Pacific Southwest, Region 9
Serving: Arizona, California, Hawaii, Nevada, Pacific Islands, 147 Tribes
Bureau of Land Management
The Bureau of Land Management (BLM)
, an agency within the U.S. Department of the Interior, administers 261 million surface acres of America's public lands, located primarily in 12 Western States. BLM manages a wide variety of resources and uses, including energy and minerals; timber; forage; wild horse and burro populations; fish and wildlife habitat; wilderness areas; archaeological, paleontological, and historical sites; and other natural heritage values. For additional information on Region 9's review of BLM projects, contact Carol Sachs at (415) 972-3860 or sachs.carol@epa.gov.
You will need Adobe Reader to view some of the files on this page. See EPA's PDF page to learn more about PDF, and for a link to the free Adobe Reader.
- Alturas Field Office Resource Management Plan and Implementation, DEIS (PDF) 07/27/2006 (6 pp, 44K)
Alturas, Eagle Lake, Surprise Field Office Resource Management Plans, FEIS (PDF) 07/13/2007 (2 pp, 21K)
One FEIS letter was sent to the BLM to cover three projects. - Amargosa Farm Road Solar Energy Project, NOI (PDF) 01/27/2010 (13 pp, 157K)
Amargosa Farm Road Solar Energy Project, DEIS (PDF) 05/17/2010 (19 pp, 169K)
Amargosa Farm Road Solar Energy Project, FEIS (PDF) 11/10/2010 (6 pp, 67K) - Aqua Fria National Monument, DEIS (PDF) 04/04/2006 (10 pp, 53K)
Aqua Fria National Monument, FEIS (PDF) 09/08/2008 (2 pp, 23K) - Arizona Restoration Design Energy Project, NOI (PDF) 03/12/2010 (23 pp, 272K)
- Arizona Strip Office Resource Management Plan, DEIS (PDF) 01/30/2006 (6 pp, 36K)
No formal letter was sent to the preparing agency on the FEIS. - Bakersfield Draft Resource Management Plan, DEIS (PDF) 12/09/2011 (12 pp, 141K)
- Bald Mountain Mine North Operations Area Project, DEIS (PDF) 03/23/2009 (13 pp, 149K)
Bald Mountain Mine North Operations Area Project, FEIS (PDF) 12/11/2009 (9 pp, 117K) - Barrick-Betze, Development of New Facilities and Expansion of Existing Open Pit Gold Mining, DSEIS (PDF) 10/02/2008 (3 pp, 28K)
Barrick-Betze, Development of New Facilities and Expansion of Existing Open Pit Gold Mining, FSEIS (PDF) 04/27/2009 (2 pp, 17K) - Black Mesa Project, DEIS (PDF) 02/06/2007 (4 pp, 24K)
Black Mesa Project, FEIS (PDF) 12/05/2008 (2 pp, 18K) - Calico Solar Project, originally SES Solar One Project, NOI (PDF) 07/07/2009 (10 pp, 116K)
Between the Notice of Intent and the Draft EIS, "SES Solar One" project became "Calico Solar Project"
Calico Solar Project, DEIS (PDF) 07/12/2010 (13 pp, 134K)
Calico Solar Project Cover Letter to Jim Abbott (PDF) 07/12/2010 (2 pp, 94K)
Calico Solar Project, FEIS (PDF) 09/07/2010 (6 pp, 122K) - California Coastal National Monument, DEIS (PDF) 10/22/2004 (3 pp, 21K)
No formal comment letter was sent to the preparing agency for the FEIS. - Carrizo Plain National Monument Resource Management Plan, DEIS (PDF) 04/09/2009 (4 pp, 24K)
Carrizo Plain National Monument Proposed Resource Management Plan, FEIS (PDF) 12/10/2009 (1 pg, 28K) - Chevron Energy Solutions/Solar Millennium Blythe Solar Power Project, NOI (PDF) 12/11/2009 (14 pp, 126K)
Chevron Energy Solutions/Solar Millennium Blythe Solar Power Project, DEIS (PDF) 07/12/2010 (11 pp, 117K)
Chevron Energy Solutions/Solar Millennium Blythe Solar Power Project, FEIS (PDF) 09/20/2010 (3 pp, 103K)
Because the issues with both the Solar Millennium Blythe Solar Project and the Solar Millennium Palen Solar Power Project were very similar, one letter was written to cover both projects.
