Pacific Southwest, Region 9
Serving: Arizona, California, Hawaii, Nevada, Pacific Islands, Tribal Nations
Forest Service
Established in 1905, the U.S. Forest Service (USFS)
is an agency of the U.S. Department of Agriculture. The Forest Service manages public lands in national forests and grasslands. These national forests and grasslands encompass 193 million acres of land. The mission of the USFS is to sustain the health, diversity, and productivity of the Nation's forests and grasslands to meet the needs of present and future generations. For additional information on Region 9's review of USFS projects, contact Carol Sachs at (415) 972-3860 or sachs.carol@epa.gov.
You will need Adobe Reader to view some of the files on this page. See EPA's PDF page to learn more about PDF, and for a link to the free Adobe Reader.
- Algoma Vegetation Management Project, Shasta-Trinity National Forest, DEIS (PDF) 09/16/2011 (1 pg, 50K)
No formal comment letter was sent to the preparing agency on the FEIS. - Ansel Adams and John Muir Wilderness Pack Stock, DEIS (PDF) 07/01/2005 (9 pp, 38K)
Ansel Adams and John Muir Wilderness Pack Stock, FEIS (PDF) 01/30/2006 (2 pp, 127K) - Antelope-Pardee 500kV Transmission Project, Angeles National Forest, DEIS (PDF) 10/03/2006 (5 pp, 35K)
No formal comment letter was sent to the preparing agency on the FEIS - Bar T Bar and Anderson Springs Allotment, DEIS (PDF) 01/27/2004 (2 pp, 18K)
- Barren Ridge Renewable Transmission Project, DEIS (PDF) 10/10/2011 (16 pp, 162K)
Barren Ridge Renewable Transmission Project, FEIS (PDF) 09/10/2012 (2 pp, 50K) - Beaverslide Timber Sale and Fuel Treatment Project, DEIS (PDF) 07/31/2009 (6 pp, 72K)
Beaverslide Timber Sale and Fuel Treatment Project, FEIS (PDF) 12/14/2009 (2 pp, 53K)
Beaverslide Timber Sale and Fuel Treatment Project, SDEIS (PDF) 07/20/2010 (1 pg, 35K)
Beaverslide Timber Sale and Fuel Treatment Project, FSEIS (PDF) 11/03/2010 (1 pg, 48K) - Big Grizzly Forest Health and Fuels Reduction Project, DEIS (PDF) 03/18/2010 (4 pp, 103K)
Big Grizzly Forest Health and Fuels Reduction Project, FEIS (PDF) 07/20/2010 (1 pg, 70K) - Big Pony Project, DEIS (PDF) 10/25/2010 (2 pp, 62K)
Big Pony Project, FEIS (PDF) 06/24/2011 (1 pg, 60K) - Bill Williams Mountain Restoration Project, DEIS (PDF) 08/23/2012 (2 pp, 32K)
- Black River Land Exchange, DEIS (PDF) 07/09/2008 (2 pp, 20K)
Black River Land Exchange, FEIS (PDF) 11/02/2009 (2 pp, 17K) - Bridgeport Travel Management Plan, Humboldt-Toiyabe National Forest, DEIS (PDF) 09/14/2009 (6 pp, 92K)
Bridgeport Travel Management Plan, Humboldt-Toiyabe National Forest, FEIS (PDF) 04/26/2010 (2 pp, 67K) -
Brown Fuels Reduction, DEIS (PDF) 06/10/2005 (2 pp, 19K)
Brown's Fuel Reduction Project, RDEIS (PDF) 09/19/2007 (1 pg, 17K)
Brown Fuels Reduction, FEIS (PDF) 07/14/2006 (2 pp, 19K)
No formal comment letter was sent to the preparing agency on the RFEIS. - Concow Hazardous Fuel Reduction Project, DEIS (PDF) 10/01/2010 (4 pp, 96K)
Concow Hazardous Fuel Reduction Project, FEIS (PDF) 02/11/2011 (2 pp, 55K) - Coconino National Forest Motorized Travel Plan, DEIS (PDF) 05/17/2010 (4 pp, 128K)
Coconino National Forest Motorized Travel Plan, FEIS (PDF) 12/12/2011 (1 pg, 37K) - Creeks Forest Health Recovery, DEIS and details (PDF) 07/11/2005 (5 pp, 24K)
- Creeks II Forest Restoration Project, Lassen National Forest, DEIS (PDF) 01/17/2012 (5 pp, 100K)
Creeks II Forest Restoration Project, Lassen National Forest, FEIS (PDF) 08/07/2012 (1 pp, 25K) - Deep Lake Allotment, DEIS (PDF) 04/21/2006 (2 pp, 18K)
No formal comment letter was sent to United States Forest Service on the FEIS - Diamond Vegetation Management Project, Plumas National Forest, DEIS (PDF) 09/20/2006 (5 pp, 93K)
- Dinky Lakes Wilderness - Commercial Pack Stock Permit Reissuance, DEIS (PDF) 05/25/2006 (7 pp, 36K)
No formal comment letter was sent to the preparing agency on the FEIS. - Eddy Gulch Late-Successional Reserve Fuels and Habitat Protection Project, DEIS (PDF) 09/08/2009 (4 pp, 77K)
Eddy Gulch Late-Successional Reserve Fuels and Habitat Protection Project, FEIS (PDF) 02/16/2010 (1 pg, 38K) - Eldorado National Forest Public Wheeled Motorized Travel Management Plan, DEIS (PDF) 10/18/2008 (9 pp, 47K)
Eldorado National Forest Public Wheeled Motorized Travel Management Plan, FEIS (PDF) 05/05/2008 (2 pp, 20K)
Eldorado National Forest Public Wheeled Motorized Travel Management Plan, SDEIS (PDF) 03/26/2013 (3 pp, 50K) - Ely Westside Rangeland Project, DEIS (PDF) 08/11/2011 (3 pp, 100K)
Ely Westside Rangeland Project, FEIS (PDF) 11/15/2011 (1 pg, 25K) - Empire Vegetation, Sierra Nevada, DEIS (PDF) 07/07/2005 (6 pp, 35K)
Empire Vegetation, Sierra Nevada, FEIS (PDF) 09/15/2005 (2 pp, 20K)
Empire Vegetation, Sierra Nevada, First DSEIS (PDF) 03/02/2006 (2 pp, 60K)
Empire Vegetation, Sierra Nevada, Second DSEIS (PDF) 04/02/2007 (2 pp, 70K)
No comment letter was sent on either the first or the second FSEIS - Freds Fire Restoration Project, El Dorado County, Calif., DEIS (PDF) 10/26/2009 (4 pp, 89K)
Freds Fire Restoration Project, El Dorado County, Calif., FEIS (PDF) 04/12/2010 (1 pg, 57K) - Fish Camp Project, Sierra National Forest, Madera/Mariposa Counties, DEIS (PDF) 03/21/2011 (2 pp, 124K)
Fish Camp Project, Sierra National Forest, Madera/Mariposa Counties, FEIS (PDF) 06/24/2011 (1 pg, 38K) - Freeman Project, Plumas County, Calif., DEIS, (PDF) 07/10/2006 (4 pp, 24K)
Freeman Project, Plumas County, Calif., FEIS (PDF) 11/03/2006 (2 pp, 17K) - Geothermal Leasing, Humboldt-Toiyabe National Forest, DEIS (PDF) 02/13/2012 (9 pp, 186K)
No letter was sent to the Forest Service on the FEIS - Gemmill Thin Project, Shasta-Trinity National Forest, DEIS (PDF) 11/10/2008 (7 pp, 48K)
Gemmill Thin Project, Shasta-Trinity National Forest, FEIS (PDF) 06/01/2009 (2 pp, 72K)
Gemmill Thin Project, Shasta-Trinity National Forest, DSEIS (PDF) 10/25/2010 (2 pp, 65K)
Gemmill Thin Project, Shasta-Trinity National Forest, FSEIS (PDF) 06/02/2011 (1 pg, 23K) - Giant Sequoia National Monument Management Plan, DEIS (PDF) 11/2/2010 (4 pp, 39K)
Giant Sequoia National Monument Management Plan, FEIS (PDF) 10/09/2012 (1 pp, 22K) - Great Basin Creek South Rangeland Management Plan, Humboldt-Toiyabe National Forest, DEIS (PDF) 03/05/2007 (5 pp, 35K)
