Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 4
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 82
- Lead Total results: 398
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 105
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 283
- Southeast Minnesota Groundwater Total results: 11
Displaying 181 - 195 of 2600 results
-
Section 302 notification requirements and mixtures with unknown components
Are facilities exempt from Section 302 notification requirements if they produce, use, or store mixtures whose extremely hazardous substance component information is not available on the MSDS provided by the manufacturer? If the facility which produces, uses, or stores mixtures knows or reasonably should know the components of the mixture…
- Last published:
-
If there are differences among EPA's, HUD's, and my State's lead-safe work and housing requirements, which ones do I have to comply with?
You must comply with all applicable requirements. The initial 8-hour renovator training course will teach you how to perform lead-safe work practices safely and effectively in compliance with the EPA Lead Renovation, Repair, and Painting (RRP) Rule and the Housing and Urban Development (HUD) Lead Safe Housing Rule. The RRP…
- Last published:
-
When individuals apply for certification in the Federal program under 40 C.F.R. 745.226(a)(1)(i), how long will the certification last?
Answer : For individuals who have taken courses which included a course test and a hands-on skills assessment, the full certification period for individuals applying under 745.226(a)(1)(i) will run for three years from the date of issuance of certification by EPA. For individuals who have taken courses which included a…
- Last published:
-
How does the June 18, 2010 announcement impact renovators in states that have adopted their own RRP programs?
Answer: If you work in a state authorized by EPA to run their own renovation program, you should contact them for information on their certification requirements. If you work in a state where EPA administers the renovation program your firm needs to be certified by EPA. Please refer to the…
- Last published:
-
Is there a formal requirement that an Asbestos Model Accreditation Plan (MAP) asbestos training course must have a training manual?
Accredited trainers are not required to have a formal training manual, per se. According to the Asbestos Model Accreditation Plan (MAP), at Unit III, (A)(3), (A)(4)(d) and (A)(5) of appendix C to 40 CFR part 763, subpart E, a trainer’s application for course approval must include the course curriculum, a…
- Last published:
-
Obtaining an RMP ID Number
How can a facility subject to the Risk Management Plan (RMP) requirements obtain its RMP ID number? The owner or operator of a regulated RMP facility that has already submitted an RMP, may obtain the facility's identification number (RMP ID Number) by contacting the RMP Reporting Center (703-227-7650). An RMP-covered…
- Last published:
-
If a renovator disrupts 20 square feet or less of painted surface per side on several sides of the exterior of one property, does the RRP Rule apply?
Yes. To qualify for the exception for minor repair and maintenance activities, the total amount of exterior paint disrupted must be 20 square feet or less. In addition, the job must not use prohibited practices or involve window replacement or demolition of painted surfaces. Question Number: 23002-18379 Find a printable…
- Last published:
-
When installing a roof, my firm does not create dust by directly sanding or cutting painted surfaces, but we do hammer the unpainted side of the lumber from above. Does the RRP Rule apply to this work?
The Lead Renovation, Repair, and Painting (RRP) Rule applies to work that disturbs painted surfaces. If hammering painted components, even on the unpainted side, disturbs paint, creating dust or chips, the RRP Rule applies. Question Number: 23002-23787 Find a printable PDF copy of all frequent questions pertaining to lead…
- Last published:
-
What is a renovation?
The Lead Renovation, Repair, and Painting (RRP) Rule covers activities that modify an existing structure and that result in the disturbance of painted surfaces. All types of repair, remodeling, maintenance, modernization, and weatherization projects are covered, including projects performed as part of another Federal, State, or local program, if the…
- Last published:
-
Is my EPA renovator certification accepted in all states and tribal areas?
Answer: Not necessarily. Whether to accept certification from another jurisdiction is up to the individual state or tribal area. EPA cannot compel states or tribes to adopt programs identical to the Federal program or to establish reciprocity provisions. However, EPA continues to encourage states and tribes that may be considering…
- Last published:
-
My firm is performing a renovation in an unoccupied home that will be put up for sale when work is done. Does the RRP Rule apply to this renovation?
Yes. Temporarily unoccupied or vacant housing is not exempt from the requirements of the Lead Renovation, Repair, and Painting (RRP) Rule . Question Number: 23002-19754 Find a printable PDF copy of all frequent questions pertaining to lead . Other Frequent Questions about the RRP Program General Information Renovations Covered by…
- Last published:
-
What happens after the track work is completed?
The track work has been the highest priority to remove most contamination as early as possible. This, plus preventing the spread of contamination by capturing water from the site and constructing a bypass of Sulphur Run around the site will continue into June. While track work and water management continue…
- Last published:
-
What are the health agencies doing?
The Centers for Disease Control and Prevention and Agency for Toxic Substances and Disease Registry (ATSDR) are analyzing their Assessment of Chemical Exposure (ACE) survey results to assess the health impacts of the train derailment. CDC and ATSDR continue to support the Ohio and Pennsylvania health departments and will be…
- Last published:
-
Is anybody sampling State Line Lake and the pond near the derailment site?
Norfolk Southern collects daily samples from the surface water near the derailment site, north of the tracks. State Line Lake flows through a wetland area and into the surface water area where the samples are taken. The agencies are reviewing all surface water results and Norfolk’s proposed plan for characterizing…
- Last published:
-
Does the distance to endpoint start at the process or stationary source boundary?
When selecting the worst-case release scenario for Program 2 and 3 processes as required by 40 CFR §68.25, a stationary source owner or operator must analyze the release scenario that results in the greatest distance to an endpoint. Does the "greatest distance to an endpoint" refer to the greatest total…
- Last published: