PSD Permit Applications
| State | Source Name | Project Description |
Application Received |
Draft Permit |
Final Permit |
Status |
|---|---|---|---|---|---|---|
| AL | Honda Manufacturing of Alabama, LLC | Automobile Manufacturing | 3/20/2007 |
4/17/2007 |
Draft Permit |
|
| AL | Klausner Lumber I, Inc. | Lumber Mill Boilers | 9/13/2007 |
9/13/2007 |
Draft Permit |
|
| AL | Rock-Tenn Mill Company, LLC | Pulp and Paper mill | 1/16/2008 |
1/16/2008 |
3/23/2009 |
Final Permit |
| AL | Bowater, Inc. - Forest Products Division | Sawmill (Lumber) | 3/3/2008 |
3/3/2008 |
4/9/2008 |
Final Permit |
| AL | Hunt Refining Co. | Petroleum Refinery | 5/30/2008 |
5/30/2008 |
5/30/2008 |
Final Permit |
| AL | National Cement Co. of AL Inc. | Cement Manufacturing | 9/29/2008 |
9/29/2008 |
Draft Permit |
|
| AL | IPSCO Steel Inc. | steel mill | 9/29/2008 |
9/29/2008 |
11/14/2008 |
Final Permit |
| AL | Goodyear Tire & Rubber Co. | Tire Manufacturing Plant | 11/3/2008 |
11/3/2008 |
12/29/2008 |
Final Permit |
| AL | Cargill Inc. | Vegetable oil extraction and processing | 2/6/2009 |
2/6/2009 |
Draft Permit |
|
| AL | Hunt Refining Company | Petroleum refinery | 7/20/2009 |
7/20/2009 |
9/28/2009 |
Final Permit |
| AL | Evonik Industries | Organic and Inorganic Chem. Manufacturing F | 8/21/2009 |
Application |
||
| FL | CEMEX Cement, Inc. | Portland Cement Manufacturing | 11/6/2006 |
7/17/2007 |
Draft Permit |
|
| FL | FP&L - Glades Power Park | Coal-Fired Power Plant | 12/27/2006 |
Withdrawn |
||
| FL | Port Dolphin LNG, LLC | LNG Terminal | 3/29/2007 |
Application |
||
| FL | Okeechobee Landfill, Inc. | Landfill | 4/10/2007 |
Application |
||
| FL | Taylor Energy Center | Coal-Fired Power Plant | 5/24/2007 |
Withdrawn |
||
| FL | TECO - Big Bend Station | CO Limit increase (coal boiler) | 5/30/2007 |
11/20/2007 |
Draft Permit |
|
| FL | FP&L - West County Energy Center (unit 3) | Combined Cycle CTs | 12/17/2007 |
4/25/2008 |
7/30/2008 |
Final Permit |
| FL | Buckeye Florida, L.P. - Foley Energy Independence Project | Pulp & Paper Mill | 1/2/2008 |
7/7/2008 |
8/22/2008 |
Final Permit |
| FL | Georgia Pacific Corp. - Palatka | Combination & Recovery Boiler | 1/2/2008 |
8/15/2008 |
9/29/2008 |
Final Permit |
| FL | Tampa Electric Company (Bayside Power Station) | Simple Cycle CTs | 4/3/2008 |
9/10/2008 |
9/26/2008 |
Final Permit |
| FL | Georgia-Pacific Consumer Operations | Pulp & Paper Mill | 4/14/2008 |
6/24/2008 |
7/24/2008 |
Final Permit |
| FL | FMPA-Cane Island Power Park | Combustion Turbines (CC) | 4/14/2008 |
5/8/2008 |
Draft Permit |
|
| FL | JEA - Greenland Energy Center | Combustion Turbines | 4/24/2008 |
12/22/2008 |
3/10/2009 |
Final Permit |
| FL | Progress Energy - Bartow Repowering Project | Combustion Turbines | 5/13/2008 |
9/5/2008 |
10/1/2008 |
Final Permit |
| FL | Shady Hills Generating Station | Combustion Turbines | 5/14/2008 |
12/1/2008 |
1/12/2009 |
Final Permit |
| FL | Progress Energy - Levy Nuclear Plant | Nuclear Power Plant | 6/2/2008 |
