Mid-Year 2007 National Priorities List (NPL) Program Snapshot

PowerPoint Version (2 pp, 187K)


NPL Federal Facilities by Agency

(Final and Deleted)

Army: 26% (44), DLA: 2% (3), Air Force: 22% (37), Navy: 30% (54), National Guard: 1% (1), DOE: 12% (21), Other: 6% (11), Corp of Engineers: 1% (1)

*Other Federal Agencies include: Coast Guard (1), DOI (2), DOT (1), EPA (1), FAA (1), NASA (2), SBA (1), USDA (2)

Top of page


Status of NPL Federal Facilities

NPL Status Number of Federal Facilities Number of Private Sites Federal Facility % of NPL Universe
Final 157 1,086 12.6%
Deleted 15 304 4.7%
Total* 172 1,390 11.0%

*Total number of Federal Facilities and private sites on the NPL is 1,562.

Top of page


Current Site Work

Ongoing Removals: 123, Active TAGs: 17, Ongoing RI/FS Actions: 401, Ongoing RDs: 59, Ongoing RAs: 202, Ongoing O&M: 91

Top of page


Completed Site Work

Removal Comps: 737, Decision Documents: 1,456, RD Comps: 770, RA Comps: 757, OPS: 41, 5 Year Reviews: 217, Partial Deletions: 25

Top of page


NPL Federal Facility Cleanup Pipeline

NPL Facilities: 172, Facilities with IAGs: 153, Active RABs/SSABs: 123, Final Remedy Selected: 70, All Construction Completed: 56, Deleted Facilities: 15

Top of page


Interagency Agreements

% of NPL Federal Facilities with Completed IAGs

Federal Agencies that have not acheived 100% of their IAGs/FFAs:
Agency # w/ IAG Total # Percent
Navy 50 54 92.6%
Army 41 45 91.1%
Air Force 31 37 83.8%
Dept. of Energy 19 21 90.5%
Dept. of Agriculture 1 2 50.0%
Dept. of Transportation 0 1 0.0%
SBA* 0 1 0.0%
Coast Guard 0 1 0.0%
Federal Agencies that have acheived 100% of their IAGs/FFAs:
Agency # w/ IAG Total # Percent
DLA 3 3 100.0%
NASA 2 2 100.0%
Dept. of Interior 2 2 100.0%
National Guard 1 1 100.0%
USACE 1 1 100.0%
EPA 1 1 100.0%
FAA 1 1 100.0%

*This SBA site (Cal West Metals) is Deleted from the NPL.

Top of page


Remedial Actions and Removal Actions with Institutional Controls

 
Remedial Actions: 484, Removals: 43
 

Note: There are 137 NPL Federal Facilities with Institutional Controls.

Top of page


Status of Remedies Requiring Monitoring at NPL Facilities

Total Number of Sites with Completed 5 Year Reviews = 132
(Latest Protectiveness Statement at Site)

 
Protective: 52, Will Be Protective at Remedy Complete: 17, Protective in the Short Term: 21, Not Protective: 8, Protectiveness Deferred: 7, Complete: 27
 

Note: In the second quarter of FY 2005, EPA implemented a change in the way 5 Year Review data is recorded.

Top of page


Environmental Indicators Status for Final NPL Federal Facilities (CERCLA)

(Total Facilities = 172)

 
Human Exposure Controlled: 144, Human Exposure Insufficient Data: 16, Human Exposure Worksheet Draft: 1, Human Exposure Not Controlled: 11, Groundwater Controlled: 101, Groundwater Insufficient Data: 31, Groundwater Worksheet Draft: 1, Groundwater Not Controlled: 33, Not a GW Site: 6

Note: 61% of Facilities have both Human Exposure and Groundwater controlled; 3% of Facilities have neither Human Exposure nor Groundwater controlled.