Mid Year 2009 BRAC I-IV Program Snapshot



BRAC Federal Facilities by BRAC Round

Pie chart: BRAC 1 - 18% (19), BRAC 2 - 24% (26), BRAC 3 - 26% (28), BRAC  4 - 32% (34)

Top of page


NPL Status of BRAC Facilities

NPL Status Number of BRAC Facilities
Proposed
3
Final
34
Deleted
1
Non NPL
69
Total
107

Top of page


Current Site Work
Current Site Work Bar Graph:  Ongoing Removals 18, Active TAGs 5, Ongoing R1/FS Actions 82, Ongoing RDs 16, Ongoing RAs 59, Ongoing O & M 48

Top of page


Completed Site Work
Completed Site Work Bar Graph;  Removal Comps 487, Decision Documents 699, RD Comps 243, RA Comps 291, OPS 46, 5 Year Reviews 70, Particl Deletions 6

Top of page


BRAC Federal Facility Site Cleanup Pipeline
BRAC Federal Facility Site Cleanup Pipeline Graph:  BRAC Facilities 107, BRAC Facilities with IAGs 34, Active RABs 68, Final Remedy Selected 26, All Construction Completed 10, Deleted Facility 1

Top of page


Interagency Agreements

% of BRAC Federal Facilities with Completed IAGs
Federal Agencies that have not achieved 100% of their IAGs/FFAs:
Agency # w/ IAG Total # Percent
Navy 9 35 25.7%
Army 11 40 27.5%
Air Force 12 29 41.4%
Dept. of Defense 0 1 0.0%
Federal Agencies that have achieved 100% of their IAGs/FFAs:
Agency # w/ IAG Total # Percent
DLA 2 2 100.0%

Top of page


Remedial Actions and Removal Actions with Institutional Controls at BRAC Facilities
Remedial Actions and Removal Actions with Institutal Controls at BRAC Facilities Bar Graph  8 Removals, 171 Rededial Actions

Note: There are 47 BRAC Federal Facilities with Institutional Controls.

Top of page


Status of Remedies Requiring Monitoring at BRAC Facilities
Total Number of Sites with Completed 5 Year Reviews = 40
(Latest Protectiveness Statement at Site)

Status of Remedies Requiring Monitoring at BRAC Facilities Bar Graph:  Protective 20, Will be protective at remedy completion 4, Protective in the short term 4, Not protective 1, Protectiveness Deferred 4

Note: In the second quarter of FY 2005, EPA implemented a change in the way 5 Year Review data is recorded.

Top of page


Environmental Indicators Status for Final NPL BRAC at Federal Facilities
(Total Facilities = 35)
Environmental Indicators Status for Final NPL BRAC and Federal Facilities Bar Graph;  Human Exposure  Controlled 29, Insufficient Data 4, Not Controlled 2; Groundwater  Controlled 22, Insufficient data 5, not controlled 7, not a GW site 1

Note: 60% of Facilities have both Human Exposure and Groundwater controlled;
6% of Facilities have neither Human Exposure nor Groundwater controlled.

Top of page


BRAC Federal Facilities which are Sitewide Ready for Anticipated Use

Bar Graph: 7

Top of page


Notes:

  • Notes: All data from 04/08/2009 CERCLIS 3.
  • BRAC cleanup data includes both Superfund and RCRA activity at Superfund Federal Facilities.