12/5/2008 |
2/20/2009 |
Final Permit |
| FL | EnviroFocus Technologies, LLC | Battery Recycling | 8/18/2008 |
8/7/2009 |
9/22/2009 |
Final Permit |
| FL | Florida Municipal Power Agency | Combustion Turbines | 8/26/2008 |
Application |
||
| FL | JEA - Northside Generating Station/ St. John | Natural Gas Igniters | 9/18/2008 |
10/24/2008 |
11/21/2009 |
Application |
| FL | JEA - Greenland Energy Center | Combustion Turbines (SC/CC) | 9/26/2008 |
Application |
||
| FL | Seminole Electric Cooperative, Inc. | Coal-fired boiler (unit 3)-HAPS | 1/7/2009 |
6/12/2009 |
Draft Permit |
|
| FL | Highlands Ethanol, LLC | Ethanol Production | 2/18/2009 |
Application |
||
| FL | Georgia Pacific Corp. - Palatka | Pulp Mill recovery boiler | 5/28/2009 |
9/4/2009 |
Application |
|
| FL | Industrial Power Generating Company, LLC | Landfill Gas to Energy | 6/2/2009 |
Application |
||
| FL | North Florida Lumber, Inc. | Lumber Mill | 6/5/2009 |
8/4/2009 |
9/15/2009 |
Application |
| FL | Florida Power & Light Co. Turkey Point | Nuclear Power Plant | 6/29/2009 |
Application |
||
| FL | Rayonier, Inc. | Pulp Mill | 7/17/2009 |
Application |
||
| FL | Seminole Electric CO-OP - Midulla Generating Station | 8/17/2009 |
Application |
|||
| FL | Pratt & Whitney Rocketdyne | RAM Test Facility | 9/2/2009 |
Application |
||
| GA | Klausner Lumber I, Inc. | Lumber Mill | 5/22/2007 |
Application |
||
| GA | CEMEX Southeast | Portland Cement Plant | 8/7/2007 |
12/23/2008 |
Draft Permit |
|
| GA | Houston American Cement | Portland Cement Plant | 8/7/2007 |
Application |
||
| GA | Huber Engineered Woods, LLC | Oriented Strand Board Mill | 8/27/2007 |
Application |
||
| GA | Procter & Gamble Paper Products | Paper Products | 9/4/2007 |
Application |
||
| GA | Temple-inland - Rome Lumberboard Mill | Lumberboard Mill | 9/14/2007 |
Application |
||
| GA | Yellow Pine Energy Company, LLC | Biomass and Fossile Fuel Boilers | 10/9/2007 |
3/11/2009 |
5/15/2009 |
Final Permit |
| GA | Packaging Corporation of America (PCA) - Valdosta Mill | Kraft Pulp & Paper Mill | 10/15/2007 |
6/19/2008 |
8/8/2008 |
Final Permit |
| GA | Temple-Inland - Rome Linerboard Mill | Linerboard Mill - Recovery Furnace | 11/26/2007 |
6/3/2008 |
7/14/2008 |
Final Permit |
| GA | Gerdau Ameristeel US, Inc. | Steel Mini-Mill | 1/24/2008 |
10/6/2008 |
11/25/2008 |
Final Permit |
| GA | Power4Georgians, LLC | Coal Power Plant | 1/24/2008 |
8/26/2009 |
Draft Permit |
|
| GA | Houston American Cement | Portland Cement Plant | 3/12/2008 |
Application |
||
| GA | IMERYS Clays, Inc. - Sandersville Calcine Plant | Kaolin Mining Facility | 3/20/2008 |
1/21/2009 |
Draft Permit |
|
| GA | CARBO Ceramics, Inc. | Kaolin Clay Processing | 6/24/2008 |
Application |
||
| GA | CARBO Ceramics, Inc. | Kaolin Clay Processing | 6/27/2008 |
Application |
||
| GA | Georgia Power - Plant Dahlberg | Combustion Turbines | 7/29/2008 |
Application |
||
| GA | Georgia-Pacific Corporation - Savannah River Mill | Pulp Mill | 11/20/2008 |