Great Basin Creek South Rangeland Management Plan, Humboldt-Toiyabe National Forest, FEIS (PDF) 11/13/2007 (2 pp, 18K) - Greys Mountain Ecological Restoration, DEIS (PDF) 01/30/2012 (1 pg, 40K)
No formal comment letter was sent to the preparing agency on the FEIS - Harris Vegetation Management Project, Shasta-Trinity National Forest, DEIS (PDF) 03/26/2012 (2 pp, 100K)
- Hatchery and Stocking Program, DEIS (PDF) 12/02/2009 (6 pp, 84K)
Hatchery and Stocking Program, FEIS (PDF) 03/22/2010 (2 pp, 60K) - Heavenly Valley Ski Area Master Plan, DEIS (PDF) 07/26/2006 (4 pp, 32K)
Heavenly Valley Ski Area Master Plan, FEIS (PDF) 02/26/2007 (3 pp, 23K) - Herger-Feinstein Quincy Library Group, DEIS (PDF) 07/26/1999 (10 pp, 41K)
Herger-Feinstein Quincy Library Group, SDEIS (PDF) 01/09/2002 (4 pp, 23K) - Hi-Grouse Project, DEIS (PDF) 09/07/2010 (2 pp, 118K)
No letter was sent to the Forest Service on the FEIS. - Horse Heli Project, DEIS (PDF) 02/24/2006 (4 pp, 44K)
No formal comment letter was sent to the Forest Service on the FEIS. - Inyo National Forest Commercial Pack Station and Pack Stock Outfitter & Guide Permit Issuance, DEIS (PDF) 05/16/2006 (5 pp, 30K)
Inyo National Forest Commercial Pack Station and Pack Stock Outfitter & Guide Permit Issuance, FEIS (PDF) 03/07/2007 (2 pp, 18K) - Inyo National Forest Public Motorized Travel Management, DEIS (PDF) 03/31/2009 (8 pp, 38K)
Inyo National Forest Public Motorized Travel Management, FEIS (PDF) 10/02/2009 (3 pp, 73K) - Jacob Ryan, DEIS(PDF) 05/05/2006 (6 pp, 51K)
- Jarbidge Canyon, DEIS (PDF) 07/07/2003 (6 pp, 36K)
Jarbidge Canyon, FEIS (PDF) 05/31/2005 (3 pp, 21K)
- Jarbidge Ranger District Rangeland Management, FEIS (PDF) 01/25/2010 (2 pp, 33K)
Jarbidge Ranger District Rangeland Management, DEIS (PDF) 08/16/2006 (5 pp, 33K)
Jarbidge Ranger District Rangeland Management, RDEIS (PDF) 09/08/2009 (4 pp, 114K) - Johnny O'Neil Late Successional Reserve and Fuel Load Reduction Project, DEIS (PDF) 10/28/2011 (6 pp, 135K)
Johnny O'Neil Late Successional Reserve and Fuel Load Reduction Project, FEIS (PDF) 8/15/2012 (1 pp, 22K) - Kaibab National Forest Land and Resource Management Plan, DEIS (PDF) 07/18/2012 (2pp, 26K)
- Keddie Ridge Hazardous Fuels Reduction Project, DEIS (PDF) 03/18/2011 (2 pp, 77K)
Keddie Ridge Hazardous Fuels Reduction Project, FEIS (PDF) 09/16/2011 (1 pg, 50K) - Kelsey Peak Timber Sale and Fuelbreak Project, DEIS (PDF) 06/09/2010 (2 pp, 73K)
- Kings River Experimental Watershed Forest Health and Research Project, DEIS (PDF) 02/07/2011 (4 pp, 84K)
Kings River Experimental Watershed Forest Health and Research Project, FEIS (PDF) 05/10/2011 (2 pp, 41K) - Kings River Project, DEIS (PDF) 04/07/2006 (8 pp, 63K)
No formal comment letter was sent to the U.S. Forest Service on the FEIS
Kings River Project, DSEIS (PDF) 10/31/2008 (6 pp, 37K) - Kirkwood Resort Mountain Master Development Plan 2003, DEIS (PDF) 03/21/2006 (10 pp, 60K)
Kirkwood Resort Mountain Master Development Plan 2003, FEIS (PDF) 12/17/2007 (2 pp, 18K) - Kirkwood Meadows Power Line Reliability Project, DEIS (PDF) 05/31/2011 (2 pp, 65K)
