EPA Approved Tennessee Source-Specific Requirements
§52.2220 Identification of plan.
(a) Purpose and scope. This section sets forth the applicable State implementation plan for Tennessee under section 110 of the Clean Air Act, 42 U.S.C. 7401, and 40 CFR part 51 to meet national ambient air quality standards.
(b) Incorporation by reference. (1) Material listed in paragraph (c) of this section with an EPA approval date prior to January 1, 2006, for Tennessee (Table 1 of the Tennessee State Implementation Plan), January 1, 2003 for Memphis Shelby County (Table 2 of the Tennessee State Implementation Plan), March 1, 2005, for Knox County (Table 3 of the Tennessee State Implementation Plan), April 1, 2005 for Chattanooga (Table 4 of the Tennessee State Implementation Plan), April 1, 2005, for Nashville-Davidson County (Table 5 of the Tennessee State Implementation Plan) and paragraph (d) with an EPA approval date prior to December 1, 1998, was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists on the date of the approval, and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) of this section with EPA approval dates after January 1, 2006, for Tennessee (Table 1 of the Tennessee State Implementation Plan), January 1, 2003 for Memphis Shelby County (Table 2 of the Tennessee State Implementation Plan), March 1, 2005, for Knox County (Table 3 of the Tennessee State Implementation Plan), April 1, 2005 for Chattanooga (Table 4 of the Tennessee State Implementation Plan), April 1, 2005, for Nashville-Davidson County (Table 5 of the Tennessee State Implementation Plan) and paragraph (d) with an EPA approval date after December 1, 1998, will be incorporated by reference in the next update to the SIP compilation.
(2) EPA Region 4 certifies that the rules/regulations provided by EPA in the SIP compilation at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated State rules/regulations which have been approved as part of the State implementation plan as of the dates referenced in paragraph (b)(1).
(3) Copies of the materials incorporated by reference may be inspected at the Region 4 EPA Office at 61 Forsyth Street, SW., Atlanta, GA 30303; the EPA, Air and Radiation Docket and Information Center, Air Docket, 1301 Constitution Avenue, NW., Room B102, Washington, DC 20460; or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.
Updated as of: October 1, 2023
EPA Contact: EPA Region 4: Josue Ortiz-Borrero (404-562-8085)
EPA Approved Tennessee Source-Specific Requirements: Please note that the adobe portable document file (pdf) linked below is not Section 508 compliant, and not screen reader adaptable. However, we are required by court order to post these documents to the internet. EPA did not receive compliant files from the agencies who issued the permits. We are working to rectify this situation and will post 508 compliant files as soon as we are able. If you need assistance with reading these these files, please contact Josue Ortiz-Borrero at 404-562-8085 and he will assist you.
Tennessee Source Specific Revisions to the State Implementation Plan (pdf)
EPA-Approved Tennessee Source-Specific Requirements
Name of Source | Permit No. | State effective date | EPA approval date | Explanation |
---|---|---|---|---|
Revised Permits for the Kingsport Particulate Nonattainment Area | 046065P, 046066P | 9/15/1999 | 11/5/1999, 64 FR 60346 | |
Union Carbide, Tennessee Eastman Company | 23-86, 24-86, 34-86, 36-86 | 12/30/1986 | 6/16/1987, 52 FR 22778 | Board Order numbers are listed under Permit No. |
Murray Ohio Manufacturing Company | 32-86 | 12/30/1986 | 12/10/1987, 52 FR 46764 | Board Order numbers are listed under Permit No. |
Tennessee Eastman Company | 13-87, 14-87 | 1/6/1988 | 10/12/1988, 53 FR 39742 | Board Order numbers are listed under Permit No. |
Variance for Averaging Times for VOC Emission | 19-87 | 1/6/1988 | 6/23/1988, 53 FR 23624 | Board Order numbers are listed under Permit No. |
Avco Aerostructures | 42-3, 42-4, 42-3, 42-5, 42-6, 42-7, 42-8, 42-9, 42-10, 42-18, 42-19 | 2/25/1988 | 1/23/1989, 54 FR 3031 | Board Order numbers are listed under Permit No. |
Miscellaneous Metal Parts | 97-63 | 4/5/1999 | 11/5/1999, 64 FR 60346 | Board Order numbers are listed under Permit No. |
Nissan Manufacturing Corporation |
029538P, 029539P, 029540P, 029541P, 029543P, 029544P, 030180P |
4/29/1991 | 9/9/1991, 56 FR 45896 | |
Tenneco Energy | 045022F, 045025F | 5/31/1996 | 7/24/1996, 61 FR 38391 | |
Brunswick Marine Corporation | 044881P, 045012P, 045013P | 5/31/1996 | 7/21/1997, 62 FR 38909 | |
Metalico College Grove, Inc | 548466 | 5/12/1999 | 7/12/1999, 64 FR 37411 | |
Refined Metals, Inc. | n/a | 9/20/2000, 65 FR 56796 | ||
Eastman Chemical Company | BART Permit 066116H | 5/9/2012 | 11/27/2012 77 FR 70692 |
BART determination. |
Eastman Chemical Company—Amendment #1 | BART Permit 066116H, Amendment #1 | 5/22/2012 | 11/27/2012 77 FR 70692 |
Clarifying amendment to BART Determination. |
TVA Bull Run Fossil Plant | n/a | 12/20/2016 | 08/29/2017, 82 FR 40956 | Title V permit limits and conditions E3-4(a), (d), and (e), E3-15, and E3-16 in Appendix L of Tennessee's December 20, 2016 SIP revision. |
TVA Kingston Fossil Plant | n/a | 12/20/2016 | 08/29/2017, 82 FR 40956 | Title V permit limits and conditions E3-4(a), (d), and (e), E3-15, and E3-16 in Appendix L of Tennessee's December 20, 2016 SIP revision. |
[64 FR 35012, June 30, 1999]
Editorial Note: For Federal Register citations affecting §52.2220, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.fdsys.gov.