Jump to main content.


Palmerton Zinc

OU 4 STATUS REPORT
MARCH 15, 1999

This is the March status report for the Palmerton Zinc Superfund Site, Operable Unit 4 (Groundwater). This report summarizes groundwater activities that have taken place at the Site since February 15, 1998.

The results of the groundwater samples collected from existing on-site monitoring wells on December 8 and 9, 1998 have been validated by an EPA contractor. An evaluation of this newly collected data and pre-existing data from the on-site monitoring wells collected by Horsehead Resource Development Company Inc. has been completed. The results of this evaluation will be presented to the Joint Groundwater Water Committee on April 15, 1999.

Region 3 | Mid-Atlantic Cleanup | Mid-Atlantic Superfund |EPA Home | EPA Superfund Homepage


Local Navigation


Jump to main content.