Jump to main content.
Technical Documents
2010
2009
- Lower Fox River Remedial Design Volume 1 - 60% Design Report
Top of page
2007
- Design Supplement, Lower Fox River Operable Unit 1, November 2007
- Report Text (PDF) (69pp, 431K)
- Appendices
(PDF) (147pp, 22.3MB)
- Figures
- Fig 1.1 OU1 Final Plan Capping Site Location (PDF) (1pg, 207K)
- Fig 1.2 OU1 Final Plan Capping Sub Areas (PDF) (1pg, 1.8MB)
- Fig 2.1 OU1 Final Plan Capping Infrastructure and Obstructions (PDF) (1pg, 1.2MB)
- Fig 2.2 OU1 Final Plan Capping Pre Project Surficial (PDF) (1pg, 5MB)
- Fig 2.3 OU1 Final Plan Capping Post 2006 Surficial (PDF) (1pg, 2.1MB, 11X17")
- Fig 2.4 OU1 Final Plan Capping PrePCBMax (PDF) (1pg,2.1MB, 11X17")
- Fig 2.5 OU1 Final Plan Capping Post 2006 Max (PDF) (1pg, 2.1MB, 11X17")
- Fig 2.6 OU1 Final Plan Capping Post Project PCB Max (PDF) (1pg, 5.6MB, 11X17")
Fig 4.1 OU1 Final Plan Optimal Remedy (PDF) (1pg, 2.1MB, 11X17")
- Fig 4.2 OU1 Final Plan Capping Dredging Progress (PDF) (1PG., 4.3mb, 11x17")
- Fig 4.3 OU1 Final Plan Optimal Remedy Post 2008 (PDF) (1pg, 4.3MB, 11X17")
- Fig 4.4 OU1 Final Plan Capping PreProject Surficial Cap (PDF) (1pg, 2.1MB, 11X17")
- Fig 4.5 OU1 Final Plan Capping PreProject PCB Max Cap (PDF) (1pg, 3.8, 11X17")
- Fig 4.6 OU1 Final Plan Capping Post Water Depth (PDF) (1pg, 3.8MB, 11X17")
- Fig 4.7 OU1 Final Plan SWAC(PDF) (1pg,5mb, 11X17")
- Concept Paper, Lower Fox River, Operable Unit 1, Optimized Remedy, November 19, 2007 (PDF) (24pp, 122K)
Top of page
2006
Top of page
2003
Top of page
2000
- In August 1999, a demonstration project began at Sediment Management
Unit 56/57 near DePere, Wisconsin. EPA became formally involved in the
oversight of the project in the spring of 2000. More complete information
about the project is available from Wisconsin
DNR
Top of page
Jump to main content.