Application |
||
| GA | Langdale Industries, Inc. | Lumber facility | 12/8/2008 |
Application |
||
| GA | Live Oaks Power Plant | Combined Cycle CTs | 12/22/2008 |
Application |
||
| GA | Mitchell Steam-Electric Generating Plant | Coal to Biomass Boiler Conversion | 1/9/2009 |
Application |
||
| GA | Huber Engineered Woods, LLC | Oriented Strand board | 7/9/2009 |
Application |
||
| GA | Savannah Sugar Refinery | Sugar Refinery | 8/14/2009 |
Application |
||
| KY | East Kentucky Power Coop. (J. K. Smith Generating Station) | Combustion Turbines | 10/16/2006 |
Withdrawn |
||
| KY | East Kentucky Power Coop. (J. K. Smith Generating Station) | Coal-fired Boilers (CFB) | 1/26/2007 |
Withdrawn |
||
| KY | Alcan Primary Products Corp. - Sebree Works | Primary Aluminum Production | 9/5/2007 |
Application |
||
| KY | Kentucky Mountain Power, LLC | Coal Fired Boilers | 10/23/2007 |
Withdrawn |
||
| KY | East Kentucky Power Coop. (J. K. Smith Generating Station) | Combustion Turbines | 2/26/2008 |
6/27/2008 |
10/24/2008 |
Final Permit |
| KY | East Kentucky Power Coop.(J. K. Smith Generating Station) | Coal-Fired Boilers | 4/3/2008 |
Application |
||
| KY | Cash Creek Generating Station | Coal to Synthetic Natural Gas | 5/22/2008 |
9/9/2009 |
Draft Permit |
|
| KY | Century Aluminum of Kentucky GP | Aluminum Production | 8/18/2008 |
8/12/2009 |
Draft Permit |
|
| KY | Estill County Energy | Coal-Fired Power Plant | 9/30/2008 |
Application |
||
| KY | Toyota Motor Manufacturing | Automobile Manufacturing | 10/22/2008 |
Application |
||
| KY | Kentucky NewGas | Substitute Natural Gas Production | 12/23/2008 |
Application |
||
| KY | Rio Tinto Alcan - Sebree Works | Primary Aluminum production | 2/23/2009 |
Application |
||
| KY | Dart Container Corp. | Food Service Container Production | 5/29/2009 |
Application |
||
| KY | Kentucky Utilities Co. /E.W. Brown | Electric Genration Plant | 7/9/2009 |
Application |
||
| MS | SeverCorr, LLC | Steel Mini-Mill | 2/26/2007 |
6/25/2007 |
Draft Permit |
|
| MS | Toyota Motor Engineering and Manufacturing, Inc. | Automobile Manufacturing | 3/5/2007 |
5/10/2007 |
Draft Permit |
|
| MS | Leaf River Cellulose, LLC | Lime Kiln | 5/7/2007 |
7/23/2007 |
Draft Permit |
|
| MS | Mississippi Power Co. - Watson Electric Plant | Coal-Fired Boilers | 5/22/2007 |
Application |
||
| MS | Auto Parts Manufacturing Mississippi, Inc. | Auto Parts Production | 11/7/2007 |
11/7/2007 |
Draft Permit |
|
| MS | Mississippi Power Company - Kemper IGCC | IGCC (coal gasification) | 1/8/2008 |
8/15/2008 |
10/14/2008 |
Final Permit |
| MS | Chevron Products - Pascagoula Refinery | Petroleum Refinery | 1/22/2008 |
2/8/2008 |
3/12/2008 |
Final Permit |
| MS | Georgia-Pacific Wood Products | Oriented Strandboard plant | 1/24/2008 |
1/29/2008 |
Draft Permit |
|
| MS | Mississippi Power Co. - Plant Daniel | Coal-Fired Boilers | 1/25/2008 |
8/13/2008 |
10/9/2008 |
Final Permit |
| MS | Leaf River Cellulose, LLC | Pulp and Paper Mill | 2/5/2008 |
3/7/2008 |
4/8/2008 |
Final Permit |
| MS | International Paper, Vicksburg Mill | Combustion Turbines | 2/8/2008 |
3/3/2008 |
4/12/2008 |
Final Permit |
| MS | Nucor Steel Jackson, Inc., (f/k/a Birmingham Southeast) | Steel Mini-Mill | 3/18/2008 |
8/29/2008 |
12/9/2008 |
Final Permit |
| MS | ECO Steel Recycling LLC | Steel Mill | 4/24/2008 |
6/10/2008 |
Draft Permit |
|
| MS | Nissan North America Inc. | Automobile Manufacturing | 5/9/2008 |
5/22/2008 |
Draft Permit |
|
| MS | Shuqualak Lumber Company, Inc, Planer Mill Division | Lumber Mill | 5/16/2008 |
Application |
||
| MS | Chevron Products - Pascagoula Refinery | Petroleum Refinery | 8/22/2008 |
2/4/2009 |
4/14/2009 |
Final Permit |
| MS | Mississippi Phosphates Corp. | Fertilizer Production | 9/29/2008 |
Withdrawn |
||
| MS | Loblolly Industries, LLC | Wood Products | 10/27/2008 |
Application |
||
| MS | Transco Compressor Station 77 | Natural Gas Transmission Station | 1/21/2009 |
4/15/2009 |
5/28/2009 |
Final Permit |
| MS | Georgia-Pacific Wood Products, LLC. | OSB Manufacturing | 3/16/2009 |
Application |
||
| MS | Weyerhaeuser Columbus Cellulose Fibers | Kraft Pupl Mill | 3/19/2009 |
Application |
||
| MS | Chevron Products - Pascagoula Refinery | Petroleum Refinery | 5/5/2009 |
8/19/2009 |
Final Permit |
|
| MS | Choctaw Gas Generation, LLC | 7/15/2009 |
Draft Permit |
|||
| MS | Georgia-Pacific Monticello LLC | Kraft Iinerboard Mill | 8/6/2009 |
10/22/2009 |
Draft Permit |
|
| MS | Mississippi Power Co. Victor J. Daniel Plant | Coal-Fired Boilers | 9/10/2009 |
Application |
||
| MS | Southern Mississippi Electric Power Association- Moselle | SC/CC Combustion Turbines | 10/1/2009 |
Application |
||
| NC | ATC Panels, Inc. | Particleboard dryers | 12/20/2006 |
5/23/2007 |
Draft Permit |
|
| NC | DSM Pharmaceuticals | Drug Mfg. | 11/27/2007 |
11/27/2007 |
1/11/2008 |
Final Permit |
| NC | Wilbara, LLC | Sulfuric Acid Plant | 2/21/2008 |
8/7/2008 |
9/16/2008 |
Final Permit |
| NC | Southern Power - Plant Rowan | 2/22/2008 |
10/17/2008 |
Draft Permit |
||
| NC | Progress Energy Carolinas - Richmond Co. | Combined Cycle CTs | 2/28/2008 |
2/25/2009 |
4/2/2009 |
Final Permit |
| NC | Carolinas Cement Company, LLC | Portland Cement | 3/6/2008 |
9/17/2009 |
Draft Permit |
|
| NC | DAK Americas, LLC | Terephthalic Acid Production | 4/21/2008 |
4/7/2009 |
Draft Permit |
|
| NC | Duke Energy - Dan River Steam Station | Combustion Turbines | 11/15/2008 |
Application |
||
| NC | Nomaco, Inc. Tarboro Plant | Polyethylene Foam Extrusion | 11/28/2008 |
11/28/2008 |
1/27/2009 |
Final Permit |
| NC | North Carolina State University | Energy Savings Project | 2/13/2009 |
8/3/2009 |
9/8/2009 |
Final Permit |
| NC | Cleveland County Generating Facility | Electric Generating Facility | 3/23/2009 |
3/25/2009 |
9/10/2009 |
Final Permit |
| NC | Weyerhaeuser - Plymouth Lumber Mill | Lumber Mill | 3/23/2009 |
Application |
||
| NC | Hertford Renewable Energy, LLC | Biomass power plant | 4/16/2009 |