Kirkwood Meadows Power Line Reliability Project, FEIS (PDF) 04/16/2012 (2 pp, 65K) - Klamath National Forest Motorized Travel Management, FEIS. (PDF) 03/01/2010 (2 pp, 89K)
Klamath National Forest Motorized Travel Management, DEIS (PDF) 07/29/2009 (11 pp, 58K) - Lake Davis Pike Eradication Project, FEIS (PDF) 03/01/2007 (2 pp, 28K)
Lake Davis Pike Eradication Project, DEIS (PDF) 10/25/2006 (2 pp, 25K) - Lake Tahoe Basin Management Unit Draft Revised Land and Resource Management Plan, DIES (PDF) (9 pp, 76K)
- Lassen National Forest Motorized Travel Management Plan, FEIS (PDF) 01/15/2010 (2 pp, 69K)
Lassen National Forest Motorized Travel Management Plan, DEIS (PDF) 07/29/2009 (7 pp, 49K) - Little Doe and Low Gulch Timber Sales, Six Rivers National Forest, DEIS (PDF) 01/18/2007 (5 pp, 32K)
Little Doe and Low Gulch Timber Sales, Six Rivers National Forest, FEIS (PDF) 09/27/2007 (1 pg, 19K) - Los Padres National Forest Oil and Gas Leasing comments on DEIS (PDF) 04/19/2002 (10 pp, 35K)
Los Padres National Forest Oil and Gas Leasing, FEIS (PDF) 10/24/2005 (4 pp, 24K) - Lower Trinity and Mad River Motorized Travel Management, DEIS (PDF) 08/03/2009 (7 pp, 155K)
Lower Trinity and Mad River Motorized Travel Management, FEIS (PDF) 03/18/2010 (2 pp, 78K) - Martin Basin Rangeland, DEIS (PDF) 04/17/2009 (6 pp, 31K)
Martin Basin Rangeland, FEIS (PDF) 01/11/2010 (2 pp, 53K)
No letter was sent to the Fish and Wildlife Service on either the Draft Supplement or the Final Supplement EIS - Middle Kyle Complex, Spring Mountains National Recreation Area, Humboldt-Toiyabe National Forest, DEIS (PDF) 11/16/2009 (14 pp, 146K)
Middle Kyle Complex, Spring Mountains National Recreation Area, Humboldt-Toiyabe National Forest, FEIS (PDF) 02/09/2010 (2 pp, 50K) - Modoc National Forest Motorized Travel Management Plan, DEIS (PDF) 02/11/2009 (7 pp, 41K)
Modoc National Forest Motorized Travel Management Plan, FEIS (PDF) 01/22/2010 (2 pp, 62K) - Modoc National Forest Noxious Weed Control Project, DEIS (PDF) 02/08/2004 (9 pp, 41K)
Modoc National Forest Noxious Weed Control Project, FEIS (PDF) 01/22/2010 (2 pp, 24K) - Moonlight and Wheeler Fires Recovery and Restoration Project, DEIS (PDF) 08/18/2008 (7 pp, 38K)
Moonlight and Wheeler Fires Recovery and Restoration Project, RDEIS (PDF) 04/06/2009 (10 pp, 41K)
Moonlight and Wheeler Fires Recovery and Restoration Project, RFEIS (PDF) 07/20/2009 (2 pp, 18K) - Moonridge Animal Park, DEIS (PDF) 11/24/2008 (6 pp, 39K)
- Mountain City, Ruby Mountains, and Jarbidge Ranger Districts Combined Travel Management Project, DEIS (PDF) 06/18/2010 (5 pp, 82K)
Mountain City, Ruby Mountains, and Jarbidge Ranger Districts Combined Travel Management Project, FEIS (PDF) 09/28/2011 (2 pp, 57K) - Mt. Ashland Late-Successional Reserve Habitat Restoration and Fuels Reduction Project, DEIS (PDF) 07/26/2007 (4 pp, 23K)
- Mudflow Vegetation Management Project, DEIS (PDF) 04/14/2011 (2 pp, 55K)
No formal comment letter was sent to the Forest Service on the FEIS. - North Fork Eel River Grazing Allotments (PDF) 09/02/2005 (5 pp, 27K)