Cover Letter to Jim Abbott (PDF) (2 pp, 104K) - Chevron Energy Solutions/Solar Millennium Palen Solar Power Project, NOI (PDF) 12/11/2009 (14 pp, 134K)
Chevron Energy Solutions/Solar Millennium Palen Solar Power Project, DEIS (PDF) 07/12/2010 (11 pp, 117K)
Chevron Energy Solutions/Solar Millennium Palen Solar Power Project, FEIS (PDF) 06/13/2011 (5 pp, 118K)
Because the issues with both the Solar Millennium Blythe Solar Project and the Solar Millennium Palen Solar Power Project were very simlier, one letter was written to cover both projects.
Cover Letter to Jim Abbott PDF) (2 pp, 104K) - China Mountain Wind Project, NOI (PDF) 01/12/2008 (6 pp, 73K)
China Mountain Wind Project, DEIS (PDF) 07/11/2011 (14 pp, 300K)
This project has components in both Idaho and Nevada and these letters were written by Environmental Protection Agency, Region 10. - Clear Creek Management Area, DEIS (PDF) 03/03/2010 (5 pp, 178K)
Clear Creek Management Area, FEIS (PDF) 11/08/2005 (8 pp, 26K) - Coeur Rochester Mine Expansion Project Preliminary Environmental Assessment (PDF) 08/24/2010 (8 pp, 206K)
- Cortez Hills Expansion Project, DEIS (PDF) 11/21/2007 (4 pp, 25K)
Cortez Hills Expansion Project, FEIS (PDF) 10/31/2008 (2 pp, 17K)
Cortez Hills Expansion Project, SDEIS, (PDF) 10/01/2010 (4 pp, 337K)
Cortez Hills Expansion Project, SFEIS, (PDF) 05/09/2011 (1 pg, 101K) - Crescent Dunes Solar Energy Project, NOI (PDF) 12/17/2009 (14 pp, 132K)
- Daggett Ridge Wind Farm, NOI (PDF) 01/17/2009 (11 pp, 122K)
- Desert Southwest Transmission Line Project, FEIS (PDF) 01/18/2006 (1 pg, 18K)
Desert Southwest Transmission Line Project, DEIS/DEIR (PDF) 01/12/2004 (5 pp, 23K) - Devers-Palo Verde No. 2, DEIS (PDF) 08/17/2006 (4 pp, 26K)
Devers-Palo Verde No. 2, FEIS (PDF) 12/04/2006 (2 pp, 18K) - Eagle Lake Field Office Resource Management Plans, DEIS (PDF) 07/27/2006 (4 pp, 28K)
Alturas, Eagle Lake, Surprise Field Office Resource Management Plans, FEIS (PDF) 07/13/2007 (2 pp, 21K)
One FEIS letter was sent to the BLM to cover three projects. - Eastern San Diego County Resource Management Plan, DEIS (PDF) 05/23/2007 (5 pp, 30K)
No formal comment letter was sent to the preparing agency for the FEIS. - Ely District Resource Management Plan, DEIS (PDF) 11/22/2005 (1 pg, 62K)
No formal letter was sent to the Bureau of Land Management on the FEIS. - Ely Energy Center, Transmission Line Components, DEIS (PDF) 04/03/2009 (13 pp, 55K)
This project is now called 'One Nevada Transmission Line.' - Emigrant Mine Project, RDEIS (PDF) 03/23/2009 (23 pp, 270K)
Emigrant Mine Project, FEIS (PDF) 01/21/2011 (7 pp, 108K) - First Solar Desert Sunlight Solar Farm Project, NOI (PDF) 01/27/2010 (13 pp, 158K)
First Solar Desert Sunlight Solar Farm Project, DEIS (PDF) 11/23/2010 (17 pp, 175K)
First Solar Desert Sunlight Solar Farm Project, FEIS (PDF) 05/12/2011 (6 pp, 121K) - Genesis Mine Project, Elko County, Nevada, DEIS (PDF) 08/06/2010 (17 pp, 195K)
Genesis Mine Project, Elko County, Nevada, FEIS (PDF) 05/16/2011 (2 pp, 67K) - Geothermal Leasing for Truckhaven, FEIS (PDF) 02/22/2008 (2 pp, 26K)
Geothermal Leasing for Truckhaven, DEIS (PDF) 04/30/2007 (11 pp, 60K) - Granite Mountain LLC Wind Farm, San Bernardino County, California, NOI (PDF) 01/14/2008 (12 pp, 171K)
Granite Mountain Wind Energy Project and Amendment to the California Desert Conservation Plan, DEIS (PDF) 07/12/2010 (14 pp, 171K) - Hycroft Mine Expansion Project, DEIS (PDF) 03/26/2012 (16 pp, 200K)
- Hyder Valley Solar Energy Project, NOI (PDF) 06/21/2010 (15 pp, 177K)
