Inspections
WIPP
Get e-mail updates when this information changes.
SRS-CCP-RH Proposed Baseline Approval
On August 30 - September 1, 2011, and December 6-7, 2011, EPA conducted a baseline inspection for the remote-handled (RH) transuranic (TRU) waste characterization program for the Department of Energy’s (DOE) Central Characterization Project (CCP) at Sandia National Laboratory in Albuquerque, New Mexico.
EPA has published an FR notice (77 FR 11112) and opened a 45-day public comment period on our proposed baseline approval. The comment period will officially close on April 9, 2012. EPA will not make a final baseline determination until after the comment period has closed and after evaluating and addressing public comments.
All documents pertaining to this action (e.g., FR notice, proposed baseline inspection report, etc.) can be found in the Agency’s electronic docket at http://www.regulations.gov . The direct link to the docket for this action can be found below:
SNL-CCP-RH Proposed Baseline Approval
On March 8, 2011, May 10, 2011, and June 7-8, 2011, EPA conducted a baseline inspection for the remote-handled (RH) transuranic (TRU) waste characterization program for the Department of Energy’s (DOE) Central Characterization Project (CCP) at Sandia National Laboratory in Albuquerque, New Mexico.
EPA has published an FR notice (76 FR 62062) and opened a 45-day public comment period on our proposed baseline approval. The comment period will officially close on November 21, 2011. EPA will not make a final baseline determination until after the comment period has closed and after evaluating and addressing public comments.
All documents pertaining to this action (e.g., FR notice, proposed baseline inspection report, etc.) can be found in the Agency’s electronic docket at http://www.regulations.gov . The direct link to the docket for this action can be found below:
BAPL-CCP-RH Proposed Baseline Approval
On August 30, 2010, September 23, 2010, December 8, 2010, and April 12-13, 2011, EPA conducted a baseline inspection for the remote-handled (RH) transuranic (TRU) waste characterization program for the Department of Energy’s (DOE) Central Characterization Project (CCP) at the Bettis Atomic Power Laboratory in West Mifflin, Pennsylvania.
EPA has published an FR notice (76 FR 33277) and opened a 45-day public comment period on our proposed baseline approval. The comment period will officially close on July 25, 2011. EPA will not make a final baseline determination until after the comment period has closed and after evaluating and addressing public comments.
All documents pertaining to this action (e.g., FR notice, proposed baseline inspection report) can be found in the Agency’s electronic docket at http://www.regulations.gov . The direct link to the docket for this action can be found below:
Hanford-CCP Proposed Baseline Approval
On April 27-29, 2010, EPA conducted a baseline inspection for the contact-handled (CH) transuranic (TRU) waste characterization program for the Department of Energy’s (DOE) Central Characterization Project (CCP) at the Hanford Site in Richland, WA.
EPA has published an FR notice (75 FR 54631) and opened a 45-day public comment period on our proposed baseline approval. The comment period will officially close on October 25, 2010. EPA will not make a final baseline determination until after the comment period has closed and after evaluating and addressing public comments.
All documents pertaining to this action (e.g., FR notice, proposed baseline inspection report) can be found in the Agency’s electronic docket at http://www.regulations.gov . The direct link to the docket for this action can be found below:
LANL-CCP Proposed Baseline Approval
On April 18, 2007, EPA issued a proposed baseline approval for the contact-handled (CH) radioactive waste characterization program for the Department of Energy’s (DOE) Central Characterization Project (CCP) at Los Alamos National Laboratory. EPA conducted an initial baseline inspection at LANL-CCP on March 23-25, 2006. Follow-up inspections were also conducted on August 22, 2006, and March 6, 2007.
EPA has published an FR notice (72 FR 19494) and opened a 30-day public comment period on our proposed baseline approval. The comment period will officially close on May 18, 2007. EPA will not make a final baseline determination until after the comment period has closed and after evaluating and addressing public comments.
