Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 149
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 398
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 241 - 255 of 2671 results
-
What training requirements apply to non-certified workers who have previous EPA/HUD lead-safe work practices training or accredited abatement supervisor or worker training?
The Lead Renovation, Repair, and Painting (RRP) Rule requires certified renovators to provide on-the-job training (OJT) to non-certified workers on the work practices they will be using in performing their assigned tasks. The amount of OJT needed and the topics that need to be covered depend on the knowledge and…
- Last published:
-
When must scaffolding and vertical shrouding be used on an exterior renovation when other buildings are in close proximity to the work area?
The certified renovator or a worker under the direction of the certified renovator must contain the work area so that dust or debris does not leave the work area while the renovation is being performed. The certified renovator must be on site while the containment is established and is responsible…
- Last published:
-
What, if any, additional requirements or liabilities exist if a homeowner independently removes the protective barriers and containment measures implemented by the firm during a renovation?
Before a firm begins a renovation, they are required to comply with all information distribution requirements under the Lead Renovation, Repair and Painting (RRP) Rule and to post signs that clearly define the work area and warn occupants and other persons not involved in renovation activities to remain outside of…
- Last published:
-
Will insurance premiums go up for contractors covered by the Renovation, Repair, and Painting (RRP) Rule that work in homes and child-occupied facilities with lead-based paint?
The practice of carrying insurance to cover work in older homes from potential lead poisoning damages is not new. The RRP Rule, because it sets a clear standard of care and allows contractors to demonstrate that they meet that standard by taking appropriate training and using proper work practices, could…
- Last published:
-
If I use a hammer to make a hole is a wall that is two feet on each side, does the RRP Rule apply?
Yes. Although making the hole disrupts less than six square feet of painted surface, using a hammer to make the hole is demolition of the surface, so the minor repair and maintenance exception does not apply. Making the hole using a cut-out technique that does not destroy the section of…
- Last published:
-
If a remodeling company that is a certified firm uses all contractual workers rather than employees, must each contractual worker be a certified renovator, or can the workers be trained on the job by a certified renovator employed by the firm?
Firms hiring contractual workers may provide the certified renovator that oversees the renovation project and provides on-the-job training to contractual workers and other non-certified workers. Question Number: 23002-18377 Find a printable PDF copy of all frequent questions pertaining to lead . Other Frequent Questions about the RRP Program General Information…
- Last published:
-
To avoid harming the homeowner's grass and landscaping, may my firm fold up the plastic sheeting used for containment at night and re-use it the next day?
Yes, as long as your firm does so in a way that contains any dust and debris on the plastic. One way to accomplish this is to collect and remove the paint chips and debris from the plastic sheeting at the end of each day, mist the sheeting and fold…
- Last published:
-
EPCRA 312 Back Reporting for Previous Years
Facilities subject to EPCRA section 312 (40 CFR part 370) must submit an inventory form annually to the state emergency response commission (SERC), local emergency planning committee (LEPC), and local fire department. Do facilities have to report for previous years if they were subject to hazardous chemical inventory reporting but…
- Last published:
-
EPCRA 311 / 312 Applicability to Brine / Salt Solutions
Are facilities required to prepare or have available a material safety data sheet/safety data sheet (MSDS/SDS) for brine/salt solutions under the Occupational Safety and Health Administration (OSHA) Hazard Communication Standard (HCS) ( 29 CFR 1910.1200 )? Yes, facilities are required to prepare or have available an MSDS/SDS for brine/salt solutions…
- Last published:
-
Definition of Ambient Temperature for EPCRA 312 Reporting
The Tier II Hazardous Chemical Inventory form, used to meet annual EPCRA section 312 reporting requirements, requires facility owners or operators to note whether reported hazardous chemicals are present at, above, or below ambient temperature. What is meant by ambient temperature? Ambient temperature means that the material is stored in…
- Last published:
-
Definition of "release"
How is the term "release" defined? CERCLA section 101(22) defines "release" as any "...spilling, leaking, pumping, pouring, emitting, emptying, discharging, injecting, escaping, leaching, dumping, or disposing into the environment (including the abandonment or discarding of barrels, containers, and other closed receptacles containing any hazardous substance or pollutant or contaminant)...."
- Last published:
-
Who must be notified of a release under EPCRA?
Who must be notified of a release under Emergency Planning and Community Right-to-Know Act (EPCRA)? The notice required by section 304 of EPCRA is to be given by the owner or operator of a facility (by telephone, radio, or in person) immediately after the release of a CERCLA hazardous substance…
- Last published:
-
Who must be notified of a release under CERCLA?
Who must be notified of a release under CERCLA? One call to the NRC fulfills the requirement to report releases of hazardous substances under CERCLA and several other regulatory programs, including those under the Clean Water Act (CWA) section 311, Resource Conservation and Recovery Act (RCRA), and the U.S. Department…
- Last published:
-
Tests to determine RCRA characteristic of toxicity
What tests can be used to determine whether a waste exhibits the Resource Conservation and Recovery Act (RCRA) characteristic of toxicity? In 1990, EPA replaced the extraction procedure test for determining whether wastes exhibit the toxicity characteristic with the toxicity characteristic leaching procedure (TCLP). Currently, a waste is considered toxic…
- Last published:
-
Reporting spills of FIFRA registered pesticides
If a pesticide registered under the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) is accidentally spilled, must it be reported? Yes. Accidents, spills, improper application, and improper disposal are within the scope of the release notification provisions of CERCLA and must be reported. EPA's interpretation of the pesticide exemption in…
- Last published: