Draft Engineering Performance Standards - Peer Review Copy (October 2003)

Volume 1 of 4
Part 1: Performance Standard For Dredging Resuspension

Individual Files Contents of Volume 1

Free PDF reader available Cover Letter | Executive Summary | Introduction | Tables | Figures [2.86 MB, 188 pages]

Free PDF reader available Attachments A, B, & C[2.43 MB, 136 pages]

Free PDF reader available Attachment D [2.67. MB, 167 pages]

Free PDF reader available Attachments E, F, & G [1 MB, 94 pages]

Executive Summary
Introduction
1.0 Statement of the Performance Standard for Dredging Resuspension
2.0 Technical Basis of the Performance Standard for Dredging Resuspension
3.0 Implementation of the Performance Standard for Dredging Resuspension
4.0 Plan for Refining the Performance Standard for Dredging Resuspension
5.0 References
Tables
Figures
Attachment A Hudson River Water Column Concentration Analysis
Attachment B Resuspension Sensitivity
Attachment C Examination of Mechanisms for High Dissolved Phase PCB Concentrations
Attachment D Modeling Analysis
Attachment E Engineering Contingencies
Attachment F Measurement Technologies
Attachment G A Discussion of Data Quality Objectives

 

Back To Top

Volume 2 of 4
Part 2: Performance Standard For Dredging Residuals

Individual Files Contents of Volume 2

Free PDF reader available Cover Letter | Executive Summary | Introduction | Residual Standards | Tables [1.75 MB, 130 pages]

Free PDF reader available Attachment A

Executive Summary
Introduction
1.0 Statement of the Performance Standard for Dredging Residuals
2.0 Technical Basis of the Performance Standard for Dredging Residuals
3.0 Implementation of the Performance Standard for Dredging Residuals
4.0 Plan for Refining the Performance Standard for Dredging Residuals
5.0 References
Tables
Figures
Attachment A Case Study Site Residual Data & New Bedford Harbor Pre-Design Test Residual Results Evaluati

 

Back To Top

Volume 3 of 4
Part 3: Performance Standard For Dredging Productivity

Individual Files Contents of Volume 3

Free PDF reader available Cover Letter | Executive Summary | Introduction |Productivity Standards | Tables | Attachement I [1.52 MB, 129 pages]

Free PDF reader available Attachment 2.0

Free PDF reader available Attachment 3.0 – 3-A [2.43 MB, 17 pages]

Free PDF reader available Ttachment 3-A (con't) | RMs 188.5 to 163.25 [2.4 MB, 8 pages]

Free PDF reader available Subpart 3-B[1.83 MB, 19 pages]

Free PDF reader available Subpart 3-C: | Attachment [2 MB, 23 pages]

Cover Letter
Executive Summary
Introduction
1.0 Statement of the Performance Standard for Dredging Productivity
2.0 Technical Basis of the Performance Standard for Dredging Productivity
3.0 Implementation of the Performance Standard for Dredging Productivity
4.0 Plan for Refinement of the Performance Standard for Dredging Productivity
Tables
Figures
Attachment 1.0 Productivity Schedule
Attachment 2.0 Productivity Schedule Backup
Attachment 3.0 Site Specific Quantity Development
Subpart 3-A: Existing Sediment Characteristics
Subpart 3-B: Mechanical Dredging Scenario
Subpart 3-C: Hydraulic Dredging Scenario
Attachment 4.0 Issues Associated with Processing 4500 Tons/Day at Moreau Landfill Site

 

Back To Top

Volume 4 of 4
Part 4: Case Studies of Environmental Dredging Projects

Individual Files Contents of Volume 4
Free PDF reader available Cover Letter | Executive Summary | Introduction | Appendix: Case Studies of Environmental Dredging Projects| Tables | Figures [2.67 MB, 161 pages]

Executive Summary
Introduction
1.0 Case Studies
2.0 Hudson River Data Collection
3.0 References
Tables
Figures

LocalNavigation