All documents pertaining to this action (e.g., FR notice, proposed baseline inspection report) can be found in the Agency’s electronic docket at http://www.regulations.gov . The direct link to the docket for this action can be found below:
WWIS Approval -- ANL-CCP & INL-CCP
On January 17, 2007, EPA determined that the WIPP Waste Information System (WWIS), which is used to track RH TRU waste components, was adequate at both Argonne National Laboratory (ANL) and Idaho National Laboratory (INL), as implemented by the DOE's Central Characterization Program (CCP).
EPA previously approved the remote-handled (RH) TRU waste characterization (WC) programs at ANL-CCP and INL-CCP within the past week. These baseline approvals did not include the WWIS. The Agency stated that the WWIS would be evaluated independently and subject to review as a Tier 1 (T1) change.
The following approval letter and report (in conjunction with the ANL-CCP & INL-CCP final baseline inspection reports) completes EPA's initial evaluation for ANL-CCP and INL-CCP for RH TRU wastes for the WC systems included in the respective inspection reports and allows for the disposal of one RH TRU waste type (debris, S5000) at WIPP, contingent upon all other approvals that are required for DOE.
- WWIS Approval Letter (PDF) (6 pp, 261.89K)
- WWIS Report (PDF) (17 pp, 186.88K)
ANL-CCP Baseline Inspection Approval
On January 16, 2007, EPA approved the remote-handled (RH) radioactive waste characterization program for the Department of Energy’s (DOE) Central Characterization Project (CCP) at Argonne National Laboratory (ANL). EPA conducted a RH baseline inspection at ANL-CCP on September 12-14, 2006.
EPA published an FR notice on November 8, 2006 (71 FR 65488), and opened a 45-day public comment period on our proposed baseline approval. The comment period officially closed on December 26, 2006. After evaluating and addressing public comments, EPA is approving the ANL-CCP RH waste characterization (WC) program, as observed during the baseline inspection and as outlined in the accompanying approval letter and final inspection report.
This approval does not authorize DOE to dispose of RH waste from ANL-CCP at this time. Prior to the disposal of RH waste from ANL-CCP, DOE must obtain EPA’s approval of the system that is used to track and enter RH waste contents, the WIPP Waste Information System (WWIS). The WWIS was not ready for EPA’s review at the time of the baseline inspection. DOE has since provided information on the WWIS and the Agency is currently reviewing this information and will provide the results of its evaluation separately.
The Agency's approval letter and final inspection report can be found below, in Adobe .pdf format:
- EPA ANL-CCP RH Approval Letter (PDF) (5 pp, 1.70MB)
- ANL-CCP RH 9.06-8, Final Inspection Report (PDF) (117 pp, 954.20K)
All documents pertaining to this action can also be found in the Agency’s electronic docket, which can be found on the Federal Docket Management System (FDMS) website, linked below:
Once you are on the main page, conduct an advanced docket search of an Environmental Protection Agency docket with the following ID:
- EPA-HQ-OAR-2006-0881
INL-CCP Baseline Inspection Approval
On January 12, 2007, EPA approved the remote-handled (RH) radioactive waste characterization program for the Department of Energy’s (DOE) Central Characterization Project (CCP) at Idaho National Laboratory (INL). EPA conducted a RH baseline inspection at INL-CCP on June 12-16, 2006, and also conducted follow-up inspections on August 9 & August 29, 2006.
EPA published an FR notice on November 8, 2006 (71 FR 65488), and opened a 45-day public comment period on our proposed baseline approval. The comment period officially closed on December 26, 2006. After evaluating and addressing public comments, EPA is approving the INL-CCP RH waste characterization (WC) program, as observed during the baseline and follow-up inspection and as outlined in the accompanying approval letter and final inspection report.