- Imperial Sand Dunes Draft Recreation Area Management Plan, DEIS (PDF) 07/22/2010, (5 pp, 91K)
- Imperial Valley Solar Project (formerly known as SES Solar Two), NOI (PDF) 11/14/2008 (10 pp, 113K)
Imperial Valley Solar Project (formerly known as SES Solar Two), FEIS (PDF) 08/30/2010 (8 pp, 159K)
Imperial Valley Solar Project (formerly known as SES Solar Two), DEIS (PDF) 05/27/2010 (27 pp, 718K)
- Ironwood Forest National Monument, Resource Management Plan, DEIS (PDF) 05/23/2007 (7 pp, 50K)
Ironwood Forest National Monument, Resource Management Plan, FEIS (PDF) 10/17/2011 (2 pp, 54K) - Ivanpah Solar Electric Generating System, NOI (PDF) 01/16/2008 (9 pp, 100K)
Ivanpah Solar Electric Generating System, DEIS (PDF) 02/11/2010 (19 pp, 290K)
Ivanpah Solar Electric Generating System, SDEIS (PDF) 07/03/2010 (6 pp, 92K)
Ivanpah Solar Electric Generating System, FEIS (PDF) 09/03/2010 (7 pp, 150K) - Kane Springs Valley Groundwater Development Project, DEIS (PDF) 08/20/2007 (8 pp, 46K)
Kane Springs Valley Groundwater Development Project, FEIS (PDF) 03/07/2008 (2 pp, 20K) - Lake Havasu Field Office Proposed Resource Management Plan, FEIS (PDF) 10/18/2006 (1 pg, 17K)
Lake Havasu Field Office Proposed Resource Management Plan, DEIS (PDF) 12/27/2005 (3 pp, 23K) - Lathrop Wells Solar Facility, Amargosa Valley, NOI (PDF) 09/13/2010 (15 pp, 140K)
- Leeville Project Cumulative Effects, DSEIS (PDF) 11/09/2007 (8 pp, 134K)
Leeville Project Cumulative Effects, FSEIS (PDF) 08/02/2010 (5 pp, 182K) - Lincoln County Land Act Groundwater Development and Utility Right-of-Way Project, DEIS (PDF) 07/18/2008 (9 pp, 53K)
Lincoln County Land Act Groundwater Development and Utility Right-of-Way Project, FEIS (PDF) 05/29/2009 (2 pp, 19K) - Lower Sonoran and Sonoran Desert National Monument Draft Resource Management Plan, DEIS (PDF) 11/22/2011 (5 pp, 79K)
- Lucerne Valley Solar Project, NOI (PDF) 08/04/2009 (12 pp, 123K)
Lucerne Valley Solar Project, DEIS (PDF) 05/20/2010 (13 pp, 217K)
Lucerne Valley Solar Project, FEIS (PDF) 09/13/2010 (3 pp, 77K) - Mohave County Wind Farm Project, Mohave County, Arizona, NOI (PDF) 01/04/2010 (12 pp, 121K)
- Mount Hope Project, Eureka County, DEIS (PDF) 03/28/2012 (20 pp, 196K)
- Mountain View IV Wind Energy Project, DEIS (PDF) 04/05/2007 (5 pp, 35K)
Mountain View IV Wind Energy Project, FEIS (PDF) 11/21/2008 (1 pg, 18K) - New Comstock Wind Energy Project, Carson City, Lyon, Storey, & Washoe counties, NV, NOI (PDF) 12/17/2008 (7 pp, 108K)
- Newmont Gold Mining South Operations Area Project, SDEIS (PDF) 11/09/2007 (9 pp, 453K)
Newmont Gold Mining South Operations Area Project, SFEIS (PDF) 08/02/2010 (6 pp, 323K) - NextEra Energy Resources Genesis Solar Energy Project, NOI (PDF) 11/30/2009 (14 pp, 127K)
NextEra Energy Resources Genesis Solar Energy Project, DEIS (PDF) 07/12/2010 (20 pp, 172K)
Cover Letter to Jim Abbott (PDF) (2 pp, 104K)
NextEra Energy Resources Genesis Solar Energy Project, FEIS (PDF) 09/27/2010 (3 pp, 79K) - Northern Arizona Proposed Withdrawel Project, DEIS (PDF) 05/02/2011 (2 pp, 58K)
- North Valleys Right-of-Way, DEIS (PDF) 07/26/2005 (11 pp, 46K)
North Valleys Right-of-Way, FEIS (PDF) 12/23/2005 (4 pp, 23K) - Ocotillo Wind Energy Facility, DEIS (PDF) 10/06/2011 (12 pp, 200K)
Ocotillo Wind Energy Facility, FEIS (PDF) 04/09/2012 (3 pp, 100K) - One Nevada Transmission Line Project, SDEIS (PDF) 12/10/2009 (3 pp, 64K)
No letter was sent to the preparing agency on One Nevada Transmission Line Project FEIS.
One Nevada Transmission Line was originally a component of the Ely Energy Center and the review letters for this project are under this name. - Phoenix Copper Leach Project, DEIS (PDF) 01/19/2012 (9 pp, 168K)
- Quartzsite Solar Energy Project and Resource Management Plan Amendment, DEIS (PDF) 02/10/2012 (12 pp, 201K)
- Ridgecrest Solar Power Project, NOI (PDF) 11/30/2009 (13 pp, 125K)
Ridgecrest Solar Power Project, DEIS (PDF) 07/12/2010 (11 pp, 121K)
Cover Letter to Jim Abbot (PDF) (2 pp, 79K) - Round Mountain Expansion Project, DEIS (PDF) 09/14/2009 (7 pp, 101K)
Round Mountain Expansion Project, FEIS (PDF) 05/21/2010 (3 pp, 76K) - Salt Wells Geothermal Energy Projects, DEIS (PDF) 03/28/2011 (19 pp, 505K)
Salt Wells Geothermal Energy Projects, FEIS (PDF) 08/22/2011 (2 pp, 100K) - Santa Ana River Wash Land Exchange, South Coast Resource Management Plan Amendment, DEIS (PDF) 10/21/2009 (5 pp, 71K)
- Searchlight Wind Energy Project, Clark County, Nevada, NOI (PDF) 12/17/2008 (7 pp, 108K)
Searchlight Wind Energy Project, Clark County, Nevada, DEIS (PDF) 04/18/2012 (12 pp, 150K) - Sheep Complex, Big Springs and Owyhee Grazing Allotments Sensitive Bird Species, DEIS (PDF) 01/24/2006 (6 pp, 36K)
Sheep Complex, Big Springs and Owyhee Grazing Allotments Sensitive Bird Species, FEIS (PDF) 06/21/2006 (2 pp, 22K) - Sierra Resources Management Plan, DEIS (PDF) 12/13/2006 (6 pp, 38K)
Sierra Resources Management Plan, FEIS (PDF) 07/02/2007 (7 pp, 42K) - Silver State North Solar Project and Silver State South Solar Project, NOI (PDF) 07/30/2009 (12 pp, 123K)
Silver State Solar Energy Project, DEIS (PDF) 06/02/2010 (17 pp, 174K)
Silver State Solar Energy Project, FEIS (PDF) 10/08/2010 (7 pp, 95K) - Sloan Hills Competitive Mineral Material Sales, DEIS (PDF) 12/01/2011 (8 pp, 110K)
- Solar Energy Development in Six Southwestern States (AZ, CA, CO, NM, NV, UT), PDEIS (PDF) 05/02/2011 (38 pp, 249K)
Solar Energy Development in Six Southwestern States (AZ, CA, CO, NM, NV, UT), SPDEIS (PDF) 01/27/2012 (13 pp, 247K) - Sonoran Solar Energy Project, NOI (PDF) 08/28/2009 (14 pp, 169K)
Sonoran Solar Energy Project, DEIS (PDF) 05/25/2010 (10 pp, 123K)
Sonoran Solar Energy Project, FEIS (PDF) 11/22/2011 (2 pp, 63K) - South Coast Resource Management Plan Amendment, DEIS (PDF) 12/19/2011 (6 pp, 71K)
- Southern California Edison's Eldorado-Ivanpah Transmission Line Project, DEIS (PDF) 06/21/2010 (6 pp, 128K)
Southern California Edison's Eldorado-Ivanpah Transmission Line Project, FEIS (PDF) 01/19/2011 (2 pp. 58K)
- Southern Diablo Mountain Range and Central Coast, DEIS (PDF) 01/11/2006 (5 pp, 42K)
Southern Diablo Mountain Range and Central Coast of California Resource Management Plan, FEIS (PDF) 07/27/2006 (3 pp, 25K) - Sunrise Powerlink Project and Proposed Land Use Amendment, DEIS (PDF) 04/03/2008 (16 pp, 82K)
Sunrise Powerlink Project and Proposed Land Use Amendment, SDEIS (PDF) 08/25/2008 (2 pp, 22K)