EPA wrote no comment letter on the FEIS because of Lack of Objections rating at DEIS stage, a more protective alternative is selected in the ROD, and the responses to our comments are adequate. - North 49, DEIS (PDF) 05/25/2006 (4 pp, 25K)
North 49, FEIS (PDF) 06/16/2008 (2 pp, 20K) - On Top Hazardous Fuel Reduction Project, Plumas National Forest, DEIS (PDF) 04/16/2012 (8 pp, 150K)
On Top Hazardous Fuel Reduction Project, Plumas National Forest, FEIS (PDF) 12/06/2012 (2 pp, 100K) - Orleans Community Fuels Reduction and Forest Health Project, DEIS (PDF) 05/13/2008 (4 pp, 84K)
No formal comment letter was sent to the U.S Forest Service on the FEIS - Pettijohn Late-Successional Reserve, DEIS (PDF) 06/07/2011 (1 pg, 74K)
Pettijohn Late-Successional Reserve, FEIS (PDF) 06/12/2012 (1 pg, 45K) - Phoenix Project, DEIS (PDF) 05/08/2006 (4 pp, 25K)
Phoenix Project, RDEIS (PDF) 07/20/2007 (3 pp, 22K)
No formal comment letter was sent to the preparing agency on the FEIS. - Pickett Lake and Padre Canyon, DEIS (PDF) 06/26/2005 (4 pp, 23K)
Pickett Lake and Padre Canyon, FEIS (PDF) 10/12/2005 (2 pp, 19K) - Pilgrim Vegetation Management Project, Shasta-Trinity Nationa Forest FSEIS, (PDF) 02/22/2010 (2 pp, 58K)
Pilgrim Vegetation Management Project, Shasta-Trinity National Forest DEIS, (PDF) 08/03/2006 (4 pp, 24K)
Pilgrim Vegetation Management Project, Shasta-Trinity National Forest FEIS, (PDF) 08/06/2007 (4 pp, 26K)
Pilgrim Vegetation Management Project, Shasta-Trinity National Forest DSEIS, (PDF) 04/28/2009 (4 pp, 26K) - Pinaleño Ecosystem Restoration Project (PDF) 07/30/2009 (3 pp, 73K)
- Piute Fire Restoration Project, DEIS (PDF) 12/18/2009 (5 pp, 92K)
Piute Fire Restoration Project, FEIS (PDF) 06/01/2010 (2 pp, 5K) - Plumas National Forest Public Motorized Travel Management, DEIS (PDF) 03/13/2009 (9 pp, 129K)
Plumas National Forest Public Motorized Travel Management, FEIS (PEF) 12/05/2010 (2 pp, 62K) - Power Fire Restoration Project, DEIS (PDF) 10/12/2005 (10 pp, 46K)
Power Fire Restoration Project, FEIS (PDF) 08/01/2005 (2 pp, 19K) - Prescott National Forest Land and Resource Management Plan, DEIS (PDF) 10/09/2012 (2 pp, 100K)
- Public Motorized Travel Management Plan, Apache-Sitgreaves National Forests, DEIS (PDF) 12/13/2010 (5 pp, 82K)
- Rim Lakes Forest Restoration Project, DEIS (PDF) 11/13/2012 (2 pp, 65K)
No formal comment letter was sent to the preparing agency on the FEIS. - Rosemont Copper Project, Coronado National Forest, DEIS (PDF) 02/21/2012 (24 pp, 282K)
Rosemont Copper Project, Coronado National Forest, Permit Application (PDF) 02/13/2012 (19 pp, 1.2MB) - Round Valley Fuels Reduction and Vegetation Management Project, DEIS (PDF) 10/23/2008 (2 pp, 24K)
No formal comment letter was sent to the preparing agency on the FEIS. - Rubicon Trail Easement, El Dorado County, DEIS (PDF) 01/30/2012 (2 pp, 57K)
No formal comment letter was sent to the United States Forest Service on the FEIS - Safford Ranger District: Special-Use Permits for Recreation Residences, DEIS (PDF) 01/20/2009 (1 pg, 18K)
