,000
Project Timetable: September 30, 1996 - September 29, 1998
GLNPO Project Officer: Marc Tuchman
(312) 353-1369
Project Location: Ottawa River, Ohio/Maumee Bay Area Of Concern
Partners: GenCorp Inc., City of Toledo, Maumee RAP team
Narrative: Sediments in the Unnamed Tributary of the Ottawa River
are believed to be the primary source of PCB contamination to the Maumee Bay area. The highest levels of PCBs in sediments (2500
ppm) in the Maumee River basin were found in the Unnamed Tributary.
These sediments are resuspended during rainfall events and
transported downstream to the Ottawa River, Maumee Bay, and
ultimately to Lake Erie.
Project objectives include:
- final assessment and interim action to prevent resuspension of
sediments into the Ottawa River;
- remediation of contaminated sediments, which may involve removal
and
- disposal of sediments or onsite treatment to remove or destroy
PCB contamination;
- confirmation of remediation by sampling;
- final site restoration; and,
- followup sampling of sediment, fish tissue, and water to show
risk reduction.
In partial fulfillment of the first objective, a detailed
assessment of the Unnamed Tributary was undertaken in late 1996 in
order to determine the extent of the PCB contamination.
Status: Ongoing
Environmental Results/Products: Removal of the hot spot of highly
contaminated PCB sediments from the Unnamed Tributary will achieve definite risk reduction for both the Ottawa River and Maumee Bay,
as well as Lake Erie.
#23 - DESIGN AND DEVELOPMENT OF SAGINAW RIVER GIS
(FY1995 - IAG - DW96947741-01-0)
U.S. Army Corps of Engineers
Contact: Jim Galloway
U.S. Army Corps of Engineers
ATTN: CENCE-EP-E
P.O. Box 1027
Detroit, MI 48231
Tel: (313) 226-6760
Fax: (313) 226-7095
Award Amount: FY 1995 - $57,000
Project Timetable: August 21, 1995 - August 31, 1997
GLNPO Project Officer: Callie Bolattino 312-353-3490
Project Location: Saginaw River, Michigan
Partners: Michigan Department of Environmental Quality
Narrative: This project will focus on providing sediment data
management and technical assistance in pursuit of sediment
remediation for the Saginaw River. The need for a data management system for the
Saginaw River Area of Concern (AOC) is critical because of the
considerable amount of data collected by various researchers. The need to
compare many of these studies and determine trends is vital to any
future decision-making.
The goal of this project is to develop a database and geographic
information system (GIS) which will provide means for importing and reporting contaminated sediment sampling data for the Saginaw
River AOC. This will involve the compilation of previously collected
sediment data in digital or hardcopy form and the transfer of this data
into a standard database format. The intention is to give the
participants involved in the Saginaw River Remedial Action Plan (RAP) the access to this
sediment data management system in an attempt to encourage data
analysis and promote remedial discussions.
Status: Ongoing
Data Results: Project involves database development and not
sample collection.
Environmental Results/Products: The development of a Saginaw
River GIS which will be used to enhance sediment management
decisions in the Saginaw River AOC.
#24 - USE OF CONGENER-SPECIFIC PCBs TO DISTINGUISH AMONG SOURCES
OF PCBs INPUT INTO THE SAGINAW RIVER AND SAGINAW BAY
(FY1995 - GL985191-01-0)
University of Michigan
Contact: David J. Jude
2200 Bonisteel Blvd.
Center for Great Lakes and Aquatic Sciences
University of Michigan
Ann Arbor, MI 48109-2099
Tel: (313) 763-3183
Fax: (313) 747-2748
Award Amount: FY 1995 - $101,353
Project Timetable: September 29, 1995 - August 31, 1997
GLNPO Project Officer: Marc Tuchman
(312) 353-1369
Project Location: Saginaw River, Michigan
Narrative: Sediments in the Saginaw River, a Great Lakes Area of
Concern, have been contaminated by many toxic substances, including PCBs. Characterization of the PCBs using congener-specific
analyses is important to elucidate food chain relationships,
identify the more toxic contaminants, and determine the sources of PCBs within the
Saginaw River using the congeners as unique signatures from the
various sources of PCBs in the river system and airshed.
The project goal is to determine the transport and sources of
PCBs in the Saginaw River watershed.
Specific objectives include:
- document representative PCB concentrations and congener-specific
patterns in the sediments of the 4 major tributaries of the Saginaw River and at locations within the Saginaw River;
- document how the PCB concentrations and patterns change during
rain events as a water mass moves downstream; and,
- determine the consistency in the congener-specific signature of
air-deposited PCBs in the watershed.
Status: Ongoing
Data Results: Incoming
Environmental Results/Products: The data can be used in models to
elucidate the transport of PCBs throughout the river system,
including determination of possible deposition sites in the Saginaw River.
#25 - ASSESSMENT OF CONTAMINATED SEDIMENTS IN LAKE MICHIGAN AOCs
- SHEBOYGAN RIVER FOOD CHAIN AND SEDIMENT CONTAMINANT ASSESSMENT
(FY1994 - GL995681-01-0)
Wisconsin Department of Natural Resources
Contact: Bob Paulson
Wisconsin Department of Natural Resources - WT/2
Bureau of Watershed Management
101 S. Webster Street
P.O. Box 7921
Madison, WI 53707-7921
Tel: (608) 266-7790
Fax: (608) 267-2800
Award Amount: FY1994 - $195,770
Project Timetable: August 1, 1994 - September 30, 1996
GLNPO Project Officer: Marc Tuchman 312-353-1369
Project Location: Sheboygan River, Wisconsin
Narrative: Contaminated sediment has been identified as a major
contributor of toxics to the Sheboygan AOC. Although actions to
address remediation have been initiated for the lower segment of the
river, management decisions relating to contaminated sediment
remediation need to assume a broader focus. This broader focus should benefit the
river from its upper reaches, which are reflective of background
conditions, downstream to the harbor.
The project goal is to develop linkages of contaminant transfer
pathways between sediment, the water column and the food chain
within the Sheboygan River AOC.
The project objectives are to:
- provide baseline information for the Sheboygan River RAP
long-term trend monitoring in order to gauge the effectiveness of
future remedial actions and delist pertinent impaired beneficial uses;
- determine the bioavailability of toxic substances and
bioaccumulation of PCBs through the food chain in the AOC;
- provide information to evaluate spatial and media distribution of
PCB congeners in the AOC and the availability to aquatic
communities; and,
- provide information about the distribution, bioavailability, and
bioaccumulation of PAHs and heavy metals in the river.
Status: Ongoing
Data Results: Highly elevated concentrations of PAHs were found
in a core taken near Camp Marina, just south of the island. The core segment between the depths of 3-5 feet had over 3,400 ppm total
PAHs. Elevated concentrations of PCBs were found at many sites, including over 14,750 ppb just downstream of the Rochester Park
Launch and over 10,500 ppb at a site above the Riverbend Dam, just downstream of Rochester Park Island.
Environmental Results/Products: By determining the contribution,
composition, and distribution of contaminants associated with river sediments, the project will provide a basis for making management
decisions throughout the river from its upper reaches to the harbor.
#26 - SEDIMENT REMEDIATION SCOPING PROJECT IN THE ST. LOUIS RIVER
AOC - SLIP C
(FY1995 - GL985131-01-0)
Minnesota Pollution Control Agency
Contact: Judy Crane
Minnesota Pollution Control Agency
Water Quality Division
520 Lafayette Rd. N.
St. Paul, MN 55155-4194
Tel: (612) 297-4068
Fax: (612) 297-8683
Award Amount: FY1995 - $100,000 (Sediment Remediation portion of MPCA cluster grant)
Project Timetable: October 1, 1995 - September 30, 1998
GLNPO Project Officer: Callie Bolattino 312-353-3490
Project Location: St. Louis River Area of Concern,
Duluth/Superior Harbor (Duluth, MN/Superior, WI)
Partners: Sediment Contamination Workgroup of the St. Louis River
Remedial Action Plan
Narrative: Sediment contamination has been documented in the
Duluth/Superior Harbor area of the St. Louis River Area of Concern. Sediment assessments were performed in 1993 and 1994 (projects #5
and #6). These assessments provided a framework for prioritizing sediment remediation activities within the AOC.
The goal of this sediment remediation scoping project is to
implement a hotspot management plan at one site in the
Duluth/Superior Harbor that will have the end result of a remediation action. The
original site selected, Grassy Point/Hibbard Power Plant, has
recently been changed to Slip C, by Superwood. A new Scope of Work and Quality
Assurance Project Plan (QAPP) are currently being prepared for the
Slip C site.
The specific objectives of this project are to:
- delineate the extent and depth of contamination of sediments in
Slip C;
- develop sediment remediation options for Slip C; and,
- develop an updated sediment management paln for this site.
Information on historical and current sources of contamination to
Slip C, as well as historical and current land use patterns for the
area surrounding Slip C, are being obtained. A random sampling grid
will be used to collect sediment samples for visual analysis. Within
these sites, samples for chemical analyses will be selected on a non-random basis, in order to tie the most visual types of sediment
with levels of particular contaminants (e.g., PAHs, mercury, PCBs,
toxaphene, ammonia). Sediment sampling will be conducted by early summer,
1997.
Status: Ongoing
Data Results: Data not yet collected
Environmental Results/Products: Information and experience gained
during this project will be available for use in future remediation scoping projects at other Duluth/Superior Harbor locations.
Remediation studies could lead to the enforcement or establishment
of protective permits to limit further point source contamination of sediments.
#27 - CHARACTERIZATION OF TRENTON CHANNEL SHORELINE SEDIMENTS
(FY1993 - GL995960-02-0)
Michigan Department of Environmental Quality
Contact: Art Ostaszewski
Michigan Department of Environmental Quality
Surface Water Quality Division
Hollister Building
PO Box 30473
Lansing, MI 48909-7973
Tel: (517) 335-4491
Fax: (517) 373-9958
Award Amount: FY1993 - $200,000
Project Timetable: October 1, 1993 - March 31, 1996
GLNPO Project Officer: Marc Tuchman
(312) 353-1369
Project Location: Trenton Channel of Detroit River, Michigan
Narrative: Sediments in the Trenton Channel of the lower Detroit
River, a heavily industrialized area and a major navigation route,
have been identified as one of the most severely contaminated areas in the
entire Detroit River Area of Concern. The need has been identified
to better delineate "hot spots" in the Trenton Channel.
The USEPA and Michigan Department of Natural Resources (MDNR)
jointly established a work group to focus research and remediation activity in the Trenton Channel. The work group objective is to
develop effective processes for assessing and remediating
contaminated sediments in large river systems. The goal of this project is to
characterize the Trenton Channel shoreline sediments.
To meet this goal, precursory sediment data will be collected to:
- define the magnitude and extent of sediment contamination; and,
- identify "hot spots".
Status: Ongoing
Data Results: Elevated levels of PCBs and several heavy metals
were observed at many stations. Hot spots include Black Lagoon,
where elevated concentrations were observed for Cd (30 ug/g), Hg (7.8
ug/g), Pb (574 ug/g), Ni (206 ug/g), and Zn (3320 ug/g). The area
near Monguagon Creek is highly contaminated by Cd (40 ug/g), Cr (500
ug/g), Hg (11 ug/g), Ni (251 ug/g), and PCBs (12.3 ug/g). Other hot spots were Firestone Steel (10 ug/g Hg) and the north channel of
Elizabeth Park (10.3 ug/g PCBs).
Environmental Results/Products: The information collected will be
used to help prioritize areas in the Trenton Channel for
remediation. Successful application of sediment remediation technology for the
Trenton Channel could result in an expansion of this effort for the
entire Detroit River.
#28 -TRENTON CHANNEL SEDIMENT SUPPORT
(FY1995 - IAG - DW96947740-01-0)
U.S. Army Corps of Engineers
Contact: Jim Galloway
U.S. Army Corps of Engineers
ATTN: CENCE-EP-E
P.O. Box 1027
Detroit, MI 48231
Tel: (313) 226-6760
Fax: (313) 226-7095
Award Amount: FY1995 - $75,000 (IAG total $225,000 for Trenton
Channel and Clinton River (project #3) combined)
Project Timetable: July 31, 1995 - December 31, 1996
GLNPO Project Officer:
Callie Bolattino (312) 353-3490
Project Location: Trenton Channel of Detroit River, Michigan
Partners: Michigan Department of Environmental Quality
Narrative: Sediments in the Trenton Channel of the lower Detroit
River, a heavily industrialized area and a major navigation route,
have been identified as one of the most severely contaminated areas in the
entire Detroit River Area of Concern. A FY1993 study (project #27) characterized channel shoreline sediments by collecting
precursory sediment data for model development, model components and
hot spot identification. Surficial samples collected in 1993 and 1994
revealed sediment depositional zones severely contaminated with
heavy metals, including mercury, in upstream portions of the Trenton Channel.
