End-of-Year 2006 BRAC Program Snapshot
PowerPoint Version (2 pp, 98K)
On this page
- BRAC Federal Facilities by BRAC Round
- NPL Status of BRAC Facilities
- Current Site Work
- Completed Site Work
- BRAC Federal Facility Site Cleanup Pipeline
- Interagency Agreements (IAGs)
- Land Reuse
- Remedial Actions and Removal Actions with Institutional Controls
- Status of Remedies Requiring Monitoring at BRAC Facilities
- Environmental Indicators Status for Final NPL BRAC Federal Facilities (CERCLA)
- Notes
BRAC Federal Facilities by BRAC Round
NPL Status of BRAC Facilities
| NPL Status | Number of BRAC Facilities |
|---|---|
| Proposed | 3 |
| Final | 35 |
| Deleted | 0 |
| Soon to be Proposed | 1 |
| Non NPL | 68 |
| Total | 107 |
Current Site Work
Completed Site Work
BRAC Federal Facility Site Cleanup Pipeline
Interagency Agreements (IAGs)
% of BRAC Federal Facilities with Completed IAGs
| Agency | # w/ IAG | Total # | Percent |
|---|---|---|---|
| Navy | 9 | 35 | 26.0% |
| Army | 11 | 40 | 28.0% |
| USAF | 12 | 29 | 41.0% |
| DoD | 0 | 1 | 0.0% |
| Agency | # w/ IAG | Total # | Percent |
|---|---|---|---|
| DLA | 2 | 2 | 100.0% |
Land Reuse
Number of Acres at BRAC Facilities Made Available for Reuse (in Thousands)
(at 95 Facilities)
* Total # of acres made available for reuse at Facilities with EPA involvement (BRAC, NPL, and Non-NPL = 508.8). Does not include property transferred between Federal Agencies.
Remedial Actions and Removal Actions with Institutional Controls
Note: There are 45 BRAC Federal Facilities with Institutional Controls.
Status of Remedies Requiring Monitoring at BRAC Facilities
Total Number of Sites with Completed 5 Year Reviews = 35
(Latest Protectiveness Statement at Site)
Note: In the second quarter of FY 2005, EPA implemented a change in the way 5 Year Review data is recorded.
Environmental Indicators Status for Final NPL BRAC Federal Facilities (CERCLA)
(Total Facilities = 35)
Note: 49% of Facilities have both Human Exposure and Groundwater controlled; 3% of Facilities have neither Human Exposure nor Groundwater controlled
Notes
- All data from 10/16/2006 CERCLIS 3 except where noted.
- BRAC cleanup data includes both Superfund and RCRA activity at Superfund Federal Facilities.
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)