|
FINAL TMDL Documents
Federal Register Notice: Vol. 73, Num. 158, pages 47596 - 47597 (08/14/2008)
All documents provided below are in PDF. All waterbodies listed are located in the state of Arkansas.
Public comments and EPA responses to the following TMDL files [610KB, 8 pages]
- TMDLs for Chloride, Sulfate, TDS, and Turbidity in selected reaches in Bayou Bartholomew Watershed (08040205-013, 08040205-012U, 08040205-002, 08040205-001, 08040205-007) [2.9MB, 156 pages]
- TMDLs for Zinc and Copper in selected reaches in the Caddo River Basin (08040102-016, 08040102-018, 08040102-019, 08040102-023) [829KB, 79 pages]
- TMDLs for Lead and Turbidity in a reach of the Big Creek – near Sheridan (08040203-904) [611KB, 61 pages]
- TMDLs for Turbidity in selected stream reaches (08040101-048, 08040201-001U, 08040201-001L, 08040204-005) [1.3MB, 134 pages]
Federal Register Notice: Vol. 73, Num. 16, page 4215 (01/24/2008)
All documents provided below are in PDF. All waterbodies listed are located in the state of Arkansas.
TMDLs for Pathogens in Holly Creek and Mine Creek (PDF) (reaches 11140109-013, and 11140109-033) [1.8KB, 57 pages].
These TMDLs have been established and EPA is accepting comments until February 23, 2008. Comments received during the comment period may be incorporated into a revised TMDL.
Federal Register Notice: Vol. 73, Num. 16, pages 4215-4216 (01/24/2008)
All documents provided below are in PDF. All waterbodies listed are located in the state of Arkansas.
TMDLs for Turbidity in seven selected stream (PDF) (08020203-007, 08020203-005, and 08020203-003) [3.1MB, 133 pages]. Final TMDL signed January 14, 2008.
Headquarters
TMDL Documentation
Back to TMDL Home Page |