10/27/2009 |
Draft Permit |
|
| NC | Carolina Stalite Co. Aquadale Plant | Aggregate Manufacturing Facility | 5/12/2009 |
Application |
||
| NC | Sampson County Disposal, LLC | Landfill Gas to Energy | 6/8/2009 |
Application |
||
| NC | Nomaco, Inc. Zebulon Plant | Foam Manufacturing Facility | 8/7/2009 |
8/7/2009 |
8/27/2009 |
Draft Permit |
| NC | Nucor Steel | Steel Mill | 10/14/2009 |
Draft/Proposed Permit |
||
| SC | Michelin N. A. (US 3) | Tire Manufacturing | 9/18/2007 |
9/30/2007 |
Draft Permit |
|
| SC | Nucor Steel | Steel Mini-Mill | 12/17/2007 |
3/25/2008 |
5/5/2008 |
Final Permit |
| SC | Santee Cooper - Lee County Landfill Gas Electric Gen. Facility | Landfill Gas Electric Power Generation | 1/10/2008 |
4/7/2008 |
5/15/2008 |
Final Permit |
| SC | Grant Allendale, LP | Oriented Strand Board | 2/28/2008 |
8/8/2008 |
11/25/2008 |
Final Permit |
| SC | Grant Clarendon, LP | Oriented Strand Board | 2/28/2008 |
1/2/2009 |
Draft Permit |
|
| SC | Ameresco Biomass Congeneration Facility | Biomass-Fired Boilers | 3/8/2008 |
10/6/2008 |
11/14/2008 |
Final Permit |
| SC | Michelin N. A. (US 7) | Tire Manufacturing | 3/18/2008 |
4/15/2008 |
Draft Permit |
|
| SC | Elliott Sawmilling Co. Inc. | Drying Kiln | 6/6/2008 |
2/13/2009 |
4/14/2009 |
Final Permit |
| SC | Nucor Steel | Melt Shop Bag House | 6/23/2008 |
11/24/2008 |
Draft Permit |
|
| SC | GE Greenville Gas Turbines, LLC | CT Test Stands | 11/26/2008 |
7/8/2009 |
9/3/2009 |
Final Permit |
| SC | Michelin N. A. (US 5) | Tire Manufacturing Facility | 2/23/2009 |
4/30/2009 |
6/5/2009 |
Final Permit |
| SC | International Paper - Georgetown Mill | Pulp & Paper Mill | 5/28/2009 |
Application |
||
| SC | AGY, LLC | Manufacturing of Fiberglass Strands | 8/7/2009 |
Application |
||
| SC | Flakeboard America Limited | medium density fiberboard manufacture | 9/25/2009 |
Application |
||
| TN | ThyssenKrupp Waupaca, Inc. - Plant 6 | Iron Foundry | 3/6/2007 |
6/18/2007 |
Draft Permit |
|
| TN | Nucor Steel Memphis, Inc. | Steel Mini-Mill | 3/7/2007 |
3/7/2007 |
Draft Permit |
|
| TN | Goodyear Tire & Rubber Company | Tire Manufacturing | 3/4/2008 |
8/8/2008 |
Draft Permit |
|
| TN | TVA - Lagoon Creek | Combined Cycle CTs | 3/28/2008 |
7/17/2008 |
8/13/2008 |
Final Permit |
| TN | Temple-Inland - New Johnsonville Mill | Pulp & Paper (PM Limit on boiler) | 7/21/2008 |
10/10/2008 |
Draft Permit |
|
| TN | Erachem Comilog, Inc. | Wood-Fired Boiler | 8/4/2008 |
12/23/2008 |
Draft Permit |
|
| TN | Volkswagen Group of America | Automobile Assembly | 8/21/2008 |
8/21/2008 |
10/13/2008 |
Final Permit |
| TN | Packaging Corp of America | Pulp & Paper Mill Units | 12/19/2008 |
12/19/2008 |
2/2/2009 |
Final Permit |
| TN | TVA - Gleason | Combined Cycle Utility | 6/8/2009 |
7/21/2009 |
Draft Permit |
|
* This list does not include applications recieved more than 24 months ago if the pemit has been issued
final.
For information about the contents of this page please contact Katy Forney