Sunrise Powerlink Project and Proposed Land Use Amendment, FEIR/FEIS (PDF) 11/10/2008 (2 pp, 23K) - Surprise Field Office Resource Management Plan, DEIS (PDF) 07/27/2006 (5 pp, 34K)
Alturas, Eagle Lake, Surprise Field Office Resource Management Plans, FEIS (PDF) 07/13/2007 (2 pp, 21K)
One FEIS letter was sent to the BLM to cover three projects. - Tonopah Solar Energy, LLC Crescent Dunes Solar Energy Proposed Project, Nye Co., NV, NOI (PDF) 12/17/2009 (14 pp, 169K)
Tonopah Solar Energy, LLC Crescent Dunes Solar Energy Project, DEIS (PDF) 10/18/2010 (5 pp, 80K)
Tonopah Solar Energy, LLC Crescent Dunes Solar Energy Project, FEIS (PDF) 12/15/2010 (2 pp, 60K) - Toquop Energy Project, DEIS (PDF) 12/14/2007 (17 pp, 87K)
No formal comment letter was sent to the Bureau of Land Management on the FEIS - Transmission Agency of Northern California (TANK) Transmission Project, NOI (PDF) 05/29/2009 (9 pp, 113K)
- Truckhaven Geothermal Leasing Area, DEIS (PDF) 04/30/2007 (11 pp, 141K)
Truckhaven Geothermal Leasing Area, FEIS (PDF) 02/22/2008 (2 pp, 17K) - Tule Wind and East County Substation Project, NOI (PDF) 01/28/2010 (12 pp, 124K)
Tule Wind and East County Substation Project, DEIS (PDF) 03/04/2011 (16 pp, 181K)
Tule Wind and East County Substation Project, FEIS (PDF) 11/14/2011 (3 pp, 83K) - Ukiah Field Office Management Plan, DEIS (PDF) 12/30/2005 (2 pp, 21K)
Ukiah Field Office Management Plan, FEIS (PDF) 07/27/2006 (2 pp, 18K) - Upper Las Vegas Wash Conservation Transfer Area, DSEIS (PDF) 04/13/2010 (2 pp, 73K)
No formal comment letter was sent to the Bureau of Land Management on the SFEIS - US Gypsum Modernization Project, DEIS (PDF) 07/14/2006 (5 pp, 86K)
US Gypsum Modernization Project, FEIS (PDF) 04/11/2008 (5 pp, 33K) - Vermilion Cliffs Natl Monument Grand Canyon Parashant Natl Monument, DEIS (PDF) 01/30/2006 (6 pp, 41K)
No formal comment letter was sent to preparing agency on the FEIS. - Walker Ridge Wind Energy Project, NOI (PDF) 09/13/2010 (14 pp, 155K)
- West Chocolate Mountains Renewable Energy Evaluation Area, NOI (PDF) 03/12/2010 (21 pp, 204K)
West Chocolate Mountains Renewable Energy Evaluation Area, DEIS (PDF) 09/28/2011 (22 pp, 300K) - West Fry Wind Energy LLC Wind Farm, San Bernardino County, California, NOI (PDF) 07/07/2008 (7 pp, 109K)
- White Pine Energy Station Project, Nevada, DEIS (PDF) 06/22/2007 (21 pp, 91K)
White Pine Energy Station Project, Nevada, FEIS (PDF) 11/24/2008 (4 pp, 41K) - Winnemucca District Resource Management Plan, DEIS (PDF) 09/20/2010 (4 pp, 84K)
- Yuma Field Office Resource Management Plan, DEIS (PDF) 03/15/2007 (7 pp, 95K)
Yuma Field Office Resource Management Plan, FEIS (PDF) 05/01/2008 (1 pg, 29K)
| Pacific Southwest NewsroomPacific Southwest Programs | Grants & FundingUS-Mexico Border | Media CenterCareers | About EPA Region 9 (Pacific Southwest)A-Z Index |
