Jump to main content or area navigation.

Contact Us

Landfill Methane Outreach Program

Project Profile

City of Fort Smith High Btu Project

Location:
City of Fort Smith, Arkansas
End User(s):
Arkansas Oklahoma Gas Corporation
Sector(s):
Utility
Landfill(s):
City of Fort Smith Landfill
Landfill Size:
5 million tons waste-in-place (2008)
Project Type:
High Btu
Project Size:
2,300 standard cubic feet per minute (scfm)
Environmental Benefits:
Carbon sequestered annually by 6,100 acres of pine or fir forests, annual greenhouse gas emissions from 5,500 passenger vehicles, or carbon dioxide emissions from 66,700 barrels of oil consumed. Annual energy savings equate to heating 7,800 homes. Estimated emissions reductions of 0.0078 million metric tons of carbon equivalents.
LMOP Partners Involved:
Cambrian Energy Development, L.L.C., City of Fort Smith Department of Sanitation, SouthTex Renewables, LLC
Last Updated:
7/15/2010

Jump to main content.