- Sage Steppe Ecosystem Restoration Strategy, Modoc National Forest, DEIS (PDF) 10/15/2007 (6 pp, 44K)
Sage Steppe Ecosystem Restoration Strategy, Modoc National Forest, FEIS (PDF) 06/05/2008 (1 pg, 17K) - Salt Timber Harvest and Fuel Hazard Reduction Project, DEIS (PDF) 05/06/2009 (7 pp, 39K)
Salt Timber Harvest and Fuel Hazard Reduction Project, FEIS (PDF) 12/17/2009 (2 pp, 56K)
Salt Timber Harvest and Fuel Hazard Reduction Project, DSEIS (PDF) 02/24/2011 (1 pg, 24K)
No letter was sent to the Forest Service on the SFEIS - San Diego County Water Authority Subregional Natural Community Conservation Plan, DEIS (PDF) 06/10/2010 (4 pp, 90K)
- Sequoia National Forest Wheeled Motorized Transit Management, DEIS (PDF) 04/17/2009 (8 pp, 36K)
Sequoia National Forest Wheeled Motorized Transit Management, FEIS (PDF) 11/09/2009 (2 pp, 51K) - Sequoia National Monument Management Plan, DEIS (PDF) 11/02/2010 (4 pp, 82K)
Sequoia National Monument Management Plan, FEIS (PDF) 10/09/2012 (1 pg, 50K) - Shasta-Trinity National Forest Motorized Travel Management, DEIS (PDF) 08/25/2009 (8 pp, 135K)
Shasta-Trinity National Forest Motorized Travel Management, FEIS (PDF) 04/26/2010 (2 pp, 172K) - Show Low Land Exchange, DEIS (PDF) 12/11/2012 (2 pp, 28K)
- Sierra National Forest Motorized Travel Management Plan, DEIS (PDF) 06/17/2009 (7 pp, 135K)
Sierra National Forest Motorized Travel Management, FEIS (PDF) 06/07/2010 (2 pp, 65K) - Sierra Nevada Forests Management Indicator Species, DEIS (PDF) 08/24/2007 (7 pp, 43K)
Sierra Nevada Forests Management Indicator Species, FEIS (PDF) 01/08/2008 (3 pp, 76K) -
Sierra Nevada Forest Plan Amendment, DEIS (PDF) 11/08/2000 (11 pp, 44K)
Sierra Nevada Forest Plan Amendment, FEIS (PDF) 02/12/2001 (2 pp, 19K)
Sierra Nevada Forest Plan Amendment, SDEIS (PDF) 09/23/2003 (7 pp, 30K)
Sierra Nevada Forest Plan Amendment, SFEIS (PDF) 03/15/2004 (5 pp, 25K)
Sierra Nevada Forest Plan Amendment, 2010, SEIS (PDF) 05/05/2010 (3 pp, 105K) - Sierra Pacific Industries Project, Construction of Access Road, DEIS (PDF) 09/08/2006 (3 pp, 23K)
Sierra Pacific Industries Project, Construction of Access Road, FEIS (PDF) 11/09/2007 (3 pp, 22K) - Slapjack Project, FEIS (PDF) 11/02/2006 (2 pp, 22K)
Slapjack Project, DEIS (PDF) 04/19/2006 (7 pp, 56K) - South Shore Fuel Reduction and Healthy Forest Restoration, DEIS (PDF) 06/05/2009 (6 pp, 30K)
South Shore Fuel Reduction and Healthy Forest Restoration, FEIS (PDF) 01/09/2012 (1 pg, 50K) - South Yuba Canal Maintenance Project, Tahoe National Forest, DEIS (PDF) 09/05/2006 (2 pp, 23K)
No formal comment letter was sent to the preparing agency on the FEIS. - Southeastern Lincoln County Habitat Conservation Plan, DEIS 02/18/2009 (11 pp, 127K)
Southeastern Lincoln County Habitat Conservation Plan, FEIS 04/19/2010 (2 pp, 577K) - Southern California National Forests, Forest Plans Revisions, DEIS (PDF) 08/23/2004 (7 pp, 43K)
Southern California National Forests, Forest Plans Revisions, FEIS (PDF) 10/31/2005 (2 pp, 71K)
No formal comment letter was sent to the Forest Service for the Southern California National Forests, Forest Plans Revisions, Second FEIS - Stanislaus National Forest Motorized Travel Management, FEIS (PDF) 01/12/2010 (3 pp, 70K)