The goal of this Interagency Agreement (IAG) is to conduct
comprehensive assessments of sediments within three specific areas
of the channel in order to determine the depth and degree of contamination and
provide technical assistance in pursuit of sediment remediation for
the Trenton Channel. The project also involves collection of a third year of
monitoring data near the Elizabeth Park Marina to determine trends
in benthic community response and sedimentation following dredging in the
Trenton Channel. This information will help validate model
predictions and give an indication as to the degree of contaminated sediment
being deposited in the lower Trenton Channel as a result of upstream
sources.
The information will also assist in the development of remedial
designs for other areas of extensive contamination within the
Trenton Channel.
Status: Ongoing
Data Results: Twenty stations were sampled in the Upper Trenton.
Sites with high levels of organic and heavy metal contamination
included Firestone Steel, Nicholson South Boat Slip, and Allied Fuel Oil
Slip. Concentrations in these area were: mercury, 20 ppm; PCBs, 20
ppm; lead, 580 ppm; copper, 630 ppm; cadmium, 35 ppm; PAHs, 200 ppm;
and oil and grease, 71,000 ppm. The results of this study, along
with the other research studies of the Trenton Channel Project,
indicate that the majority of the Trenton Channel contamination is
found in depositional zones along the Michigan mainland shore and is
primarily associated with industrial sources that are no longer
present.
Environmental Results/Products: The information collected will be
used as part of a mass balance modeling effort for the Trenton
Channel. Successful application of sediment remediation technology for the
Trenton Channel could result in an expansion of this effort for the
entire Detroit River. The work performed under this grant could also be
adapted to similar Areas of Concern such as the St. Clair River or
the St. Mary's River.
#29 -BENCH SCALE FEASIBILITY/TREATABILITY STUDY IN TRENTON
CHANNEL
(FY1995 - GL985207-01-0)
Michigan Department of Environmental Quality
Contact: Art Ostaszewski
Michigan Department of Environmental Quality
Surface Water Quality Division
Hollister Building
PO Box 30473
Lansing, MI 48909-7973
Tel: (517) 335-4491
Fax: (517) 373-9958
Award Amount: FY1995 - $125,000
Project Timetable: October 1, 1995 - September 30, 1997
GLNPO Project Officer: Marc Tuchman
(312) 353-1369
Project Location: Trenton Channel of Detroit River, Michigan
Narrative: Sediments in the Trenton Channel of the lower Detroit
River, a heavily industrialized area and a major navigation route,
have been identified as one of the most severely contaminated areas in the
entire Detroit River Area of Concern. Existing work in the Trenton
Channel includes re-investigation of zones of contamination to determine
depth of contamination (projects #27 and #28) and the development of advanced survey techniques (hydroacoustic profiling) to assess
sediment contamination (project #30).
The objective of this project is to collect sediment from Trenton
Channel contaminated sites for bench-scale evaluation of remedial
treatment technologies. Using the Remediation Guidance Document developed
by the ARCS Program as a guide, feasibility evaluations and
treatment technologies would be assessed for contaminated sites in the
Trenton Channel.
Status: Ongoing
Environmental Results/Products: Anticipated study products
include:
- a Site Review Report identifying the zones of contamination in
the Trenton Channel;
- an Applicable Treatment Technology Review; and,
- a Final Report evaluating aspects of treatment effectiveness,
costs, options, and applicability.
#30 - HYDROACOUSTIC PROFILING IN TRENTON CHANNEL, MI
(FY1995 - IAG - DW96947730-01-0)
U.S. Army Corps of Engineers
Contact: Darla McVan
U.S. Army Corps of Engineers
Waterways Experimental Station
3909 Halls Ferry Road
Vicksburg, MS 39180-6199
Tel: (601) 634-2869
Fax: (601) 634-3694
Award Amount: FY1995 - $120,000
Project Timetable: May 1, 1995 - September 30, 1997
GLNPO Project Officer: Marc Tuchman
(312) 353-1369
Project Location: Trenton Channel of Detroit River, Michigan
Narrative: This study is an investigation into the applicability
of hydroacoustic profiling in the mapping of bottom sediments.
Results of a preliminary acoustical sediment survey conducted in 1994
identified the need to optimize the equipment for use in shallow
water (2-30 ft.) and in sediment areas which exhibit a high degree of sediment
heterogeneity.
The goal of this project is to determine the appearance of the
sediment strata in the near shore area of Trenton Channel and to
determine the soft sediment-hardpan boundary to enable the calculation of
sediment volume.
