Jump to main content.


Mid-Year 2009 BRAC I-IV Program Snapshot

PowerPoint Version (2 pp, 192K)

On this page


BRAC Federal Facilities by BRAC Round

BRAC 1: 18% (19), BRAC 2: 24% (26), BRAC 3; 26% (28), BRAC 4: 32% (34)

Top of page


NPL Status of BRAC Facilities

NPL Status Number of BRAC Facilities
Proposed 3
Final 34
Deleted 1
Non NPL 69
Total 107

Top of page


Current Site Work

Ongoing Removals: 18, Active TAGs: 5, Ongoing R1/FS Actions: 82, Ongoing RDs: 16, Ongoing RAs: 59, Ongoing O & M: 48

Top of page


Completed Site Work

Removal Comps: 487, Decision Documents: 699, RD Comps: 243, RA Comps: 291, OPS: 46, 5 Year Reviews: 70, Partial Deletions: 6

Top of page


BRAC Federal Facility Site Cleanup Pipeline

BRAC Facilities: 107, BRAC Facilities with IAGs: 34, Active RABs: 68, Final Remedy Selected: 26, All Construction Completed: 10, Deleted Facility: 1

Top of page


Interagency Agreements (IAGs)

% of BRAC Federal Facilities with Completed IAGs

Federal Agencies that have not achieved 100% of their IAGs/FFAs:
Agency # w/ IAG Total # Percent
Navy 9 35 25.7%
Army 11 40 27.5%
Air Force 12 29 41.4%
Dept. of Defense 0 1 0.0%
Federal Agencies that have achieved 100% of their IAGs/FFAs:
Agency # w/ IAG Total # Percent
DLA 2 2 100.0%

Top of page


Remedial Actions and Removal Actions with Institutional Controls at BRAC Facilities

Remedial Actions: 171, Removals: 8

Note: There are 47 BRAC Federal Facilities with Institutional Controls.

Top of page


Status of Remedies Requiring Monitoring at BRAC Facilities

Total Number of Sites with Completed 5 Year Reviews = 40
(Latest Protectiveness Statement at Site)

Protective: 20, Will Be Protective at Remedy Completion: 4, Protective in the Short Term: 11, Not Protective: 1, Protectiveness Deferred: 4

Note: In the second quarter of FY 2005, EPA implemented a change in the way 5 Year Review data is recorded.

Top of page


Environmental Indicators Status for Final NPL BRAC at Federal Facilities

(Total Facilities = 35)

Human Exposure Controlled: 29, Human Exposure Insufficient Data: 4, Human Exposure Not Controlled: 2; Groundwater Controlled: 22, Groundwater Insufficient Data: 5, Groundwater Not Controlled: 7, Not a GW Site: 1

Note: 60% of Facilities have both Human Exposure and Groundwater controlled; 6% of Facilities have neither Human Exposure nor Groundwater controlled.

Top of page


BRAC Federal Facilities Which Are Sitewide Ready for Anticipated Use

7

Top of page


Notes

Top of page

Web page maintained by the Federal Facilities Restoration and Reuse Office
Send comments to: comments_ffrro@epa.gov


Local Navigation