Jump to main content.


FY 2006 NPL Program Snapshot

PowerPoint Version (2 pp, 110K)

On this page


NPL Federal Facilities by Agency

(Proposed, Final and Deleted)

Army: 26% (44), DLA: 2% (3), Air Force: 22% (37), Navy: 30% (54), National Guard: 1% (1), DOE: 12% (21), Other*: 6% (11), Corp of Engineers: 1% (1)

*Other Federal Agencies include: Coast Guard (1), DOI (2), DOT (1), EPA (1), FAA (1), NASA (2), SBA (1), USDA (2)

Top of page


Status of NPL Federal Facilities

NPL Status Number of Federal Facilities Number of Private Sites Federal Facility % of NPL Universe
Final 158 1,083 12.7%
Deleted 14 300 4.5%
Total* 172 1,383 11.1%

*Total number of Federal Facilities and private sites on the NPL is 1,555.

Top of page


Current Site Work

Ongoing Removals: 124, Active TAGs: 19, Ongoing RI/FS Actions: 411, Ongoing RDs: 57, Ongoing RAs: 221, Ongoing O&M: 84

Top of page


Completed Site Work

Removed Comps: 718, Decision Documents: 1,407, RD Comps: 764, RA Comps: 740, OPS: 39, 5 Year Reviews: 219, Partial Deletions: 15

Top of page


NPL Federal Facility Site Cleanup Pipeline

NPL Facilities: 172, Facilities with IAGs: 152, Active RABs/SSABs: 125, Final Remedy Selected: 70, All Construction Completed: 55, Deleted Facilities: 14

Top of page


Interagency Agreements (IAGs)

% of NPL Federal Facilities with Completed IAGs

Federal Agencies that have not acheived 100% of their IAGs/FFAs:
Agency # w/ IAG Total # Percent
Navy 50 54 93.0%
Army 41 44 93.2%
USAF 30 37 81.1%
DoE 19 21 90.0%
USDA 1 2 50.0%
DoT 0 1 0.0%
SBA* 0 1 0.0%
CG 0 1 0.0%
Federal Agencies that have acheived 100% of their IAGs/FFAs:
Agency # w/ IAG Total # Percent
DLA 3 3 100.0%
NASA 2 2 100.0%
DOI 2 2 100.0%
NAGU 1 1 100.0%
CoE 1 1 100.0%
EPA 1 1 100.0%
FAA 1 1 100.0%

*This SBA site (Cal West Metals) is Deleted from the NPL

Top of page


Land Reuse

Number of Acres at NPL Facilities Made Available for Reuse (in Thousands)
(at 94 Facilities)

FY 96: 82.6, FY 97: 12.4, FY 98: 14.1, FY 99: 8.8, FY 00: 38.4, FY 01: 1.7, FY 02: 12.3, FY 03: 17.9, FY 04: 82.5, FY 05: 25.2, FY 06: 44.4

* Total # of acres made available for reuse at Facilities with EPA involvement (BRAC, NPL, and Non-NPL) = 508.8. Acreage at NPL BRAC Installations = 284.5, other NPL acreage = 77.2. Does not include property transferred between Federal Agencies.

Top of page


Remedial Actions and Removal Actions with Institutional Controls

Remedial Actions: 475, Removals: 43

Note: There are 137 NPL Federal Facilities with Institutional Controls.

Top of page


Status of Remedies Requiring Monitoring at NPL Facilities

Total Number of Sites with Completed 5 Year Reviews = 130
(Latest Protectiveness Statement at Site)

Protective: 46, Will Be Protective at Remedy Complete: 16, Protective in the Short Term: 20, Not Protective: 8, Protectiveness Deferred: 6, Complete: 34

Note: In the second quarter of FY 2005, EPA implemented a change in the way 5 Year Review data is recorded.

Top of page


Environmental Indicators Status for Final NPL Federal Facilities (CERCLA)

(Total Facilities = 172)

Human Exposure Controlled: 144, Human Exposure Insufficient Data: 16, Human Exposure Worksheet Draft: 1, Human Exposure Not Controlled: 11, Groundwater Controlled: 98, Groundwater Insufficient Data: 33, Groundwater Worksheet Draft: 1, Groundwater Not Controlled: 34, Not a GW Site: 6

Note: 59% of Facilities have both Human Exposure and Groundwater controlled; 3% of Facilities have neither Human Exposure nor Groundwater controlled

Top of page


RCRA High Priority Facilities

Total Facilities: 160
Source: RCRIS 7/5/2005

Human Exposure Controlled: 36, Groundwater Controlled: 3, Both Controlled: 106, Neither Controlled: 15

Top of page


Notes

Top of page

Web page maintained by the Federal Facilities Restoration and Reuse Office
Send comments to: comments_ffrro@epa.gov


Local Navigation


Jump to main content.