Project objectives are:
- conduct a hydro-acoustic survey to determine the proper spatial
hydroacoustic sampling rates;
- determine if statistical processing can be obtained to relate
this data to general survey procedures; this will allow future use
of hydroacoustic techniques to minimize closely-spaced coring and
expensive core analysis;
- map sediment distribution by physical type at depth for use in
sediment resuspension modeling; and,
- calculate the volume and location of soft sediment in the study
area.
Status: Ongoing
Data Results: No sediment data collected.
Environmental Results/Products: Project results will be used to
help develop a cost effective and rapid means of mapping the
distribution of sediments in harbors and rivers which is required to
facilitate the remediation decisions facing environmental managers.
#31 -TRACE LEVEL PCB CONCENTRATIONS IN TRENTON CHANNEL
(FY1994 - GL995664-01-0)
Michigan State University
Contact: John P. Giesy
Department of Fisheries and Wildlife
Pesticide Research Center
#13 Natural Resources Building
Michigan State University
East Lansing, MI 48824-1222
Tel: (517) 353-2000
Fax: (517) 432-1984
Award Amount: FY1994 - $96,000
Project Timetable: September 13, 1994 - April 1, 1996
GLNPO Project Officer: Marc Tuchman
(312) 353-1369
Project Location: Trenton Channel of Detroit River, Michigan
Partners: Michigan Department of Environmental Quality
Narrative: Sediments in the Trenton Channel of the lower Detroit
River, a heavily industrialized area and a major navigation route,
have been identified as one of the most severely contaminated areas in the
entire Detroit River Area of Concern. Sediment contamination in the
Trenton Channel has been extensively characterized through the course of
many studies, including projects #27 and #28. Plans for sediment remediation are currently being made. Prior to remediation, it
must be determined if there are still any point or non-point sources
of critical pollutants, including PCBs, to the Detroit River and Trenton
Channel.
Project objectives include:
- determine congener-specific and total concentrations of PCBs in
the water column of the Trenton Channel, Detroit River, and
vicinity;
- determine the effect of storm-driven resuspension events on the
concentrations of PCBs in the nearshore vicinity of the Trenton
Channel;
- determine seasonal differences in the concentrations of PCB
congeners in the water; and
- estimate annual loadings of PCBs to the Trenton Channel.
Status: Ongoing
Data Results: Incoming (no sediment samples; water samples and semipermeable membrane devices (SPMD) only)
Environmental Results/Products: The knowledge gained from this
project will allow for the calibration of mass transport models and
a better description of the seasonal and weather-related loading of
concentrations of PCBs in the Trenton Channel.
#32 - WAUKEGAN HARBOR AOC USE IMPAIRMENT REASSESSMENT 1995
(FY1995 - GL985226-01-0 and DW14947756-01-0)
Illinois Environmental Protection Agency and United States
Geological Survey
Contact: Robert Schacht
Illinois Environmental Protection Agency
1701 First Avenue
Maywood, IL 60153
Tel: (708) 338-7900
Fax: (708) 338-7930
Chris Ingersoll
United States Geological Survey
Midwest Science Center
4200 New Haven Rd.
Columbia, MO 65201
Tel: (573) 876-1819
Fax: (573) 876-1896
Award Amount: FY1995 - $100,000 (to IEPA) and FY1995 IAG -
$40,000 (to USGS)
Project Timetable: October 1, 1995 - September 30, 1997
GLNPO Project Officer:
Callie Bolattino (312) 353-3490
Project Location: Waukegan Harbor, Northeast Illinois, Lake
Michigan
Narrative: Waukegan Harbor was listed as an Area of Concern (AOC)
based on contamination by PCBs. Sediment and water sampling in 1990 helped identify areas in need of remediation. In 1993, USEPA
announced the completion of a harbor dredging project which removed 1,000,000 pounds of PCBs from the harbor and adjacent property.
The primary goal of this study is to provide an update to
previous studies in the area and to assess the status of previously
listed use impairments. Data collected will provide the basis for de-listing
if improvements are sufficient.
Specific objectives include:
- the use of sediment core samples to provide a detailed analysis
of present sediment conditions which can be used for future dredging and disposal determinations.
- the use of sediment and water chemistry and sediment bioassay
analysis to establish a data set as
- the basis for the use impairment assessment.