Stanislaus National Forest Motorized Travel Management, DEIS (PDF) 05/06/2010 (10 pp, 119K) - Sugar Pine Adaptive Management Project, DEIS (PDF) 08/28/2009 (4 pp, 98K)
Sugar Pine Adaptive Management Project, FEIS (PDF) 04/12/2010 (2 pp, 43K) - Sugarberry Project, Proposes to Protect Rural Communities from Fire Hazards, DEIS (PDF) 07/27/2007 (6 pp, 60K)
Sugarberry Project, Proposes to Protect Rural Communities from Fire Hazards, FEIS (PDF) 12/08/2008 (2 pp, 19K) - Tahoe National Forest Motorized Travel Management Plan, DEIS (PDF) 12/24/2008 (7 pp, 42K)
Tahoe National Forest Motorized Travel Management Plan, SDEIS (PDF) 04/12/2010 (7 pp, 120K)
Tahoe National Forest Motorized Travel Management Plan, FEIS (PDF) 11/12/2010 (2 pp, 74K) - Tehachapi Renewable Transmission Project, DEIS (PDF) 04/06/2009 (12 pp, 117K)
Tehachapi Renewable Transmission Project, SDEIS (PDF) 06/14/2010 (10 pp, 115K)
Tehachapi Renewable Transmission Project, FEIS (PDF) 10/25/2010 (3 pp, 94K) - Thom-Seider Vegetation Management and Fuels Reduction Project, DEIS (PDF) 05/26/2009 (10 pp, 60K)
Thom-Seider Vegetation Management and Fuels Reduction Project, FEIS (PDF) 11/20/2009 (2 pp, 56K) - Turntable Bay Marina Master Development Plan, DEIS (PDF) 02/26/2007 (2 pp, 20K)
No formal letter was sent to the preparing agency on the FEIS because the DEIS was rated LO, the preferred alternative did not change, and our comments were adequately addressed. - Two-Bit Vegetation Management Project, DEIS (PDF) 06/21/2010, (7 pp, 116K)
Two-Bit Vegetation Management Project, FEIS (PDF) 12/11/2012, (2 pp, 28K) - Warm Fire Recovery Project, DEIS (PDF) 04/14/2008 (5 pp, 33K)
Warm Fire Recovery Project, FEIS (PDF) 05/04/2009 (2 pp, 25K) - Watdog Project, Proposes to Reduce Fire Hazards, Harvest Trees, Using Group Selection Methods, Plumas National Forest, DEIS (PDF) 08/11/2005 (11 pp, 81K)
Watdog Project, Proposes to Reduce Fire Hazards, Harvest Trees, Using Group Selection Methods, Plumas National Forest, FEIS (PDF) 11/03/2005 (2 pp, 19K)
Watdog Project, Proposes to Reduce Fire Hazards, Harvest Trees, Using Group Selection Methods, Plumas National Forest, SDEIS (PDF) 10/16/2006 (6 pp, 38K)
Watdog Project, Proposes to Reduce Fire Hazards, Harvest Trees, Using Group Selection Methods, Plumas National Forest, SFEIS (PDF) 05/09/2007 (1 pg, 21K)
Watdog Project, Proposes to Reduce Fire Hazards, Harvest Trees, Using Group Selection Methods, Plumas National Forest, 2nd SDEIS (PDF) 02/04/2008 (1 pg, 20K)
Watdog Project, Proposes to Reduce Fire Hazards, Harvest Trees, Using Group Selection Methods, Plumas National Forest, 2nd SFEIS (PDF) 05/27/2008 (1 pg, 19K) - Whisky Ridge Ecosystem Restoration Project, Sierra National Forest, DEIS (PDF) 04/03/2013 (4 pp, 50K)
- White Pine & Grant-Quinn Oil and Gas Leasing Project, FEIS (PDF) 09/27/2007 (2 pp, 22K)
| Pacific Southwest NewsroomPacific Southwest Programs | Grants & FundingUS-Mexico Border | Media CenterCareers | About EPA Region 9 (Pacific Southwest)A-Z Index |