This approval does not authorize DOE to dispose of RH waste from INL-CCP at this time. Prior to the disposal of RH waste from INL-CCP, DOE must obtain EPA’s approval of the system that is used to track and enter RH waste contents, the WIPP Waste Information System (WWIS). The WWIS was not ready for EPA’s review at the time of the baseline inspection. DOE has since provided information on the WWIS and the Agency is currently reviewing this information and will provide the results of its evaluation separately.
The Agency's approval letter and final inspection report can be found below, in Adobe .pdf format:
- INL-CCP RH Approval Letter (PDF) (3 pp, 2.59MB)
- INL-CCP RH 6.06-8, Final Inspection Report (PDF) (130 pp, 664.56K)
All documents pertaining to this action can also be found in the Agency’s electronic docket, which can be found on the Federal Docket Management System (FDMS) website, linked below:
Once you are on the main page, conduct an advanced docket search of an Environmental Protection Agency docket with the following ID:
- EPA-HQ-OAR-2006-0881
WIPP INSPECTIONS TABLES
Below is a current listing of DOE’s waste generator sites and their waste characterization approval status in relation to WIPP. These tables will be updated as soon as new information is available, so please check back regularly.
| TRU Site | U.S. State | Baseline Inspection Status | EPA Approval Date | Last/Next CH Inspection (including Tier 1) | Shipping Status |
|---|---|---|---|---|---|
| AMWTP* | Idaho | Conducted March 2006 | October 2006 | March 2006 | On-going |
| ANL-E-CCP* | Illinois | N/A | December 2003 | February 2003 | Complete |
| Hanford-CCP* | Washington | April 2010 | December 2010 | April 2011 | On-going |
| INL-CCP* | Idaho | Complete | October 2005 | November 2010 | On-going |
| LANL-CCP* | New Mexico | Conducted May 2006 | September 2005 | May 2010 | On-going |
| LLNL-CCP* | California | N/A | August 2004 | May 2004 | Complete |
| NTS-CCP* | Nevada | N/A | December 2002 | September 2003 | Complete |
| ORNL* | Tennessee | Conducted November 2007 | August 2008 | February 2010 | N/A |
| RFETS* | Colorado | N/A | July 2004 | March 2004 | Complete |
| SRS-CCP* | South Carolina | Complete | July 2006 | February 2011 | On-going |
| TRU Site | U.S. | EPA Approval Date | Last/Next RH Inspection |
|---|---|---|---|
| ANL-E-CCP* | Illinois | January 2007 | November 2010 |
| BAPL-CCP* | Pennsylvania | Anticipated July 2011 | May 2011 |
| GE-Vallecitos-CCP* | California | August 2009 | December 2008 |
| INL-CCP* | Idaho | January 2007 | March 2011 |
| LANL-CCP* | New Mexico | February 2008 | May 2007 (Currently not active) |
| ORNL-CCP* | Tennessee | February 2009 | April 2010 |
| SRS-BCL-CCP* | South Carolina | August 2008 | June 2011 |
| SNL-CCP* | New Mexico | Anticipated September 2011 | June 2011 |
*site has a current, EPA-approved quality assurance (QA) program as well
- CCP – Central Characterization Project
- AMWTP – Advanced Mixed Waste Treatment Project, Idaho Falls, ID
- ANL-E – Argonne National Laboratory-East, Argonne, IL
- BAPL - Bettis Atomic Power Laboratory, West Mifflin, PA
- Hanford Site, Hanford, WA
- INL – Idaho National Laboratory, Idaho Falls, ID
- LANL – Los Alamos National Laboratory, Los Alamos, NM
- LLNL – Lawrence Livermore National Laboratory, Livermore, CA
- NTS – Nevada Test Site, Las Vegas, NV
- ORNL – Oak Ridge National Laboratory, Oak Ridge, TN
- RFETS – Rocky Flats National Laboratory, Denver, CO
- SNL - Sandia National Laboratories, Albuquerque, NM
- SRS – Savannah River Site, Savannah, SC
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)