- the evaluation of fish contaminant samples in relation to annual
fish consumption advisories.
Status: Ongoing
Data Results: Icoming
Environmental Results/Products: Study information will be
provided to the Illinois Interagency Fish Contaminant Work Group,
the Great Lakes states, and the public. Data will be entered into the USEPA
STORET database. The project will provide information useful to the
Lake Michigan Mass Balance model presently under development.
#33 - WHITE LAKE, MICHIGAN SEDIMENT ASSESSMENT
(FY1994 - IAG - DW96947710-01-0)
U.S. Army Corps of Engineers
Contact: Jim Galloway
U.S. Army Corps of Engineers
ATTN: CENCE-EP-E
P.O. Box 1027
Detroit, MI 48231
Tel: (313) 226-6760
Fax: (313) 226-7095 FAX
Award Amount: FY1994 - $61,696 (White Lake and Muskegon Lake
(project #16) combined; IAG total $221, 000 for White/Muskegon Lakes and Clinton River (project #2) combined)
Project Timetable: September 1, 1994 - September 30, 1995
GLNPO Project Officer: Marc Tuchman
(312) 353-1369
Project Location: White Lake, Michigan
Partners: Michigan Department of Environmental Quality
Narrative: White Lake, a 2,570 acre drowned river mouth located
on the east shore of Lake Michigan, has been designated as a Great Lakes Area of Concern (AOC) due to a number of water quality
problems including contaminated sediments and nutrient enrichment.
Previous studies have shown that historical municipal and industrial
discharges to the lake have resulted in elevated concentrations of
many heavy metals.
In response to the need for more current data and confirmation of
a suspected sediment "hot spot", a sediment sampling survey of White
Lake, Michigan was conducted.
Project objectives were as follows:
- collect sediment cores to determine contaminant concentration and
vertical profiles;
- characterize the areal extent of contaminants of concern;
- determine the necessary levels of remedial action and agency
involvement, and develop an implementation time table.
Status: Closed out
Data Results: Arsenic, chromium, and mercury were consistently
found at very high levels, while lead, nickel and zinc were also
found at elevated levels but in a more inconsistent and less dramatic
pattern. The major amount of contamination was located directly
adjacent to the Whitehall Leather Company property in the vicinity of their
lagoons, where the highest concentrations of As (569 mg/kg), Cr
(14,300 mg/kg), and Hg (16.7 mg/kg) were all found.
Environmental Results/Products: Results from this study better
delineated contaminant hotspots and were used to help plan for
further biological characterization of the area which was conducted in
October of 1996.
#34 - PRELIMINARY INVESTIGATION OF WHITE LAKE NEAR WHITEHALL
TANNERY
(FY1996 - IAG - DW13947766-01-0)
National Oceanic and Atmospheric Administration
Contact: Gary Fahnenstiel
National Oceanic and Atmospheric Administration
Great Lakes Environmental Research Lab
1431 Beach Street
Muskegon, MI 49441
Tel: (616) 759-7824
Fax: (616) 759-7906
Award Amount: FY1996 - $148,100
Project Timetable: August 15, 1996 - December 31, 1997
GLNPO Project Officer: Marc Tuchman
(312) 353-1369
Project Location: White Lake, Michigan
Partners: Michigan Dept. of Environmental Quality, Grand Valley
St. Univ., White Lake PAC
Narrative: White Lake is a Great Lakes Area of Concern located on
the eastern shore of Lake Michigan. Elevated levels of heavy metals have been found in the northeastern section of the lake in
previous studies, including Project #33. The elevated metal
concentrations are located near the Whitehall Leather Tannery (Tannery Bay). The
current extent of sediment contamination in the area outside of
Tannery Bay is unknown with respect to spatial and vertical distribution. In
addition, since previous studies focused only on chemical
contamination, the biological impacts of the heavy metal contamination have not been
evaluated.
Project objectives are to:
- determine the extent of sediment contamination in eastern White
Lake, including the Tannery Bay area.
- determine the abundance and diversity of benthic invertebrates in
the Tannery Bay area;
- evaluate the toxicity of sediments from sites in the Tannery Bay
area;
- evaluate the bioaccumulation of metals from sediments in the
Tannery Bay area.
Status: Ongoing
Data Results: Data collection was initiated in October 1996 and
will be completed in August 1997
Environmental Results/Products: The investigation will provide
information necessary for the development and evaluation of
remediation alternatives for the Tannery Bay area.
|